Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | ₹4.0 L | L1 | Accepted-AOC l1 |
| 2 | L2₹4.8 L+₹80,982 (20.4%)Rejected-Finance | ₹4.8 L+₹80,982 (20.4%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.0 L+₹1.0 L (25.5%)Rejected-Finance | ₹5.0 L+₹1.0 L (25.5%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Due to Sufficient Document not Submitted |
| 5 | Rejected-Technical | - | - | Rejected-Technical Due to Sufficient Document not Submitted |
| Sl No | Description | Qty | Unit | M/s CHANCHAL ASSOCIATES L3 | KAMLESH KUMAR CONTRACTOR L1 | RAJKUMAR SHARMA CONTRACTOR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds and moonj with disposal away from site as directed by Engineer-in-Charge. | 5,600 | Sqm | 22.75 ₹1,27,400 | 3.8 ₹21,280 Lowest | 19.25 ₹1,07,800 |
| 2.00 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge.. also including wet earth work under water excluding dewatering with cost of labour and T&P etc. complete | 8,520 | Cum | 43.55 ₹3,71,046 | 44.1 ₹3,75,732 | 43.45 ₹3,70,194 Lowest |
Tender Value
₹7.7 L
EMD Value
₹16,000
Closing Date
11 May 2026, 5:00 pmClosed
Executive Engineer
Lower Division Agra Canal, Agra
Clearance of Cheet Drain
2026_UPIDC_1145201_14
01/EE/2026-27
Open Tender
Civil Works
Item Wise
20 days
Clearance of Cheet Drain
Please Refer Tender Document
3 documents required · 3 mandatory
₹266
₹16,000
Yes
2 Jul 2026
5 May 2026
12 May 2026
5 May 2026
11 May 2026
5 May 2026
5 May 2026 - 11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting jhunds and moonj with disposal away from site as directed by Engineer-in-Charge. | 5,600 | Sqm | - | - |
| 2 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge.. also including wet earth work under water excluding dewatering with cost of labour and T&P etc. complete | 8,520 | Cum | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.90 MB
BOQ_2141059.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .