Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-Finance BINOLI ROAD GANDHI COLONY BUS STAND BAGPAT UTTAR PRADESH 250611 | BAGHPAT | UTTAR PRADESH | 250611 | L1 | Accepted-Finance OK | |
| 2 | L2₹1.3 L+₹8,200 (6.53%)Accepted-Finance PTAEL NAGAR TELIPHONE EXCHANGE BIJROL ROAD BARAUT BAGPAT UTTAR PRADESH 250611 | BAGHPAT | UTTAR PRADESH | 250611 | L2 | Accepted-Finance OK | |
| 3 | L3₹1.3 L+₹8,900 (7.09%)Accepted-Finance | L3 | Accepted-Finance OK | |
| 4 | Rejected-Technical GROUND FLOOR C 002 PRATEEK LAUREL PLOT NO GH 01 SECTOR 120 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201307 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201307 | - | Rejected-Technical NON FULFILMENT OF PQR |
Tender Value
₹1.3 L
EMD Value
₹2,000
Closing Date
15 Apr 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE ETD-I NOIDA
220 KV SUBSTATION SECTOR-20 NOIDA
Bay strengthening of 132 kV Sector 20- Sector -115 Line at 220 kV Substation Sector-20 And 132 kV Substation Sector-115 under ETD-I, Noida
2024_UPTCL_890589_3
E-T-12/02/W/2023-24
Open Tender
Electrical Works
Item Rate
15 days
NOIDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD NOIDA
₹2,000
29 Apr 2024
3 Apr 2024
16 Apr 2024
3 Apr 2024
15 Apr 2024
3 Apr 2024
Amount
Dismantling of jumpers from various equipments such as Isolator/CT/PT/CB by opening of PG Clamps, Isolator clamp, C.T. Clamp & C.B Clamp and dismantling of Single Panther conductor including all associated works. After dismantling, shifting of all scrap material to site store including cost of all T&P and labour required for satisfactory completion of works.
at 220 KV Sec-20 end.
at 132 KV Sec-115 end.
Laying, jumpering and connection of Single Moose Conductor with various 132 KV equipments along with stringing of Jack Bus with Single Moose Conductor. The Work includes cutting of conductor, bending in proper shape, clamping with the help of clamps & connectors, installation of spacers and all other associated work to comoplete the work.
at 220 KV Sec-20 end.
at 132 KV Sec-115 end.
Dismantling of 145 KV C.T. by opening its connectors and jumpers, opening of electrical connection/wiring, disconnection of earthing and all associated works. After dismantling, shifting of all scrap material to site store including cost of all T&P and labour required for stisfactory completion of works.
at 220 KV Sec-20 end.
at 132 KV Sec-115 end.
Erection of new 145 KV C.T. including earthing, electrical connections/wiring as per drawing and connection of jumpers with clamps & connectors and all associated works including shifting of new 132 KV C.T. from store to site.
at 220 KV Sec-20 end.
at 132 KV Sec-115 end.
Dismantling of different span length of 132 KV jack Bus (Single Panther Conductor) at 220 KV S/S Sec-20 end by opening its Jumpers, clamp connector, tension Fitting, disc insulator string and all other associated jobs to complete the work satisfactorily as per technical specification. After dismantling, shifting of all scrap material to site store including cost of all T& P and labour required for satisfactory completion of works. ( 3 Phase of 1 section = 1 job)
section of 44 m
section of 12 m
Stringing of Single Phase 132 KV Jack bus with Moose conductor of different span length as mentioned below. The work includes cutting & bending of conductor,flxing of bolted type double tension/suspension fitting, spacers, making series connection of disc & complete cleaning of disc insulators for all phases by suitable liquid cleaner, hoisting of disc insulator string below beam, proper sagging as per specifiction and all other associated jobs to complete the work satisfactorioly as per technical specifications. After dismantling, shifting of all scrap material to site store including cost of all T&P and labour required for satisfactory completion of works. ( 3 Phase of 1 section= 1 Job)
section of 44 m
section of 12 m
M/S AJAY TOMAR CONTRACTOR
M/S OM SAI CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .