Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹31.7 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹34.3 L+₹2.7 L (8.38%)Rejected-Finance | L-2 | Rejected-Finance L-2 |
Tender Value
₹46.7 L
EMD Value
₹93,380
Closing Date
7 Dec 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE Drainage circle Aligarh
SE Drainage circle Aligarh
S/E For Reconstruction of old damaged V.R.B. at Km. 2.800 , 3.400 and km. 0.500 and Restoration of Banail Mr. from Km. 0.000 to Km. 4.630.
2022_UPIDC_752973_6
09/SE/2022-23
Open Tender
Civil Works
Item Wise
60 days
SE DRAINAGE CIRCLE ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹93,380
30 Dec 2022
25 Nov 2022
7 Dec 2022
25 Nov 2022
7 Dec 2022
25 Nov 2022
Amount
Earthwork in making and Removing bunds, ramps, Backfilling Diversion and Strengthening of banks
Dismantling Brick or stone masionary with proper disposal lead up to 60 mtr. Including all cost of material, labour and T and P etc.
Laying of hume pipe NP -3 type 900 mm dia in position (Labour oly) including labour and T and P etc. required for completion of the work.
Earthwork in excavation of foundation in wet ordinary soil including lift up to 1.50 mtr. And lead up to 30.00 mtr.
C.C 1:3:6 in foundation and floor including cost of material, labour and T and P
Ist. Class brickwork in 1:4 C.M including all cost of material labour and T and P
Centering and shuttering including cost of material, labour and T and Pincluding all material , Labour and T and P
Steel reonforcement including bending , Binding , Cutting , Placing of reinforcement including all material , Labour and T and P
R.C.C 1: 1.5 :3 in slab and abutment including all material , Labour and T and P
C. C 1:1.5:3 in wearing coat and floor including all material , Labour and T and P
Struck Deep cement pointing in 1:2 C.Mincluding all material , Labour and T and P
Providing and laying 75 mm P.V.C. Pipe for Slab and Abutment
S/F wheel guard
Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade and undacorated wall surface to give even shade over @ 1.25 Ltr/10sqm including one coat of primer appled @ 0.75Ltr/10sqm coat curing and cost of all material, labor, T and P etc. required for proper completion of work.
Supply and fixing of information board including writing , material ,Labour etc completion of work
Uprooting jhund and moonj with proper disposal
Earthwork in restoration internal section, Making berm, Doula, Banks with proper ramming, and dressing the Excavated earth to be used in side of banks, repair of service road, making doula including all lead and lifts or as directed by Engineer in- charge.
Ist class Dry Brick Soiling ( Brick on Edge ) including all cost of material labour and T and P
CA CONSTRUCTION WORKS AND ENGINEERING SERVICES
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .