| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | ₹5.0 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹5.0 LRejected-AOC | ₹5.0 L | L2 | Rejected-AOC L2 Rejected |
| Sl No | Description | Qty | Unit | Kalamegam B L1 | EZHILMARAN V L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth | 9.33 | Cum | 263 ₹2,453.79 | 263 ₹2,453.79 |
| 2.00 | Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification | 2.84 | Cum | 2,100 ₹5,964 | 2,100 ₹5,964 |
| 3.00 | Refilling the basement with excavated earth rammed watered and compacted., complete complying to standard specification | 4.14 | Cum | 45 ₹186.30 | 45 ₹186.30 |
| 4.00 | Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification | 2.84 | Cum | 5,927 ₹16,832.68 | 5,945 ₹16,883.80 |
| 5.00 | Cement concrete 1:1.5:3 mix using 20mm gauge hard broken granite stone jelly for all RCC works including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standar | 8.44 | Cum | 9,965 ₹84,104.60 | 9,985 ₹84,273.40 |
| 6.00 | Supply and erecting steel centering for sides and soffits using MS sheet with steel angle laid over silver oak joist etc., complete - Column and Grade beam outer | 15.06 | Sqm | 547 ₹8,237.82 | 547 ₹8,237.82 |
| 7.00 | Supply and erecting steel centering for sides and soffits using MS sheet with steel angle laid over silver oak joist etc., complete - Sitting bench,Column, Beam, Sunshade, Roof side alround | 60.13 | Sqm | 1,095 ₹65,842.35 | 1,095 ₹65,842.35 |
| 8.00 | Supplying fabricating and placing in position mild steel / Ribbed for steel for all RCC works including cost and conveyance of all materials to site and all labour charges | 0.7 | MT | 91,910 ₹64,337 | 91,910 ₹64,337 |
| 9.00 | Brickwork in C.M 1:5 mix using country bricks including cost and conveyance of all mayerilas to site and all labour charges etc., complete | 10.84 | Cum | 6,381 ₹69,170.04 | 6,381 ₹69,170.04 |
| 10.00 | Plastering in CM 1:5 mix, 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete | 84.25 | Sqm | 290 ₹24,432.50 | 290 ₹24,432.50 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
10 Nov 2025, 3:00 pmClosed
The Block Development Officer(BP)
Panchayat Union, Sendurai
Construction of Bus shelter at Sirukadambur west side in Sirukadambur Panchayat in Sendurai Block of Ariyalur District Under PUGF 2025-26
2025_RDTN_621277_1
R.C.No.A2/1164/2025, Date.30.10.2025
Open Tender
Civil Works - Buildings
60 days
Sendurai
AS PER TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹5,000
7 Jan 2026
8 Nov 2025
10 Nov 2025
8 Nov 2025
10 Nov 2025
8 Nov 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
TechnicalBid10.pdf
Tender Documents • 0.32 MB
PriceBid10.pdf
Tender Documents • 0.22 MB
BOQ_742871.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid