Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹32.8 L
EMD Value
₹65,588
Closing Date
1 Dec 2026, 9:00 am5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
DSCO Gurdaspur
Room no 401 402 Third Floor Block B District Administration Complex Gurdaspur
Rain Water Harvesting cum Silt Detention Structure
2026_DOA_179551_1
DSWC/GUR/2026-2027/14
Open Tender
Civil Works
Item Wise
90 days
Dharkalan
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹65,588
20 Nov 2026
20 Nov 2026
1 Dec 2026
20 Nov 2026
1 Dec 2026
20 Nov 2026
30 days
CSR 29.70 CSR29.71
Pipe Dia Excavation Lowering TC Jointing Cutting Cutting AVP Fixing AAV Fixing AVP
435 0.4 1.2 mat lab
with 850 bajri & 850 sand
Cement sand bajri lab Total
198.13 Cement sand bajri lab Total
calculation for 800 mm cement 245,sand 1200,bajri 1400
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village DASKA (C/o 11180/L) District Sangrur
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1344 /m3 53 71232
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 700 /Mtrs 54.46 38122
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 280 /Joints 221.52702886247877 62027.56808149406
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 6 /Cut hole 47.25 283.5
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 2 /Cut hole 13.049999999999999 26.099999999999998
Fixing of Risers & Alfa valves with C.C 1:2:4 6 /Riser & Valve 733.9434069043576 4403.660441426146
Fixing of Air vent Pipes with C.C 1:2:4 2 /Air pipe 226.3786078098472 452.7572156196944
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 66.28 Rupees Sixty Six and Twenty Eight Paise Only 530.24
B.B.C 1:8:16 0.6 cum 2771.21 Rupees Two Thousand Seven Hundred Seventy One and Twenty One Paise Only 1662.7259999999999
Plain Cement Concrete 1:2:4 0.14 cum 3829.07314285714 Rupees Three Thousand Eight Hundred Twenty Nine and Seven Paise Only 536.0702399999997
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 3589.2781202526326 Rupees Three Thousand Five Hundred Eighty Nine and Twenty Seven Paise Only 17049.071071200004
12.5 mm thick cement plaster work 1:4 15.32 cum 94.11296240208875 Rupees Ninety Four and Eleven Paise Only 1441.8105839999998
RCC Slab 1:2:4 0.21 cum 7434.5 Rupees Seven Thousand Four Hundred Thirty Four and Fifty Paise Only 1561.245
Foot rest (Item No. 29.37) 8 No 116.1 Rupees One Hundred Sixteen and Ten Paise Only 928.8
Total Cost for ONE Haudi 23710
Total Cost for ZERO Haudi 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Shutter Gate 0 each 7500 Rupees Seven Thousand Five Hundred Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Gate Valve 2 each 29900 Rupees Twenty Nine Thousand Nine Hundred Only 59800
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 283 Per joint 24 Rupees Twenty Four Only 6792
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 Overall 26424 Rupees Twenty Six Thousand Four Hundred Twenty Four Only 26424
Grand Total 269563.5857385399
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village KALBANJARA (C/o 69500/L) District Sangrur
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1840 /m3 53 97520
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 920 /Mtrs 54.46 50103.200000000004
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 368 /Joints 221.52702886247877 81521.94662139218
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 8 /Cut hole 47.25 378
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 4 /Cut hole 13.049999999999999 52.199999999999996
Fixing of Risers & Alfa valves with C.C 1:2:4 8 /Riser & Valve 733.9434069043576 5871.547255234861
Fixing of Air vent Pipes with C.C 1:2:4 4 /Air pipe 226.3786078098472 905.5144312393888
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 66.28 Rupees Sixty Six and Twenty Eight Paise Only 530.24
B.B.C 1:8:16 0.6 cum 2771.21 Rupees Two Thousand Seven Hundred Seventy One and Twenty One Paise Only 1662.7259999999999
Plain Cement Concrete 1:2:4 0.14 cum 3829.07314285714 Rupees Three Thousand Eight Hundred Twenty Nine and Seven Paise Only 536.0702399999997
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 3589.2781202526326 Rupees Three Thousand Five Hundred Eighty Nine and Twenty Seven Paise Only 17049.071071200004
12.5 mm thick cement plaster work 1:4 15.32 cum 94.11296240208875 Rupees Ninety Four and Eleven Paise Only 1441.8105839999998
RCC Slab 1:2:4 0.21 cum 7434.5 Rupees Seven Thousand Four Hundred Thirty Four and Fifty Paise Only 1561.245
Foot rest (Item No. 29.37) 8 No 116.1 Rupees One Hundred Sixteen and Ten Paise Only 928.8
Total Cost for ONE Haudi 23710
Total Cost for ZERO Haudi 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Shutter Gate 0 each 7500 Rupees Seven Thousand Five Hundred Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Gate Valve 5 each 29900 Rupees Twenty Nine Thousand Nine Hundred Only 149500
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 368 Per joint 24 Rupees Twenty Four Only 8832
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 Overall 34733 Rupees Thirty Four Thousand Seven Hundred Thirty Three Only 34733
Grand Total 429417.4083078664
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
FINANCIAL BID E-Tender No. – DSWC/GUR/2026-2027/14
All Construction Material as Per PWD Specifications & All Material as Per ISI Standred With The Pre Approval of Departmental Officials
Rain Water Harvesting cum Silt Detention Works, Village Niari (Lahri Choe), Village Naloh, Village Panjala, Village Sukret and Village Niari Block Dhar Kalan Distt. Pathankot.
Name and Address of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs 3279400
Quoted by Contractor (As % less of Estimated Amount) Less (-/+%)
WORK-1 :- Rain Water Harvesting cum Silt Detention Works, Village Niari (Lahri Choe), Block Dharkalan, Distt. Pathankot.
Est. No. 1934/D.B, Dated 24.07.2026, Amount 5,07,900/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 183510 324467 -
COST OF MATERIAL (RWHS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 214 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 33.87 cum 1031 per cum
3 Cost of Stone Aggregate 6.68 cum 618.34 per cum
4 Cost of Bajri 5.98 Cum 713.52 per cum
5 Cost of Boulder 98.41 cum 772.23 per cum
COST OF LABOUR (RWHS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 43.26 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 6.68 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 6.65 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 30.14 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 59.32 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 43.808 Sqm 159.08
WORK-2 :- Rain Water Harvesting cum Silt Detention Works, Village Naloh, Block Dharkalan, Distt. Pathankot.
Est. No. 1930/D.B, Dated 24.07.2026, Amount 7,13,400/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 247709 450503 -
2 Crate wire Structure 9378 5904 -
COST OF MATERIAL (RWHS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 290 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 46.26 cum 1015 per cum
3 Cost of Stone Aggregate 8.43 cum 599.93 per cum
4 Cost of Bajri 7.48 Cum 694.66 per cum
5 Cost of Boulder 137.44 cum 753.09 per cum
COST OF LABOUR (RWHS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 72.24 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 8.43 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 8.33 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 39.77 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 85.18 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 50.62 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 916.37 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-3 :- Rain Water Harvesting cum Silt Detention Works, Village Panjala, Block Dharkalan Distt. Pathankot.
Est. No. 19472/D.B, Dated 02.11.2026, Amount 6,95,200/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure-1 247106 432583 -
5 Crate wire Structure 9800 5903 -
Cost Of Material (RWHS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 293 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 45.87 cum 1015 per cum
3 Cost of Stone Aggregate 9.72 cum 617.6 per cum
4 Cost of Bajri 8.88 Cum 712.34 per cum
5 Cost of Boulder 130.16 cum 770.76 per cum
COST OF LABOUR (RWHS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 67.22 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 9.72 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 9.87 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 42.28 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 76.05 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 67.09 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 934.05 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-4 :- Rain Water Harvesting cum Silt Detention Works, Village Sukret, Distt. Pathankot.
Est. No. 17831/D.B, Dated 13.10.2026, Amount 6,73,700/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 226239 432583 -
2 Crate wire Structure 9003 5903 -
COST OF MATERIAL (RWHS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 293 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 45.87 cum 1015 per cum
3 Cost of Stone Aggregate 9.72 cum 477.33 per cum
4 Cost of Bajri 8.88 Cum 572.06 per cum
5 Cost of Boulder 130.16 cum 630.49 per cum
COST OF LABOUR (RWHS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 67.22 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 9.72 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 9.87 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 42.28 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 76.05 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 67.09 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 793.77 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-5 :- Rain Water Harvesting cum Silt Detention Works, Village Niari, Distt. Pathankot.
Est. No. 17760/D.B, Dated 12.10.2026, Amount 6,89,200/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 241190 432583 -
2 Crate wire Structure 9606 5903 -
COST OF MATERIAL (RWHS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 293 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 45.87 cum 1015 per cum
3 Cost of Stone Aggregate 9.72 cum 577.83 per cum
4 Cost of Bajri 8.88 Cum 672.57 per cum
5 Cost of Boulder 130.16 cum 731 per cum
COST OF LABOUR (RWHS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 67.22 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 9.72 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 9.87 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 42.28 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 76.05 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 67.09 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 894.28 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
DNIT14.pdf
Tender Documents • 1.15 MB
144fb.xls
Tender Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .