| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹29.3 L+₹2.5 L (9.16%)Rejected-AOC 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | C.S.R ENTERPRISES | CKEE ENGINEERING PRIVATE LIMITED |
|---|---|---|---|---|---|
| 1.00 | Charges for Loading & Transporting of new 300 NB M.S Seamless pipe from central stores to working spot safely by escort crane and Charges for lifting the fabricated spool pipes one by one from ground floor to various height elevation and resting on the new cement pedestal ports by positioning the pipes with proper supports, connecting the fabricated spool pipes one by one with arc welding and commissioning the system, checking and attending any leakage on the lines, including charges for all consumables and hire charges for T&P’s and devolution of retrieved scrap pipes to central store by escort crane. | 100 | Mtr | 1,42,000 ₹1,67,560 Lowest | 1,55,100 ₹1,83,018 |
| 2.00 | Hire charges for Escort crane for leading and lifting the 300 NB M.S Seamless pipe., | 15 | Opn | 82,500 ₹97,350 Lowest | 90,000 ₹1,06,200 |
| 3.00 | Earth work excavation in all soils such as sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil and depositing on bank with an initial lead of 10m and initial lift of 2m and disposing the excavated earth 1Km. away from the site including cost of all materials, labours, lead, lift, etc. complete., | 10.8 | m3 | 1,674 ₹1,975.32 Lowest | 1,846.8 ₹2,179.22 |
| 4.00 | Providing PCC 1:4:8 using 20mm size HBG metal including cost of all materials labour, lead, lift etc., complete. | 10.8 | m3 | 73,548 ₹86,786.64 Lowest | 80,222.4 ₹94,662.43 |
| 5.00 | Providing RCC 1:1.5:3 using OP/PP cement with 12 to 20mm metal including cost of all materials, labours, lead, lift, tools, curing etc. complete. | 20.54 | m3 | 2,13,616 ₹2,52,066.88 Lowest | 2,33,170.08 ₹2,75,140.69 |
| 6.00 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift, tools etc., complete., | 1,643.04 | Kg | 1,64,304 ₹1,93,878.72 Lowest | 1,80,734.4 ₹2,13,266.59 |
| 7.00 | Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete | 121.44 | Sq. mtr | 68,613.6 ₹80,964.05 Lowest | 74,807.04 ₹88,272.31 |
| 8.00 | Material on Contractor's Scope : Supply of 300 NB seamless pipes with the following specifications: OD : 323.8 mm, Thickness : 12.7 mm, Standard Length - 4 to 6 mtr for Reach–V (From Switch yard I back side Gate No : 16 to Switch yard I back side Gate No : 15). | 100 | Mtr | 19,34,000 ₹22,82,120 Lowest | 21,09,800 ₹24,89,564 |
Tender Value
Refer Docs
EMD Value
₹21,500
Closing Date
19 Aug 2025, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 300 NB M.S Seamless pipe and providing cement pedestal from Clarified water pump house II, GLR III Service water pump discharge header to OHT II for a length of 100 mtrs, Reac
2025_EB_589258_1
CE/SE/O/TTPS/Spec.No.172/25-26
Open Tender
Miscellaneous Works
Item Rate
30 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹21,500
Yes
20 Sept 2025
5 Aug 2025
20 Aug 2025
5 Aug 2025
19 Aug 2025
5 Aug 2025
Charges for Loading & Transporting of new 300 NB M.S Seamless pipe from central stores to working spot safely by escort crane and Charges for lifting the fabricated spool pipes one by one from ground floor to various height elevation and resting on the new cement pedestal ports by positioning the pipes with proper supports, connecting the fabricated spool pipes one by one with arc welding and commissioning the system, checking and attending any leakage on the lines, including charges for all consumables and hire charges for T&P’s and devolution of retrieved scrap pipes to central store by escort crane.
Hire charges for Escort crane for leading and lifting the 300 NB M.S Seamless pipe.,
Earth work excavation in all soils such as sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil and depositing on bank with an initial lead of 10m and initial lift of 2m and disposing the excavated earth 1Km. away from the site including cost of all materials, labours, lead, lift, etc. complete.,
Providing PCC 1:4:8 using 20mm size HBG metal including cost of all materials labour, lead, lift etc., complete.
Providing RCC 1:1.5:3 using OP/PP cement with 12 to 20mm metal including cost of all materials, labours, lead, lift, tools, curing etc. complete.
Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift, tools etc., complete.,
Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete
Material on Contractor's Scope : Supply of 300 NB seamless pipes with the following specifications: OD : 323.8 mm, Thickness : 12.7 mm, Standard Length - 4 to 6 mtr for Reach–V (From Switch yard I back side Gate No : 16 to Switch yard I back side Gate No : 15).
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .