Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical R O CHUCHOT GONGMA | POONCH | JAMMU AND KASHMIR | 185101 | Accepted-Technical Admitted |
| 2 | Accepted-Technical | Accepted-Technical Admitted |
| 3 | Accepted-Technical | Accepted-Technical Admitted |
| 4 | Accepted-Technical | Accepted-Technical Admitted |
| 5 | Accepted-Technical | Accepted-Technical Admitted |
Tender Value
₹20.9 L
EMD Value
₹41,760
Closing Date
15 Jul 2026, 4:00 pmClosed
Executive Engineer Igoo Phey Division Leh
Executive Engineer Igoo Phey division Leh
Improvement of Igoo Phey Canal by way of strengthening of main canal and distributor channels including pitching and grouting extention of distrbutor channels/cross drainage for Igoo Phey canal by way of construction of culverts at various location o
2026_PWD_19162_1
E-Tender 04of IPD Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
45 days
Leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer Igoo Phey Division Leh
₹41,760
21 Jul 2026
4 Jul 2026
16 Jul 2026
5 Jul 2026
15 Jul 2026
5 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5min width or 10 sqm on plan), including dressing of sides and ramming of bottoms, liftupto1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m. All kinds of soil. | 47.84 | Cum | 278.09 | ₹13,303.83 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 171.6 | Cum | 7,839.48 | ₹13,45,254.77 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.2 | Cum | 9,048.91 | ₹83,249.97 |
| 4 | Steel reinforcement for R.C.C.work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Mild steel and Medium Tensile steel bars. | 1,150 | Kg | 106.72 | ₹1,22,728 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for Edges of slabs and breaks in floors and walls Under 20 cm wide. | 286.08 | Sqm | 266.48 | ₹76,234.6 |
| 6 | Filling availableexcavatedearth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm indepth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 147.2 | Cum | 220.4 | ₹32,442.88 |
| 12 | Carriage of materials from source to site of work. Cement an avg. lead 20 km. | 58.56 | MT | 342.05 | ₹20,030.45 |
| 13 | Sand an avg. lead 15 km. | 81.12 | Cum | 328.13 | ₹26,617.91 |
| 14 | Aggreagte an avg. lead 15 km. | 153.6 | Cum | 328.13 | ₹50,400.77 |
| 15 | Steel an avg. lead 10 km. | 1.14 | MT | 241.38 | ₹275.17 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_45630.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .