| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.8 CrAccepted-AOC 402 3RD FLOOR DEV PALACE M G ROAD KARUR 639 001 | KARUR | TAMIL NADU | 639001 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹58.4 Cr+₹2.9 Cr (5.20%)Rejected-Finance | L2 | Rejected-Finance Highest Bid | |
| 3 | L3₹59.5 Cr+₹4.1 Cr (7.31%)Rejected-Finance PALANI DINDIGUL DISTRICT | PALANI | DINDIGUL | L3 | Rejected-Finance Highest Bid | |
| 4 | L4₹60.2 Cr+₹4.7 Cr (8.55%)Rejected-Finance HIG 25 80 FEET ROAD ARINGAR ANNA NAGAR MADURAI 625 020 | MADURAI | MADURAI | TAMIL NADU | 625020 | L4 | Rejected-Finance Highest Bid | |
| 5 | Rejected-Technical 2 396 3 KARAIANDHIPUTHUR PAPPANAICKENPATTI POST NAMAKKAL 637003 | NAMAKKAL | NAMAKKAL | TAMIL NADU | 637003 | - | Rejected-Technical Yearwise breakup details for experience Certificate not furnished. |
Tender Value
₹53.1 Cr
EMD Value
₹26.6 L
Closing Date
22 Sept 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
Office of the Superintending Engineer, Highways, NABARD and Rural Roads Circle, Opposite to Government workshop, Manakkadu Bus stop, Hasthampatty, Salem - 7
Forming Bypass to Namakkal town Km.16/0-22/387 (Phase-V)
2025_HWAY_590743_1
TN.No.15 /2025-2026 / SDO/Dated.05.08.2025
Open Tender
Civil Works - Roads
Percentage
455 days
Salem
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹26.6 L
29 Dec 2025
8 Aug 2025
23 Sept 2025
8 Aug 2025
22 Sept 2025
8 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Jungle including uprooting trunk vegetation, grass, bushes, shrubs, sapplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness. as per Table - 201 MORT & H specification | 1,12,050 | Square Metre | 6.89 | ₹7,72,024.5 |
| 2 | Earthwork excavation in Kankar / Soft disintegrated rock not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per section 300 of MORTH Specification - Fifth revision as per Cl.4.2.5.1 of IS : 1200 Part-1-1992. | 872.8 | Cubic Metre | 196.44 | ₹1,71,452.83 |
| 3 | Earthwork excavation in rock requiring blasting (hard rock) and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete. | 12,282.1 | Cubic Metre | 932.55 | ₹1,14,53,672.36 |
| 4 | Earth work excavation in cutting all classes of soils as per SS20B compacted thickness, watering, compaction by 80 - 100 KN power roller, rolling to achieve the required maximun dry density inculding labour charges for sactioning, watering with all leads for water inculding fuel and hire charges for power roller, water sprinker and other tools and plant employed etc, complete icluding Sl.No.61 page No:22 of current SOR 2025-26 | 26,144.3 | Cubic Metre | 131.89 | ₹34,48,171.73 |
| 5 | Forming Embankment using carted earth as per SS20B including cost of all labour charges, materials With a lead of 33km conveyance charges tools, equipments and all incidental charges, including compacting with powerroller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For embankment - 95% compaction | 12,781.3 | Cubic Metre | 775.66 | ₹99,13,943.16 |
| 6 | Forming /Construction of subgrade using carted earth as per SS20B including cost of all labour charges, materials with a lead of 33km conveyance charges tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For sub grade - 97% compaction. | 67,223.5 | Cubic Metre | 897.01 | ₹6,03,00,151.74 |
| 7 | Refilling the excavated earth including conveyance of all materials to work site, including labour charges for filling in layers compacting by manual labour under optimum moisture content to get maximum density of layers including all incidental charges etc, complete for forming embankment Labour charges only. | 32,344.1 | Cubic Metre | 45.85 | ₹14,82,976.98 |
| 8 | Picking the existing BT surface up to 50 mm thick depth etc complete as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed for the work and including all other incidental charges etc., complete as per MORTH Specification. | 2,548 | Square Metre | 23.36 | ₹59,521.28 |
| 9 | Granular Sub-base with Graded Material (Table:- 400-1) Plant Mix Method : Construction of Granular sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Specification (Vth Revision) - for Grading- V Material for i) Main work and ii) Junction Improvements at Km 22/200. | - | Cubic Metre | 2,210.05 | - |
| 10 | Granular Sub-base with Graded Material (Table:- 400-1) Plant Mix Method : Construction of Granular sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Specification (Vth Revision) - for Grading- III Material for i) Main work and ii) Junction Improvements at Km 22/200. | - | Cubic Metre | 2,483.08 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_705573.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .