Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹47.7 CrAdmitted-Finance | -9.99% | ₹47.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹50.3 Cr+₹2.6 Cr (5.52%)Admitted-Finance | -5.02% | ₹50.3 Cr+₹2.6 Cr (5.52%) | L2 | Admitted-Finance |
| 3 | L3₹51.3 Cr+₹3.6 Cr (7.64%)Admitted-Finance 403 GITANJALI ARCADE NEHRU ROAD VILE PARLE EAST MUMBAI MAHARASHTRA 400057 | MUMBAI | MUMBAI | MAHARASHTRA | 400057 | -3.11% | ₹51.3 Cr+₹3.6 Cr (7.64%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical FLAT NO 25 LORD BUDDHA APARTMENT 25 LORD BUDDHA APARTMENT MIYAWALI NAGAR 999 NEW DELHI DELHI 110087 | WEST DELHI | DELHI | 110087 | - | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹53.0 Cr
EMD Value
₹53 L
Closing Date
11 Sept 2023, 5:00 pmClosed
ACE PWD Zone-I Jodhpur
ACE PWD Zone-I Jodhpur
Widening and Strengthening of Revder Jaswantpura Bhinmal Bagoda Rangala Chounchwa Phanta Road 65/0 to 115/0 (SH-16A). Job No.CRIF/1050/RJ/2023-24)
2023_CEPWD_359762_11
NIT No.27/2023-24 of ACE PWD Zone-I Jodhpur (CRIF)
Open Tender
Civil Works
Percentage
455 days
Jalore
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
Executive Engineer, PWD Division Bhinmal
₹53 L
ACE PWD Zone-I Jodhpur
27 Sept 2023
21 Aug 2023
11 Sept 2023
21 Aug 2023
11 Sept 2023
21 Aug 2023
1 Sept 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part 'A' (Road Work)
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MORTH specification clause 201 By mechanical Means . In area of light jungle | 50 | Hect. | 16,224 | ₹8,11,200 |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 metres, stacking serviceable and unserviceable materials separately as per MORTH specification clause 202.By Mechanical Means :Bituminous courses | 6,875 | Cum | 160 | ₹11,00,000 |
| 3 | Earth work in excavation, including stacking/disposal of surplus material with all lifts and lead upto 495 metres, exclusive of compensation of earth [MoRTH specification : Clause 301 to 305] In Ordinary Soil Mechanically by power shovel, including mechanical loading and carriage by tipper/dumper (6T capacity) | 1,45,700 | Cum | 116 | ₹1,69,01,200 |
| 4 | Extra for laying earth as per specification for compaction in 200 mm thick loose layers and dressing [MoRTH Specification Clause 305.3.5].BY MECHANICAL MEANS, using Motor Grader, from earth in stock piles with all lead and lift but excluding rolling and watering. | 2,10,500 | Cum | 26 | ₹54,73,000 |
| 5 | Extra for watering the earth to bring the earth upto required O.M.C excluding rolling | 2,10,500 | Cum | 18 | ₹37,89,000 |
| 6 | Extra for rolling to specification with the use of Vibratory roller when earth is at suitable moisture content with desired field density not less than 95% of maximum dry density (Modify Heavy Proctor test), excluding watering. | 2,10,500 | Cum | 37 | ₹77,88,500 |
| 7 | Providing laying, spreading and compacting specified graded crushed stone in sub-base course including premixing the material at OMC in mechanical mixer (Pug mill), carriage of mixed material, laying in uniform layers with motor grader, F.E.loader on a prepared surface and compacting with vibratory compactor to achieve the desired density including all material, labour, mach-nery, lighting barricading and maintenance of diversion complete.[MoRTH specification Clause 401]. | 48,994.08 | Cum | 819 | ₹4,01,26,151.52 |
| 8 | Extra rate for carriage of mixed material additional lead | 48,994.08 | Cum | 224.57 | ₹1,10,02,600.55 |
| 9 | Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) (incl. lead upto 1000M & all lifts) c) For Grading III Material | 22,500 | Cum | 331 | ₹74,47,500 |
| 10 | Extra rate for carriage of mixed material additional lead | 22,500 | Cum | 241.95 | ₹54,43,875 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.40 MB
Tendernotice_2.pdf
PDF • 8.47 MB
Tendernotice_3.pdf
PDF • 1.69 MB
Tendernotice_4.pdf
PDF • 0.19 MB
Tendernotice_5.pdf
PDF • 0.44 MB
Tendernotice_6.pdf
PDF • 0.41 MB
Tendernotice_7.pdf
PDF • 0.09 MB
Special_condition_CRIF_Sl_N_11.pdf
Tender Documents • 0.19 MB
BOQ_639422.xls
BOQ • 0.34 MB
SBD_CRIF_Sl_N_11.pdf
Tender Documents • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .