Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 LAccepted-AOC FLAT NO 703 7TH FLOOR PARVATI ENCLAVE PLOT NO 180 SECTOR 2 TOLOJA PANCHANANDTAL TALOJA MAJKUR DISTT RAIGAD MAHARASHTRA 410208 | RAIGAD | MAHARASHTRA | 410208 | L1 | Accepted-AOC Lowest bidder and found reasonable | |
| 2 | L2₹31.8 L+₹6.7 L (26.6%)Rejected-Finance GARDEN AVENUE PLOT NO 242 243 244 RH 4 SECTOR 21 NERUL NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | L2 | Rejected-Finance Greater Than L1 | |
| 3 | L3₹36.6 L+₹11.5 L (45.9%)Rejected-Finance FLAT NO 401 TULSANI HEIGHTS 4TH FLOOR GREEN PARK SOCIETY AKURDI GURUDWARA TO WALHEKAR WADI ROAD CHINCHWAD PUNE 411033 | PUNE | MAHARASHTRA | 411033 | L3 | Rejected-Finance Greater Than L1 | |
| 4 | L4₹37.9 L+₹12.8 L (51.1%)Rejected-Finance 503 GIRIRAJ HEIGHT VAITY WADI L B S MARG NEAR HARINIWAS CIRCLE THANE 400 602 | THANE | MAHARASHTRA | 400602 | L4 | Rejected-Finance Greater Than L1 | |
| 5 | L5₹38.0 L+₹12.9 L (51.4%)Rejected-Finance 33 JAGGI GARDEN NARAINGARH ROAD AMBALA CITY 134003 | AMBALA | HARYANA | 134003 | L5 | Rejected-Finance Greater Than L1 |
| Sl No | Description | Qty | Unit | VIJAYA ENTERPRISES L6 | JADHAV CONSTRUCTION AND INFRASTRUCTURE L7 | DWARKESH STRUCT-CON L1 | United Engineers and Contractors L4 | M/s S.D Construction Co L2 | Durga Enterprises L5 | SHAILENDRA B TULSANI L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick work or stone boulder masonry,built in lime mortar or cement mortar including all quoins, arches, pillars etc, but excluding ashlar facings, dressed stone work and precast concrete articles complete all as specified and directed by Engineer-in-Charge. | 267.9 | Cum | 500 ₹1,33,950 | 1,500 ₹4,01,850 | 100 ₹26,790 Lowest | 500 ₹1,33,950 | 800 ₹2,14,320 | 1,020 ₹2,73,258 | 550 ₹1,47,345 |
| 2.00 | Demolition of concrete (un re-inforced) of any description and in any position not other wise specially provided for complete all as specified and directed by Engineer-in-Charge. | 29.37 | Cum | 600 ₹17,622 | 1,550 ₹45,523.5 | 100 ₹2,937 Lowest | 1,500 ₹44,055 | 900 ₹26,433 | 1,350 ₹39,649.5 | 450 ₹13,216.5 |
| 3.00 | M&L for plain cement concrete 1:4:8 mix,type D2 (using 40 mm graded stone aggregates) as in sub base complete all as specified and directed by Engineer-in-Charge. | 16.87 | Cum | 2,700 ₹45,549 Lowest | 5,900 ₹99,533 | 4,000 ₹67,480 | 6,000 ₹1,01,220 | 4,000 ₹67,480 | 5,700 ₹96,159 | 5,200 ₹87,724 |
| 4.00 | M&L for walling or random rubble un coursed well bonded beded and solidly hearted built in cement mortar 1:6 brought upto course complete all as specified and directed by Engineer-in-Charge. | 107.16 | cum | 5,000 ₹5,35,800 | 5,300 ₹5,67,948 | 3,800 ₹4,07,208 Lowest | 4,000 ₹4,28,640 | 4,500 ₹4,82,220 | 5,000 ₹5,35,800 | 5,400 ₹5,78,664 |
| 5.00 | All as per item no -04 but Except stones. | 160.74 | cum | 4,500 ₹7,23,330 | 4,800 ₹7,71,552 | 2,800 ₹4,50,072 | 5,000 ₹8,03,700 | 2,400 ₹3,85,776 Lowest | 4,500 ₹7,23,330 | 3,500 ₹5,62,590 |
| 6.00 | M&L for Extra over stone walling for hammer dressing to face stones and dressing of face beds and joints,as specified ,of random rubble walling un coursed brought upto maximum depression of 40mm thick on granite or trap stones complete all as specified and directed by Engineer-in-Charge. | 1,062.5 | sqm | 108 ₹1,14,750 | 135 ₹1,43,437.5 | 50 ₹53,125 Lowest | 150 ₹1,59,375 | 75 ₹79,687.5 | 110 ₹1,16,875 | 180 ₹1,91,250 |
| 7.00 | M&L for Raised pointing in cement mortar 1:4 to random or polygonal rubble un coursed or up to course complete all as specified and directed by Engineer-in-Chagre. | 106.25 | xsqm | 1,800 ₹1,91,250 | 850 ₹90,312.5 | 800 ₹85,000 | 850 ₹90,312.5 | 2,400 ₹2,55,000 | 780 ₹82,875 Lowest | 860 ₹91,375 |
| 8.00 | M&L for Plain Cement ConcreteType B1 1:2:4(using 20 mm graded granite stone aggregate) as in plinth courses, string courses, lacing courses, parapets and railings upto 60 cm in height, copings, kneelers, apex stones, bed plates,etc and the like including weathering, slightly rounded or chamfered angles and throating, complete all as specified and directed by Engineer-in-Charge. | 5.63 | Cum | 7,000 ₹39,410 | 12,500 ₹70,375 | 4,000 ₹22,520 Lowest | 12,000 ₹67,560 | 6,000 ₹33,780 | 11,500 ₹64,745 | 8,500 ₹47,855 |
| 9.00 | M&L Plain Cement Concrete Type C2 1:3:6(using 20 mm graded granite stone aggregate) in foundations, filling and mass concrete complete all as specified and directed by Engineer-in-Charge. | 11.03 | Cum | 4,000 ₹44,120 Lowest | 9,500 ₹1,04,785 | 4,000 ₹44,120 Lowest | 9,500 ₹1,04,785 | 5,000 ₹55,150 | 8,900 ₹98,167 | 6,500 ₹71,695 |
| 10.00 | Dismantling posts or struts (wood ,steel or RCC ) any section ,including taking out embaded portion concrete ,brick work ,masonary,etc and making good disturbed ground complete all as specified and directed by Engineer-in-Charge. | 127.5 | Rm | 90 ₹11,475 | 80 ₹10,200 | 50 ₹6,375 | 100 ₹12,750 | 30 ₹3,825 Lowest | 60 ₹7,650 | 50 ₹6,375 |
Tender Value
₹35.6 L
EMD Value
₹71,500
Closing Date
3 Mar 2025, 6:00 pmClosed
Gaurav Tiwari, IDSE
GE (I) (NAVY), INS SHIVAJI - POST, LONAVLA -410402
SPECIAL REPAIRS TO PERIMETER SECURITY WALL OF NSB AND PROVISION OF DEFICIENT GEYSERS IN SMA AT INS SHIVAJI LONAVLA
2024_MES_688441_2
GE/LONAVLA/8280/E8
Open Tender
Civil Works
Item Rate
225 days
GE (I) (NAVY) LONAVLA
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
GEINDEPNAVYLONAVLA
₹71,500
Yes
1 Nov 2025
10 Feb 2025
5 Mar 2025
10 Feb 2025
3 Mar 2025
25 Feb 2025
10 Feb 2025 - 24 Feb 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .