| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹11.5 L+₹6.4 L (127.4%)Admitted-Finance | ₹11.5 L+₹6.4 L (127.4%) | L2 | Admitted-Finance |
| 3 | L3₹15.6 L+₹10.6 L (209.0%)Admitted-Finance | ₹15.6 L+₹10.6 L (209.0%) | L3 | Admitted-Finance |
| 4 | L4₹15.7 L+₹10.7 L (211.7%)Admitted-Finance | ₹15.7 L+₹10.7 L (211.7%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAKESH ELECTRIC WORKS,ECID L2 | M/S Gaurav Electricals L4 | BHARDWAJ ENTERPRISES L1 | N.k. Singh Construction Co. L3 |
|---|---|---|---|---|---|---|---|
| 0.00Construction of Temporary 11 KV, LT Line, Installation of Distribution Transformer, Street Light fitting connection and Camp Connection etc. for Emergency works/V.I.P. Visits in Sangam , parade area during year 2026-27, which includes loading, carriage and unloading of materials from Naini store to work site and work site to Naini store, alongwith dismantling of line after work completion in Mela area, Prayagraj. | |||||||
| 1.00 | Construction of Temporary 11 KV overhead Line from nearest 11 kv tapping point on STP 11 Mtr. long after erection of pole by ACSR weasel/Dog conductor with proper guarding (min 6 No. latching per span) and its earthing. | 0.7 | Ckt. Km. | 8,000 ₹5,600 Lowest | 17,100 ₹11,970 | 8,000 ₹5,600 Lowest | 17,000 ₹11,900 |
| 2.00 | Maintenance of 11 KV overhead line by providing maintenance gang round the clock at occasion. | 0.7 | Ckt. Km. | 6,000 ₹4,200 | 10,152.65 ₹7,106.86 | 5,000 ₹3,500 Lowest | 10,000 ₹7,000 |
| 3.00 | Laying of 11 KV 3x185 mm2 XLPE Cable in Mela area. | 100 | Mtr | 200 ₹20,000 | 104.5 ₹10,450 | 27 ₹2,700 Lowest | 100 ₹10,000 |
| 4.00 | Making of 11 Kv outdoor box 3x185 Sq mm(outdoor box will be provided by the contractor) | 4 | No | 500 ₹2,000 Lowest | 2,850 ₹11,400 | 750 ₹3,000 | 2,800 ₹11,200 |
| 5.00 | Dismantling of 11 KV overhead Line after completion of occasion and receive back complete line from work site to store Naini. | 0.7 | Ckt. Km. | 6,000 ₹4,200 | 12,825 ₹8,977.5 | 3,375 ₹2,362.5 Lowest | 12,000 ₹8,400 |
| 6.00 | Construction of four pole structure on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/ angles, painting (Post office RED on top) and earthing etc and Installation of G.O. 4 Nos. D.O. 2 Nos. fittings, making of Busbar on the top portion of structure with cutting, fabrication and mounting of channel/Angle on four pole. | 1 | Job | 40,000 ₹40,000 | 15,200 ₹15,200 | 4,000 ₹4,000 Lowest | 15,000 ₹15,000 |
| 7.00 | Construction of T/f plinth of size 1.5x1.5.x1.25 Mtr. with Ist class bricks of 0.95 meter height and 0.35 meter thick wall will be constructed. Rest wall should be 0.23 meter thickness. brick work will be in ratio of 1:4 Cement and sand. In the hollow portion the sand should be filled from ground level upto 15 cm. below from the top of plinth. The cement, sand and stone ballast should be placed in ratio 1:2:4 and 2 nos. channels be grouted in the concrete. The T/f plinth should be plastered on all sides by 12mm thick in 1:6 Cement, and mortar. | 1 | No | 7,000 ₹7,000 | 13,775 ₹13,775 | 4,500 ₹4,500 Lowest | 13,000 ₹13,000 |
| 8.00 | Installation of 400 KVA Transformer on plinth and making all HT/LT connections from transformer to L.T Tailless unit and earthing of transformer. | 1 | No. | 5,000 ₹5,000 | 10,925 ₹10,925 | 2,875 ₹2,875 Lowest | 10,900 ₹10,900 |
| 9.00 | Installation of Tailless Unit by providing structure of channels with the help of 3/4 meter long M.S. Channel including mounting of 06 Nos. Tailless Unit 500/300 Amps. Also making of copper bus bar and its tapping, and earthing of structure by earth rod at two Point | 1 | job | 3,000 ₹3,000 | 5,890 ₹5,890 | 1,550 ₹1,550 Lowest | 5,800 ₹5,800 |
Tender Value
₹16.6 L
EMD Value
₹16,570
Closing Date
13 Aug 2026, 2:00 pmClosed
Superintending Engineer
Superintending Engineer, E.U.D.C.-1, 57, George Town, Prayagraj
Refer to Tender Description
2026_PVVNV_1173808_1
13/SE/EUDC-I-PRA/2026-27
Open Tender
Electrical Works
Lump-sum
365 days
Daraganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Account Number-0012002100504911
₹16,570
22 Aug 2026
31 Jul 2026
13 Aug 2026
31 Jul 2026
13 Aug 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Construction of Temporary 11 KV, LT Line, Installation of Distribution Transformer, Street Light fitting connection and Camp Connection etc. for Emergency works/V.I.P. Visits in Sangam , parade area during year 2026-27, which includes loading, carriage and unloading of materials from Naini store to work site and work site to Naini store, alongwith dismantling of line after work completion in Mela area, Prayagraj. | |||||
| 1 | Construction of Temporary 11 KV overhead Line from nearest 11 kv tapping point on STP 11 Mtr. long after erection of pole by ACSR weasel/Dog conductor with proper guarding (min 6 No. latching per span) and its earthing. | 0.7 | Ckt. Km. | - | - |
| 2 | Maintenance of 11 KV overhead line by providing maintenance gang round the clock at occasion. | 0.7 | Ckt. Km. | - | - |
| 3 | Laying of 11 KV 3x185 mm2 XLPE Cable in Mela area. | 100 | Mtr | - | - |
| 4 | Making of 11 Kv outdoor box 3x185 Sq mm(outdoor box will be provided by the contractor) | 4 | No | - | - |
| 5 | Dismantling of 11 KV overhead Line after completion of occasion and receive back complete line from work site to store Naini. | 0.7 | Ckt. Km. | - | - |
| 6 | Construction of four pole structure on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/ angles, painting (Post office RED on top) and earthing etc and Installation of G.O. 4 Nos. D.O. 2 Nos. fittings, making of Busbar on the top portion of structure with cutting, fabrication and mounting of channel/Angle on four pole. | 1 | Job | - | - |
| 7 | Construction of T/f plinth of size 1.5x1.5.x1.25 Mtr. with Ist class bricks of 0.95 meter height and 0.35 meter thick wall will be constructed. Rest wall should be 0.23 meter thickness. brick work will be in ratio of 1:4 Cement and sand. In the hollow portion the sand should be filled from ground level upto 15 cm. below from the top of plinth. The cement, sand and stone ballast should be placed in ratio 1:2:4 and 2 nos. channels be grouted in the concrete. The T/f plinth should be plastered on all sides by 12mm thick in 1:6 Cement, and mortar. | 1 | No | - | - |
| 8 | Installation of 400 KVA Transformer on plinth and making all HT/LT connections from transformer to L.T Tailless unit and earthing of transformer. | 1 | No. | - | - |
| 9 | Installation of Tailless Unit by providing structure of channels with the help of 3/4 meter long M.S. Channel including mounting of 06 Nos. Tailless Unit 500/300 Amps. Also making of copper bus bar and its tapping, and earthing of structure by earth rod at two Point | 1 | job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_2204910.xls
BOQ • 0.30 MB
T-No-13 Sangam VIP Visit.docx
Tender Documents • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .