| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85.5 LAccepted-AOC 1 SRI GOKULAM COMPLEX 15 155B MARAPALAM MADUKKARAI COIMBATORE DISTRICT 641 105 | COIMBATORE | TAMIL NADU | 641105 | ₹85.5 L | L1 | Accepted-AOC Accept |
| 2 | Rejected-Technical 42 641 009 | COIMBATORE | TAMIL NADU | 641009 | - | - | Rejected-Technical Evaluation Rejected |
| Sl No | Description | Qty | Unit | ABBI ASSOCIATES L1 |
|---|---|---|---|---|
| 1.00 | Dismantling plain cement concrete as per the direction of Departmental officer | 551 | m3 | 572 ₹3,15,172 Lowest |
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 623 | m3 | 128 ₹79,744 Lowest |
| 3.00 | Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights. | 346 | m2 | 533 ₹1,84,418 Lowest |
| 4.00 | Cement concrete 1:4:8 (One cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted, complying with standard specification including conveyance of materials by with lead and lift etc., complete | 623 | m3 | 5,962 ₹37,14,326 Lowest |
| 5.00 | Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification | 103 | m2 | 478 ₹49,234 Lowest |
| 6.00 | Cement concrete 1:2:4(One cement two sand & four broken stone) using 20mm guage hard broken granite stone jelly compacting etc., including all labour and material charges completed as per complying with Standard Specifications etc | 562 | m3 | 7,266 ₹40,83,492 Lowest |
| 7.00 | Removal of Excavated Excess Earth away from the site to 5K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 1,174 | m3 | 104 ₹1,22,096 Lowest |
Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
9 Mar 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Restoration of Cement Concrete Road Muthiya nagar, Velanganni nagar, EB colony, Panchayat office road and Ward areas in ward-98 South Zone.. Package No.7
2026_MAWS_670439_7
e32/2026
Open Tender
Civil Works
Works
60 days
Coimbatore corporation
AS PER TENDER DOCUMENT
5 documents required · 5 mandatory
₹10,000
₹1.0 L
20 Apr 2026
5 Mar 2026
9 Mar 2026
5 Mar 2026
9 Mar 2026
5 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling plain cement concrete as per the direction of Departmental officer | 551 | m3 | - | - |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 623 | m3 | - | - |
| 3 | Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights. | 346 | m2 | - | - |
| 4 | Cement concrete 1:4:8 (One cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted, complying with standard specification including conveyance of materials by with lead and lift etc., complete | 623 | m3 | - | - |
| 5 | Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification | 103 | m2 | - | - |
| 6 | Cement concrete 1:2:4(One cement two sand & four broken stone) using 20mm guage hard broken granite stone jelly compacting etc., including all labour and material charges completed as per complying with Standard Specifications etc | 562 | m3 | - | - |
| 7 | Removal of Excavated Excess Earth away from the site to 5K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 1,174 | m3 | - | - |
stage.html
html • 0.04 MB
techsummary_806094.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
ITB.pdf
Additional Documents • 0.19 MB
TenderDocument.pdf
Tender Documents • 1.24 MB
BOQ_806094.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .