Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC | ₹11.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹11.6 LRejected-AOC | ₹11.6 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | POOJA FOUNDATION | ULAGANATHAN J |
|---|---|---|---|---|---|
| 1.00 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | 72 | m3 | 16,200 ₹19,116 | 18,000 ₹21,240 |
| 2.00Supply and Delivery of DI Socket /Spigot Pipes for Class K9 as per is 8329/2000 with ISI marking etc complete as per Standard specifications | |||||
| 2.01 | 200mm DI (VOL II PAG34 | 60 | Mtr | 1,79,700 ₹2.1 L | 1,80,000 ₹2.1 L |
| 3.00 | Laying, jointing ,testing of C. I / DI pipes 4.00Mt Depth including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10 metres and carting of pipes from any of the Board’s stores to the site of work, lowering into trenches and aligning, etc., complete (Timbering included for Depths 2.50m,3.0m,3.5m,..........upto 8.5m)PAG 65 | 60 | Rm | 46,200 ₹54,516 | 48,000 ₹56,640 |
| 4.00 | Shoring, and strutting with sheet piles of size width 400 mm x heightof 3m x thickness of 9mm as per IS 2314-1986 by driving on bothsides of the trench from Ground Level up to the required depth andconnecting the above sheet piles by horizontal strutting with sheetpiles at an interval of 1.0m, fixing the sheet piles by connecting thehorizontal strutting with casurina poles of 8cm to 10cm dia. at 1.50minterval and including removing the sheet piles after the pipelines arelaid, jointed, tested, and stacking it safely for other uses. It includesthe cost of sheet piles and casurina poles including labour charges forerecting the sheet piles, driving the sheet piles, removing the sheetpiles, fixing Casurina poles, etc., complete and all other incidentalcharges for the depths 0-4mts., (VOL II PAG 210) | 60 | Rm | 2,04,000 ₹2.4 L | 2,10,000 ₹2.5 L |
| 5.00Construction of Machineholes using sulphate resistant cement at various depths to invert including earth work excavationas per SS20B, laying cement concrete in C.M.1:3:6 using Crushed stones and (Msand) and 40mm B.G.jelly for foundation,sinking well kerb below G.L.for 4.5m depth and above,pumping,timbering charges for 2.5m depth and above,stock brick work in C.M.1:3, for 23cm thick wall and over 23cm thickwall,plastering interior with C.M.1:3,20mm thick and exterior with C.M.1:3,12mm thick,laying plain cement concrete1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame,providing C.I.steps,machine hole cover and frame,benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc.complete for the following sizes for each machinehole (As per the type design drawing for machinehole) | |||||
| 5.01 | WD-M1456)WD-M1466 1200 mm internal dia, 5000 mm depth | 2 | No | 5,97,400 ₹7.0 L | 6,00,000 ₹7.1 L |
| 6.00 | Dewatering using diesel Engine 10HP pumpset including Hire charges,cost of Diesel,Engine oil,pump operator,labour charges,conveyance of pumpset and fuel to site and back,loading,unloading and any other incidental charges etc complete | 32 | Hrs | 19,680 ₹23,222.40 | 20,800 ₹24,544 |
| 7.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 6 | Cum | 12,930 ₹15,257.40 | 13,200 ₹15,576 |
| 8.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 6 | Cum | 32,400 ₹38,232 | 33,000 ₹38,940 |
Tender Value
₹14 L
EMD Value
₹14,000
Closing Date
29 Sept 2025, 3:00 pmClosed
The Commissioner, Tambaram City Municipal Corporat
No.01,Kalaivani Street , Rajakilpakkam , Chennai-73
Damaged UGSS 200mm DI Pipe Under Ground Sewerage pipe line at Bhayasham nagar 1st street , Purushathaman nagar 5th street and Thiru vi ka nagar well Machineholes in Ward No.36 and 38
2025_DMA_609465_20
171/2025/E1
Open Tender
Civil Works
90 days
Tambaram City Municipal Corporation
Damaged UGSS 200mm DI Pipe Under Ground Sewerage pipe line at Bhayasham nagar 1st street , Purushathaman nagar 5th street and Thiru vi ka nagar well Machineholes in Ward No.36 and 38
2 documents required · 2 mandatory
₹0
₹14,000
10 Jan 2026
27 Sept 2025
29 Sept 2025
27 Sept 2025
29 Sept 2025
27 Sept 2025
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.
Supply and Delivery of DI Socket /Spigot Pipes for Class K9 as per is 8329/2000 with ISI marking etc complete as per Standard specifications
200mm DI (VOL II PAG34
Laying, jointing ,testing of C. I / DI pipes 4.00Mt Depth including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10 metres and carting of pipes from any of the Board’s stores to the site of work, lowering into trenches and aligning, etc., complete (Timbering included for Depths 2.50m,3.0m,3.5m,..........upto 8.5m)PAG 65
Shoring, and strutting with sheet piles of size width 400 mm x heightof 3m x thickness of 9mm as per IS 2314-1986 by driving on bothsides of the trench from Ground Level up to the required depth andconnecting the above sheet piles by horizontal strutting with sheetpiles at an interval of 1.0m, fixing the sheet piles by connecting thehorizontal strutting with casurina poles of 8cm to 10cm dia. at 1.50minterval and including removing the sheet piles after the pipelines arelaid, jointed, tested, and stacking it safely for other uses. It includesthe cost of sheet piles and casurina poles including labour charges forerecting the sheet piles, driving the sheet piles, removing the sheetpiles, fixing Casurina poles, etc., complete and all other incidentalcharges for the depths 0-4mts., (VOL II PAG 210)
Construction of Machineholes using sulphate resistant cement at various depths to invert including earth work excavationas per SS20B, laying cement concrete in C.M.1:3:6 using Crushed stones and (Msand) and 40mm B.G.jelly for foundation,sinking well kerb below G.L.for 4.5m depth and above,pumping,timbering charges for 2.5m depth and above,stock brick work in C.M.1:3, for 23cm thick wall and over 23cm thickwall,plastering interior with C.M.1:3,20mm thick and exterior with C.M.1:3,12mm thick,laying plain cement concrete1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame,providing C.I.steps,machine hole cover and frame,benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc.complete for the following sizes for each machinehole (As per the type design drawing for machinehole)
WD-M1456)WD-M1466 1200 mm internal dia, 5000 mm depth
Dewatering using diesel Engine 10HP pumpset including Hire charges,cost of Diesel,Engine oil,pump operator,labour charges,conveyance of pumpset and fuel to site and back,loading,unloading and any other incidental charges etc complete
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Refilling with excavated earth other than sand with an initial head load of 10 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid