Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC ALIGARH | UTTAR PRADESH | 202001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.8 L+₹4,763.20 (1.00%)Rejected-AOC KAILASHPURI COLONY RAMAI PATTI DISTRICT MIRZAPUR | MIRZAPUR | UTTAR PRADESH | 231001 | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical KAILASHPURI COLONY RAMAI PATTI MIRZAPUR | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
29 Nov 2023, 2:00 pmClosed
EE MLCD MIRZAPUR
Near Nalkup Colony, Danghar, Patharahiya, Mirzapur
Brick on Edge linning for main canal (T-Point) and fixing of Regulator Gate at Narayanghat P/c
2023_UPIDM_863719_2
06/EEMLCDMzp/2023-24
Open Tender
Civil Works
Item Wise
60 days
MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹12,000
27 Jan 2024
21 Nov 2023
30 Nov 2023
21 Nov 2023
29 Nov 2023
21 Nov 2023
Amount
Earth Work in excavation with all type of soil including all labour cost T&P etc. required for proper completion of the work.
Preparation of sub grade for lining works including all labour cost T&P etc. required foe proper completion of the work.
Supply and laying of local sand in foundation including cost of all material, labour and T&P etc. required for proper completion of work.
P.C.C. 1:3:6 with Cement , Course sand and stone ballast size 25 to 50 mm labour and T&P etc. but excluding cost of cement required for proper completion of work.
C.C. 1:3:6 with Cement , Course sand and dalla grit Size 12.5 to 20 mm labour and T&P etc. but excluding cost of cement required for proper completion of work.
Brick on edge with M-150 brick (1:4) laid in cement mortar consisting of one part of cement & four part of coarse sand and pointed with cement mortar 1:2 over and 8 cm thick base concrete including cost labour and T&P etc. but excluding cost of cement & Brick required for proper completion of work.
C.R. Stone masonry in 1:3 CM with cement coarse sand & stone boulder labour and T&P etc. but excluding cost of cement required for proper completion of work.
Cement pointing on stone masonary in 1:2 CM (Struck deep) with cement & coarse sand labour and T&P etc. but excluding cost of cement required for proper completion of work.
RAM ASHARE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .