Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹8.3 LAWARDED | AWARDED |
Tender Value
₹8.3 L
EMD Value
₹20,900
Closing Date
8 Jul 2025, 11:00 pmClosed
Rural Development and Panchayat Raj Department
Construction of Bridge Near Arudha Sanganabasaweshwar Math at Asangihal Village in Almel Taluka (Under 2024-25 5054 Flood)
RDPR/2025-26/BR/WORK_INDENT15447
RDPR/2025-26/BR/WORK_INDENT15447
Open
Bridges/Culverts
Electronic Documents, First(One Cover)
RDPR Division Office Vijayapura
₹500
₹20,900
12 Jun 2025
12 Jun 2025
24 Jun 2025
Construction of Bridge Near Arudha Sanganabasaweshwar Math at Asangihal Village in Almel Taluka (Under 2024-25 5054 Flood)
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-cha...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The ...
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The ...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification A) Granular Material
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading...
Boundary pillar / Guard Stone Reinforced cement concrete M15 grade boundary pillars of
standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .