Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance CINEMA ROAD PARASI ANPARA DISTT SONEBHADRA U P PIN 231225 | SONBHADRA | UTTAR PRADESH | 231225 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance 001 00 BANK COLONY SHIVPURI SHIVPURI MADHYA PRADESH 473551 | SHIVPURI | MADHYA PRADESH | 473551 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.6 L
EMD Value
₹3,300
Closing Date
22 Dec 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM(EXCV)NCL, NIGAHI PROJECT
OFFICE OF GENERAL MANAGER (EXCV)NCL, NIGAHI PROJECT, PO-NIGAHI, DISTT-SINGRAULI(MP)
Repairing / rewinding of 03 Nos. 22KW H/D Blower Motor, 03 Nos. 2.2 KW 3Phase , 380V Swing oil lubrication pump motor and 08 Nos. 7.5KW Swing Blower Motor of ESH 20/90 Dragline working at Nigahi Project.
2025_NCL_349124_1
NGH/EXCV/TENDERS/25-26/078
Open Tender
Excavation Department Work
Item Rate
90 days
NCL NIGAHI PROJECT
AS PER NIT
4 documents required · 4 mandatory
₹3,300
23 Dec 2025
9 Dec 2025
23 Dec 2025
9 Dec 2025
22 Dec 2025
10 Dec 2025
9 Dec 2025 - 16 Dec 2025
Amount
Scope of Work: 1) Dismantling of motor. 2) Removing of burnt coil from slot portion. 3) Cleaning of slot portion of stator and varnishing . 4) Rewinding of coils with H Class super enameld copper wire. 5) Fitting of coil in proper slots portion with nomex paper. 6) Fixing of coil with the help of cotton tape, glass tape, soldering materials, wedge, lead, sleeve, lugs etc. 7) Assembling , Heating and final testing. Maximum likely manpower to be deployed per shift: 06 Nos. ( 04 Nos. Skilled and 02nos semi-skilled).
Repairing/ rewinding of 03 Nos. 22KW H/D Blower Motor :
Cost of Super Enameled copper wire for rewinding ( 22 Kg each Motor ) Total 03 Nos. H/D Blower Motor
Cost of Nomex paper ( 2.2 Kg each Motor ) Total 03 Nos. H/D Blower Motor
Cost of Insulating varnish ( 2.5Ltr each Motor ) Total 03 Nos. H/D Blower Motor
Cost of Soldering material, glass tape, sleeve, cotton tape, Lead wire, Lus, wedge etc.for repairing / rewinding work (03 nos. H/D Blower Motor for repair)
Cost of bearing size (62313) for 1 No. each Motor Total 03 Nos. H/D Blower Motor.
Cost/charges for repairing of bearing housing DE & NDE of each motor (labour consisting of Skilled Fitter , Skilled Welder and semi skilled manpower) including labour charges , contractor profit , etc. Total 03 Nos. H/D Blower Motor
Charges of Heating ( 20 Hr each Motor ) Total 03 Nos. H/D Blower Motor
Charges for Machining of rotor shaft ( 8 Hrs. each motor) Total 03 Nos. H/D Blower Motor
Cost/charges for repairing and rewinding of each motor (labour consisting of Skilled winder and semi skilled manpower) including labour charges , contractor profit , etc. Total 03 Nos. H/D Blower Motor
less of scrap copper wire cost ( 22 kg each Motor ) Total 03 Nos. H/D Blower Motor
Repairing / rewinding of 03 No. 2.2KW, 3Phase , 380V Swing Oil Lubrication Pump Motor
Cost of Super Enameled copper wire for 2.2 Kg. each Motor (03 nos. Swing Oil Lubrication Pump Motor )
Cost of Nomex paper 3mill for 0.22 Kg. each Motor ( Total 03 Nos. Swing Oil Lubrication Pump Motor )
Cost of Insulating varnish (1Ltr each Motor ) ( Total 03 Nos. Swing Oil Lubrication Pump Motor )
Cost of Soldering material, glass tape, sleeve, cotton tape, Lead wire, Lus, wedge etc.for repairing / rewinding work ( Total 03 Nos. Swing Oil Lubrication Pump Motor )
Cost of bearing size 6205ZZ ( SKF -make ) for replacement work for 2Nos. each Motor ( Total 03 Nos. Swing Oil Lubrication Pump Motor )
Cost/charges for repairing of bearing housing DE & NDE of each motor (labour consisting of Skilled Fitter , Skilled Welder and semi skilled manpower) including labour charges , contractor profit , etc.( Total 03 Nos. Swing Oil Lubrication Pump Motor )
Cost/ charges for removal of burnt coil, cleaning of slot and rewinding (labour consisting of Skilled winder and semi skilled manpower) including labour charges , contractor profit , etc. ( Total 03 Nos. Swing Oil Lubrication Pump Motor )
Charges of Heating ( 20 Hr each Motor ) Total 03 Nos. Swing Oil Lubrication Pump Motor
Charges for Machining of rotor shaft ( 4 Hrs. each motor) Total 03 Nos. Swing Oil Lubrication Pump Motor
less of scrap copper wire cost for 2.2Kg. each Motor Total 03 Nos. Swing Oil Lubrication Pump Motor
Repairing/ rewinding of 08 Nos. 7.5KW Motor, 380V 3Phase Swing Blower Moitor :
Cost of Super Enameled copper wire for rewinding ( 7.5 Kg each Motor ) Total 08 Nos. Swing Blower Motor
Cost of Nomex paper ( 0.75 Kg each Motor )Total 08 Nos. Swing Blower Motor
Cost of Insulating varnish ( 2Ltr each Motor ) Total 08 Nos. Swing Blower Motor
Cost of Soldering material, glass tape, lead wirw, lugs, sleeve, wedge & cotton tap etc.for repairing / rewinding work ( Total 08 Nos. Swing Blower Motor)
Cost of Air Fan 5.5" x 5.5" fitting for 01 Nos. each Motor ( Total 08 Nos. Swing Blower Motor)
Cost of Cover Fan 6" x 6" fitting for 01 Nos. each Motor ( Total 08 Nos. Swing Blower Motor)
Cost of bearing size (623092RS1) for 2 Nos. each Motor Total 08 Nos. Swing Blower Motor.
Cost/ charges for removal of burnt coil, cleaning of slot and rewinding (labour consisting of Skilled winder and semi skilled manpower) including labour charges , contractor profit , etc. ( Total 08 Nos. Swing Blower Motor )
Charges of Heating ( 20 Hr each Motor ) Total 08 Nos. Swing Blower Motor
Charges for Machining of rotor shaft ( 8 Hrs. each motor) Total 08 Nos. Swing Blower Motor
Cost/charges for repairing of bearing housing DE & NDE of each motor (labour consisting of Skilled Fitter , Skilled Welder and semi skilled manpower) including labour charges , contractor profit , etc. Total 08 Nos. Swing Blower Motor
less of scrap copper wire cost for 7.5Kg. each Motor (08 nos. Swing Blower Motor)
Total impact of GST for the purpose of CTC
S K ENTERPRISES (BID ID -1205650)
Moon Electrical and Engineering Workshop (BID ID -1205652)
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.65 MB
ANNEXURESANDOTHERMPORTANTDOCUMENTS.pdf
Tender Documents • 0.69 MB
UNDERTAKINGASPERANNEXUREII.pdf
Tender Documents • 0.41 MB
BOQ_361852.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .