| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC GANABARAN GHAZIPUR SULTANPUR KAINALTORASK DINK RD | GHAZIPUR | UTTAR PRADESH | 232325 | ₹4.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.7 LRejected-AOC | ₹4.7 L | L2 | Rejected-AOC L2 |
| 3 | L3₹4.9 LRejected-AOC | ₹4.9 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | M/S RAM ASAREY PATEL L2 | M/S AWADH CONSTRUCTION L3 | M/S SHIVAM CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work
Earth work in excavation in treanches for
foundations and pipes, cable etc. in ordinary
soil (Loan clay or sand) including lift upto
1.5m lead upto 50m and dressing of sides
and ramming of bottom and disposal of
surplus excavated earth as directed by the
Engineer-in-charge within a lead of 50m. | 24.4 | cum | 80 ₹1,952 Lowest | 160 ₹3,904 | 100 ₹2,440 |
| 2.00 | Earth filling in plinth under floors including watering, ramming, cosolidating and dressing complete including lead upto 50m and lift upto 1.5m. | 4.8 | cum | 80 ₹384 Lowest | 160 ₹768 | 100 ₹480 |
| 3.00 | Concrete work
Cement concrete with 40mm gauge approved
stone ballast,coarse sand & cement in proportion
of 4:2:1 including supply of all materials, labour,
Tools & plant etc. required forproper completion of the work. | 8.55 | cum | 4,000 ₹34,200 | 4,450 ₹38,047.5 | 3,500 ₹29,925 Lowest |
| 4.00 | Damp proof coars
2.5cm thick Damp proof coarse with
cement concrete consisting one part
of cement, 1.5part approved coarse sand
and 3 part approved 10mm graded stone
agreegate and including water proofing
materials as ordered by E/I. in the proportion
as specified by the manufacturer. | 5.53 | sqm | 400 ₹2,212 | 314 ₹1,736.42 | 300 ₹1,659 Lowest |
| 5.00 | Anti termite treatment pre conspruction
Providing and injecting chemical
emulsion for pre constructional antitermite
treetment and creating a chemical
barrier under and alround the column
pits, wall treanches, basement. Excavation
top surface of plinth filling junction of
wall and floor along the external perimeter
of binding expansion joints, surrounding
of pipes and conduit etc. complete
( Plinth area of the building at ground
floor only shall be measured as per
I.S. 6313(part II 1981).
Aldrine emulsifiable concentrate any
other approved materials such as
Heptrachlor or chlordance will be used.
The rate of application of chemical
emulsion shall be asfollows:
(1) Treetment for masonary &
foundation 5litres per sqm.
(2) Back fill in immediate contact with
foundation 7.5litres per sqm.
(3) Treetment for top surface of plinth
fillings 5litres per sqm.
(4) Treetment for walls and the floor
7.5litres per sqm.
(5) Treetment of soil along external perimeter
of building 7.5litres per sqm.
(6) Treetment of soil under apron along
external perimeter 7.5litres per sqm. | 32 | sqm | 150 ₹4,800 Lowest | 194 ₹6,208 | 150 ₹4,800 Lowest |
| 6.00 | Brick work
Class-150 brick work in 1:4 cement and
corse sand of modulous mortar
in foundation and plinth including supply
of all materials labour and T&P etc. required
for proper completion of the work
( Upto Plinth Level) | 11.86 | cum | 4,600 ₹54,556 Lowest | 4,806 ₹56,999.16 | 5,400 ₹64,044 |
| 7.00 | B/W in super structure 1:4 cement & corse
Sand above plinth level upto floor two
level( upto two storeys) including
necessary cutting moulding of brick
work in thickness of wall more than 12cm. | 14.29 | cum | 5,200 ₹74,308 | 5,076 ₹72,536.04 | 5,000 ₹71,450 Lowest |
| 8.00 | R.C.C. work
R.C.C. work with cement approved
coarse sand and 2cm(3/4") gauge
approved stone ballast in the proportion
1:1.5:3 in lintels of doors and windows excluding supply
of reinforcement and its bending but
including its fixing and binding the same
with 24 BWG binding wire and including
necessary centering and shuttering
etc. and also including supply of all
materials labour and T&P etc. required
for proper completion of the works.
Strength of the concrete shall
not be less than M-20.
(A) Lintel & Plinth Beam | 1.6 | cum | 9,000 ₹14,400 | 8,722 ₹13,955.2 | 6,000 ₹9,600 Lowest |
| 9.00 | (B) Sunshade & Slab | 5.49 | cum | 7,000 ₹38,430 | 9,790 ₹53,747.1 | 5,000 ₹27,450 Lowest |
| 10.00 | (C) Beam | 0.65 | cum | 8,000 ₹5,200 Lowest | 8,722 ₹5,669.3 | 9,800 ₹6,370 |
Tender Value
₹5.5 L
EMD Value
₹10,924
Closing Date
25 May 2026, 6:00 pmClosed
EE MLCD Prayagraj
Office EE MLCD Prayagraj
Construction of Control Room Buiding at Sulmai Pump Canal prayagraj
2026_UPIDM_1148717_3
02/EE/MLCD/PRG/2026-27
Open Tender
Civil Works - Buildings
Piece-work
60 days
Sulmai pump canal prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹10,924
16 Jun 2026
18 May 2026
26 May 2026
19 May 2026
25 May 2026
19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work
Earth work in excavation in treanches for
foundations and pipes, cable etc. in ordinary
soil (Loan clay or sand) including lift upto
1.5m lead upto 50m and dressing of sides
and ramming of bottom and disposal of
surplus excavated earth as directed by the
Engineer-in-charge within a lead of 50m. | 24.4 | cum | 2,08,000 | ₹50,75,200 |
| 2 | Earth filling in plinth under floors including watering, ramming, cosolidating and dressing complete including lead upto 50m and lift upto 1.5m. | 4.8 | cum | 2,08,000 | ₹9,98,400 |
| 3 | Concrete work
Cement concrete with 40mm gauge approved
stone ballast,coarse sand & cement in proportion
of 4:2:1 including supply of all materials, labour,
Tools & plant etc. required forproper completion of the work. | 8.55 | cum | 2,08,000 | ₹17,78,400 |
| 4 | Damp proof coars
2.5cm thick Damp proof coarse with
cement concrete consisting one part
of cement, 1.5part approved coarse sand
and 3 part approved 10mm graded stone
agreegate and including water proofing
materials as ordered by E/I. in the proportion
as specified by the manufacturer. | 5.53 | sqm | 2,08,000 | ₹11,50,240 |
| 5 | Anti termite treatment pre conspruction
Providing and injecting chemical
emulsion for pre constructional antitermite
treetment and creating a chemical
barrier under and alround the column
pits, wall treanches, basement. Excavation
top surface of plinth filling junction of
wall and floor along the external perimeter
of binding expansion joints, surrounding
of pipes and conduit etc. complete
( Plinth area of the building at ground
floor only shall be measured as per
I.S. 6313(part II 1981).
Aldrine emulsifiable concentrate any
other approved materials such as
Heptrachlor or chlordance will be used.
The rate of application of chemical
emulsion shall be asfollows:
(1) Treetment for masonary &
foundation 5litres per sqm.
(2) Back fill in immediate contact with
foundation 7.5litres per sqm.
(3) Treetment for top surface of plinth
fillings 5litres per sqm.
(4) Treetment for walls and the floor
7.5litres per sqm.
(5) Treetment of soil along external perimeter
of building 7.5litres per sqm.
(6) Treetment of soil under apron along
external perimeter 7.5litres per sqm. | 32 | sqm | 2,08,000 | ₹66,56,000 |
| 6 | Brick work
Class-150 brick work in 1:4 cement and
corse sand of modulous mortar
in foundation and plinth including supply
of all materials labour and T&P etc. required
for proper completion of the work
( Upto Plinth Level) | 11.86 | cum | 2,08,000 | ₹24,66,880 |
| 7 | B/W in super structure 1:4 cement & corse
Sand above plinth level upto floor two
level( upto two storeys) including
necessary cutting moulding of brick
work in thickness of wall more than 12cm. | 14.29 | cum | 2,08,000 | ₹29,72,320 |
| 8 | R.C.C. work
R.C.C. work with cement approved
coarse sand and 2cm(3/4") gauge
approved stone ballast in the proportion
1:1.5:3 in lintels of doors and windows excluding supply
of reinforcement and its bending but
including its fixing and binding the same
with 24 BWG binding wire and including
necessary centering and shuttering
etc. and also including supply of all
materials labour and T&P etc. required
for proper completion of the works.
Strength of the concrete shall
not be less than M-20.
(A) Lintel & Plinth Beam | 1.6 | cum | 2,08,000 | ₹3,32,800 |
| 9 | (B) Sunshade & Slab | 5.49 | cum | 2,08,000 | ₹11,41,920 |
| 10 | (C) Beam | 0.65 | cum | 2,08,000 | ₹1,35,200 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.12 MB
DOC.pdf
Tender Documents • 1.48 MB
BOQ_2150421.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].