Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.7 LAccepted-AOC | ₹53.7 L | L1 | Accepted-AOC AOC |
| 2 | Rejected-Technical PLOT NO 63 CHERAN COLONY K CHETTIPALAYAM MUTHANAMPALAYAM TIRUPUR | TIRUPUR | TIRUPUR | TAMIL NADU | - | - | Rejected-Technical Ineligible |
| Sl No | Description | Qty | Unit | SREE VALLI AND CO L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 46 | M3 | 131.85 ₹6,065.10 |
| 2.00 | Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam for 150 mm thick specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density,including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers MOST 406 | 46 | M3 | 2,464.3 ₹1.1 L |
| 3.00 | Providing and laying Priming coat 7Kg / 10 Sq.m over WMM surface using of Emulsion Bitumen SS1 for 10 Sq.m and cost Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cast as per special condition appended including labour charges for preparing the surface for laying the Prime coat and for applying the required quantity of bituminous by mechanical sprayer including hire and fuel for all tools and plants employed etc., complete. | 452 | M2 | 86.25 ₹38,985 |
| 4.00 | Providing and laying Tack coat 2.50 Kg / 10 Sq.m over Wet Mix Mecadam surface using of R.S Emulsion Bitumen for 10 Sq.m and cost of Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cost as per special condition appended including labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bituminous by mechanical sprayer including hire and fuel for all tools and plants employed etc., complete as per MORTH Specifications 111,112,501,503 and 900. | 452 | M2 | 19.8 ₹8,949.60 |
| 5.00 | Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,as per clause 503 of MORTH Rev-5 | 5,130 | M2 | 28.65 ₹1.5 L |
| 6.00 | Providing and laying 50 mm compacted thick Dense Bituminuous Macadam using 0.24 cum of 26.50-13.20 mm IRC size HBG metal 0.25 cum of 13.20-2.36 mm IRC size HBG metal.0.23 cum of 2.36 mm and below .01 cum of quarry fine with 53.20 kgs of 60/70 grade bulk bitumen for premixing per sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant20-30 tons capacity,conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grade and cross sections and compaction by 80-100 KN vibratory roller to the required density etc., including labour for loading for loading bitumen into bitumen tank and metal feeder unit,labour for attending to paver site etc including hire charges and fuel charges for 20-30 CMP with bitumen tipper trucks paver finisher,power rollers and all other tools and plant required including all other incidental charges etc., complete as per specification using CMP clause 511 & 501 of Morth Rev-5 | 280 | M3 | 10,562.85 ₹29.6 L |
| 7.00 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen & 5.03Kgs of Shreeded Plastic(10%) for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 168 | M3 | 11,313.9 ₹19.0 L |
| 8.00 | Providing and laying Hot Applied Thermoplastic compound 2.50mm thick including reflectorising glass beadsas per IRC :35, The finshed surface to be level,uniform and free from streaks and holes including all charges etc, complete | 226 | M2 | 890 ₹2.0 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹66,000
Closing Date
27 Jan 2026, 3:00 pmClosed
Executive Officer
. PeriyanaickenpalayamTown Panchayat, Coimbatore District
Improvement of BT Road at MTP to Kasthuripalayam Road Via Ranganathupuram in Periyanaickenpalayam Town Panchayat
2026_DTP_641344_1
31/2026
Open Tender
Civil Works
15 days
Periyanaickenpalayam
As Per Tender Conditions
3 documents required · 3 mandatory
₹0
₹66,000
Yes
Periyanaickenpalayam
7 Feb 2026
9 Jan 2026
27 Jan 2026
9 Jan 2026
27 Jan 2026
9 Jan 2026
9 Jan 2026 - 27 Jan 2026
14 Jan 2026
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications.
Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam for 150 mm thick specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density,including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers MOST 406
Providing and laying Priming coat 7Kg / 10 Sq.m over WMM surface using of Emulsion Bitumen SS1 for 10 Sq.m and cost Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cast as per special condition appended including labour charges for preparing the surface for laying the Prime coat and for applying the required quantity of bituminous by mechanical sprayer including hire and fuel for all tools and plants employed etc., complete.
Providing and laying Tack coat 2.50 Kg / 10 Sq.m over Wet Mix Mecadam surface using of R.S Emulsion Bitumen for 10 Sq.m and cost of Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cost as per special condition appended including labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bituminous by mechanical sprayer including hire and fuel for all tools and plants employed etc., complete as per MORTH Specifications 111,112,501,503 and 900.
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,as per clause 503 of MORTH Rev-5
Providing and laying 50 mm compacted thick Dense Bituminuous Macadam using 0.24 cum of 26.50-13.20 mm IRC size HBG metal 0.25 cum of 13.20-2.36 mm IRC size HBG metal.0.23 cum of 2.36 mm and below .01 cum of quarry fine with 53.20 kgs of 60/70 grade bulk bitumen for premixing per sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant20-30 tons capacity,conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grade and cross sections and compaction by 80-100 KN vibratory roller to the required density etc., including labour for loading for loading bitumen into bitumen tank and metal feeder unit,labour for attending to paver site etc including hire charges and fuel charges for 20-30 CMP with bitumen tipper trucks paver finisher,power rollers and all other tools and plant required including all other incidental charges etc., complete as per specification using CMP clause 511 & 501 of Morth Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen & 5.03Kgs of Shreeded Plastic(10%) for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providing and laying Hot Applied Thermoplastic compound 2.50mm thick including reflectorising glass beadsas per IRC :35, The finshed surface to be level,uniform and free from streaks and holes including all charges etc, complete
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_768116.xls
BOQ • 0.28 MB
Technicalbidturipl.pdf
Additional Documents • 0.27 MB
Download all tender documents and submit your bid