Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹75,180
Closing Date
11 Sept 2026, 5:30 pm
RAMBABU DINKAR
GWALIOR MUNICIPAL CORPORATION
RFP for regular Energy Bill Audit services and its compliance electrification work cum operation and maintenance service for Street Lights, PHE, Tube Wells, Public gardens, Office Buildings, Sulabh Complex electrical connection etc. under GMC Gwalio
2026_UAD_528563_1
MPGMC/89/26x6/4/Elec/2026-27
Open Tender
Miscellaneous Works
Percentage
1260 days
ELECTRICITY DEPARTMENT
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹75,180
10 Aug 2026
10 Aug 2026
15 Sept 2026
11 Aug 2026
11 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Energy Audit & Operation and Maintenance work :-
Manpower required for performing following actions :-
1) Disconnection of all illegal meter on day to day basis.
2) Circuit formation for all disconnected circuits. (Required Electrical material will be supplied by GMC Gwalior)
3) Monthly Smart Meter bill reading & analysis, providing report related to supply variation, miscalculation or additional charge.
4) Complaint for any excess loads and loses in transformer & meter connection.
5) Rearrangement of cable network for accurate load calculation.
6) Closure of all unused meter connection.
7) Change of tempered/non-working MPEB meters.
8) MPEB meter invoice load and supply variation settlement.
9) Energy auditing services for losses and load analysis.
10) Conducting Energy Audit for tempered, avg. billing meters
Note :- Minimum Manpower Strength per month :-1 Site Manager, 3 Electrician, 2 Lineman, 2 Helper including travel allowance and daily allowance (Per Meter) performing all above mentioned job work.
LT Conn. 2250 PHE + 1330 Elec. Dept. = 3580 Nos.
(Count may vary as per site and additional meter installation in future) HT Meters not included due to outsourced to third party vendor | - | Job Per Meter per month for 42 months(100X42) | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
RFP.pdf
Tender Documents • 0.67 MB
BOQ_636194.xls
BOQ • 0.23 MB
Estimate.pdf
Additional Documents • 0.16 MB
Annexures.pdf
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].