| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.8 LAdmitted-Finance | -7.99% | ₹12.8 L | L1 | Admitted-Finance |
| 2 | L2₹12.9 LAdmitted-Finance | -7.30% | ₹12.9 L | L2 | Admitted-Finance |
| 3 | L3₹13.0 LAdmitted-Finance ETAWAH | -6.50% | ₹13.0 L | L3 | Admitted-Finance |
| 4 | L4₹13.1 LAdmitted-Finance | -5.50% | ₹13.1 L | L4 | Admitted-Finance |
| 5 | L5₹13.9 LAdmitted-Finance ITWA | -0.10% | ₹13.9 L | L5 | Admitted-Finance |
Tender Value
₹13.9 L
EMD Value
₹1.4 L
Closing Date
27 Apr 2026, 11:00 amClosed
E.O.
N.P. Ekdil
Construction C.C. Road and Nali Slab etc hariram Shakya house to hariram plot Mohalla Station Road harinagar.
2026_DOLBU_1133942_1
06/EN/NPE/2026-27/16
Open Tender
Civil Works
30 days
N.P. Ekdil
Construction C.C. Road and Nali Slab etc hariram Shakya house to hariram plot Mohalla Station Road harinagar.
2 documents required · 2 mandatory
₹1,660
Yes
E.O.
₹1.4 L
Yes
N.P. Ekdil
18 May 2026
7 Apr 2026
27 Apr 2026
7 Apr 2026
27 Apr 2026
7 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in filling cartage up to 8.0 km excluding royality | - | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Earth work in excavation in foundation in ordinary soil (loam, clay or sand )including lift up to 1.5 meter and lead up to 30 meter all as per sor 251 | - | Cum | - | - | - |
| 3 | Cement concrete in 1:4:8 cement and coarse sand with approved stone ballast all as per sor no 281 | - | Cum | - | - | - |
| 4 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | - | Cum | - | - | - |
| 5 | First class brick work in 1:4 cement and coarse sand including supply of all materials ,labour and t&p all as per 303 N.S | - | Cum | - | - | - |
| 6 | 12 mm cement plaster of mix 1:4 cement and c sand asper dsr 13.4.2 | - | Sqm | - | - | - |
| 7 | Providing and laying 125 micron polythene sheet all as per sor | - | Cum | - | - | - |
| 8 | Cement concrete with 2cm gauge approved stone ballast approved coarse sand cement in the proportion of 1:2:4 including supply of all material t&petc all as per sor no 279a | - | Cum | - | - | - |
| 9 | Supply and fixing inougration stone all complete | - | Cum | - | - | - |
| 10 | RCC work with cement approved coarse sand and 2 cm gauge approved stone ballast in the proportion of 1:2:4 all as per sor si no 283 | - | Cum | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_2116645.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid