| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.3 LAccepted-AOC 13193 GALI NO 9 NAMDEV MARG BATHINDA | ₹78.3 L | L1 | Accepted-AOC Lowest Quoted Amount |
| 2 | L2₹79.0 LRejected-Finance GURDASPUR CITY | ₹79.0 L | L2 | Rejected-Finance Higher Quoted Amount |
Tender Value
₹79.1 L
EMD Value
₹1.6 L
Closing Date
16 Mar 2026, 12:00 pmClosed
DSCO Keshav Kumar
Opposite Aggarwal Hospital, Kishanpura Road, Sangrur
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV/Sluice Valves, Construction of Haudies and all other allied works.
2026_DOA_162039_1
DSWC/SAN/2025-2026/33
Open Tender
Pipe Laying Works
365 days
Sangrur
Please refer tender documents.
3 documents required · 3 mandatory
₹2,000
₹1.6 L
16 Apr 2026
5 Mar 2026
16 Mar 2026
5 Mar 2026
16 Mar 2026
5 Mar 2026
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
Divisional Soil Conservation Officer, Sangrur
Tender No: DSWC/SAN/2025-26/33
Name of the Firm/Bidder
Address of Firm/Bidder
Mobile No of Firm/Bidder Email ID of Firm
Total Estimated Amount of Works Rs. Rupees Seventy Nine Lakhs Seven Thousand Nine Hundred Eleven Only
Quoted by Contractor {- or + to estimated amount, in figure upto 2 dcimal point only} Quote (-/+)
Note: Please quote only figure (upto 2 decimal points) in above blue colour box in minus or plus. Do not put %age sign after this figure. Please check Quoted Rate in Next cell.
Note: Please refer to DNIT for item wise rate and details.
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 500 mm Dia RCC Pipes, fixing of AVP, NP3 Pipes, Risers, Construction of Haudies at Village - Rogla, (30267/L, Extension), Tehsil Dirba and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 24844.5 /Cum 93.78 Ninety Three rupees and Seventy Eight paise
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. /Mtrs 71 Seventy One rupees
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 5440 /Joints 300.32 Three Hundred Rupees and Thirty Two paise
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (500mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 45 /Meter 3776.8 Three Thousand Seven Hundred Seventy Six rupees and Eighty paise
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (500 mm) 128 /Cut hole 127 One Hundred Twenty Seven rupees
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 30 /Cut hole 41 Forty One rupees
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (500mm) 128 /Riser & Valve 902.09 Nine Hundred Two Rupees and Nine paise
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 30 /Air pipe Two Hundred Ninty Rupees and Twenty One Paise
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Ninety Three rupees and Seventy Eight paise
B.B.C 1:8:16 0.6 cum 3887.39 Three Thousand Eight Hundred Eighty Seven Rupees and Thirty Nine paise
Plain Cement Concrete 1:2:4 0.14 cum 5150.45 Five Thousand One Hundered Fifty Rupees and Forty Five paise
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum Five Thousand Fifty Three Rupees and Thirty Five Paise
12.5 mm thick cement plaster work 1:4 15.32 cum 202.53 Two Hundred Two rupees and Fifty Three paise
RCC Slab 1:2:4 0.21 cum 8242.91 Eight Thousand Two Hundred Forty Two rupees and Ninty One paise
Foot rest (Item No. 29.37) 6 No 100 One Hundred rupees
Total Cost for ONE Haudi
Total Cost for 30 Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Four Thousand rupees
Sign Board (5' X 3') 1 each 4000 Four Thousand rupees
Fixing of gate valve (500 mm) 34 each 2227.9 Two Thousand Two Hundred Twenty Seven rupees and Ninty paise
Nimar for jointing the pipe (500mm) 1148.93 Per kg 60 Sixty rupees
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 2110.17 per tonnes 209.86 Two Hundred Nine rupees and Eighty Six paise
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 32660
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 250 mm Dia RCC Pipes, fixing of AVP, Risers, Gate Valve, Construction of Haudies at Village - (Mehlan, 14940/L, Extension), Tehsil Dirba and District Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 900.6 /Cum 93.78 Ninety Three rupees and Seventy Eight paise
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. /Mtrs 70 Seventy rupees
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 316 /Joints 91.5 Ninty One rupees and Fifty paise
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (250mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 10 /Meter 989.24 Nine Thousand Eighty Nine rupees and Twenty Four paise
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (250 mm) 6 /Cut hole 62 Sixty Two rupees
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 2 /Cut hole 41 Forty One rupees
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (250mm) 6 /Riser & Valve 440.22 Four Hundred Forty rupees and Twenty Two paise
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 2 /Air pipe 290.31 Two Hundred Ninty rupees and Thirty One paise
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Ninety Three rupees and Seventy Eight paise
B.B.C 1:8:16 0.6 cum 3884.91 Three Thousand Eight Hundred Eighty Four rupees and Ninty One paise
Plain Cement Concrete 1:2:4 0.14 cum 5153.58 Five Thousand One Hundered Fifty Three rupees and Fifty Eight paise
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum Five Thousand Fifty Two rupees and Eleven paise
12.5 mm thick cement plaster work 1:4 15.32 cum 202.45 Two Hundred Two rupees and Forty Five paise
RCC Slab 1:2:4 0.21 cum 8245.36 Eight Thousand Two Hundred Forty Five rupees and Thirty Six paise
Foot rest (Item No. 29.37) 6 No 100 One Hundred rupees
Total Cost for ONE Haudi
Total Cost for 3 Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Four Thousand rupees
Sign Board (5' X 3') 0 each 4000 Four Thousand rupees
Fixing of gate valve (250 mm) 3 each One Thousand Two Hundred Twenty Six and Thirteen paise Only
Nimar for jointing the pipe (250mm) 20.54 Per kg 60 Sixty rupees
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 43.703 per tonnes One Hundred Sixty rupees and Thirty paise
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP, Risers, Gate Valve, Construction of Haudies at Village - (Kauharian, 5006/L, Extension), Tehsil Dirba and District Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1351.35 /Cum 93.78 Ninety Three rupees and Seventy Eight paise
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. /Mtrs 76 Seventy Six rupees
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 396 /Joints 161.35 One Hundred Sixty One rupees and Thirty Five paise
Fixing of Pump Stand including labour, foundation of PS and Installation of PS (900mm) 2 /Meter 6698.57 Six Thousand Six Hundred Ninty Eight rupees and Fifty Seven paise
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (350 mm) 9 /Cut hole 95 Ninty Five rupees
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 4 /Cut hole 41 Forty One rupees
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (350mm) 9 /Riser & Valve Five Hundred Seventy Six rupees and Fifty Seven paise
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 4 /Air pipe Two Hundred Ninty rupees and Seventy Nine paise
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Four Thousand rupees
Sign Board (5' X 3') 0 each 4000 Four Thousand rupees
Fixing of gate valve (350 mm) 3 each 1742.57 One Thousand Seven Hundred Forty Two Rupees and Fifty Seven paise Only
Nimar for jointing the pipe (350mm) 0.000 Per kg 60 Sixty rupees
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 86.62 per tonnes 172.94 One Hundred Seventy Two rupees and Ninty Four paise
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 450 mm Dia RCC Pipes, fixing of AVP, Risers, Gate Valve, Construction of Haudies at Village - (Dhandoli Kalan, 12018/L, Extension), Tehsil Dirba and District Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2076.9 /Cum 93.78 Ninety Three rupees and Seventy Eight paise
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. /Mtrs 76 Seventy Six rupees
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 516 /Joints 235.55 Two Hundred Thirty Five rupees and Fifty Five paise
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (450mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 10 /Meter 3274.28 Three Thousand Two Hundred Seventy Four rupees and Twenty Eight paise
Fixing of Pump Stand including labour, foundation of PS and Installation of PS (900mm) 2 /Meter 6662.88 Six Thousand Six Hundred Sixty Two rupees and Eighty Eight paise
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (450 mm) 8 /Cut hole 116 One Hundered Sixteen rupees
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 2 /Cut hole 41 Forty One rupees
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (450mm) 8 /Riser & Valve 769.15 Seven Hundred Sixty Nine rupees and Fifteen paise
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 2 /Air pipe 289.19 Two Hundred Eighty Nine rupees and Ninteen paise
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Four Thousand rupees
Sign Board (5' X 3') 0 each 4000 Four Thousand rupees
Fixing of gate valve (450 mm) 2 each 2176.54 Two Thousand One Hundred Seventy Six Rupees and Fifty Four paise Only
Nimar for jointing the pipe (450mm) 0.400 Per kg 60 Sixty rupees
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 154.96 per tonnes 172.94 One Hundred Seventy Two rupees and Ninty Four paise
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Grand Total (A+B+C+D)
Total Credit of damaged lined water channel existing on site to be deducted from the bill of Agency
stage.html
html • 0.04 MB
technical_328327.pdf
techsummary_328327.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
NITUGPL252633.pdf
Tender Documents • 0.50 MB
DNITUGPL252633.pdf
Tender Documents • 1.16 MB
FBUGPL252633.xls
Additional Documents • 0.16 MB
Download all tender documents and submit your bid