| Sl No | Description | Qty | Unit | MADURA ENGINEERING WORKS L2 | MUTHU ENGINEERING WORKS L1 |
|---|---|---|---|---|---|
| 1.00 | Decoupling the Boiler Fill pump & motor.This work involves removing coupling guard and all the bolts and freeing the flanges from rubber bushes so that the pump and motor can be rotated separately. Charges including consumables and T&Ps. | 2 | nos. | 3,000 ₹6,000 | 2,353 ₹4,706 Lowest |
| 2.00 | Removing & connecting the Boiler Fill pump inlet & out let flanges.This work involves removing all the bolts and freeing the inlet & out let flanges so that the pump can be moved from the bed. Coupling the Pump inlet & out let flanges after completion of the work by providing gasket between the flanges. Charges including consumables and T&Ps. | 2 | nos. | 5,500 ₹11,000 | 4,872 ₹9,744 Lowest |
| 3.00 | Dismantling and Assembling the Boiler Fill pump.This work involves removing the body bolts and removing bearing of both ends and dismantling all the five stages of the pump, inspection, cleaning of casing & impeller etc., rectifying minor defects and assembling the all the stages of the pump and bearing & seals. Including cost of consumables, T&Ps, bearings. | 2 | nos. | 80,000 ₹1,60,000 | 72,080 ₹1,44,160 Lowest |
| 4.00 | Rectification of Mechanical seal:This work involves removal of damaged carbon material from mechanical seal and made new casting in mechanical seal and machining the seal. Including consumables, T&Ps and casing material. | 4 | nos. | 23,000 ₹92,000 | 19,114 ₹76,456 Lowest |
| 5.00 | Rectification of Boiler Fill pump inlet flanges :This work involves cutting the inlet pipe from inlet flange, matching pump flange & providing spool piece and finally welding the inlet pipe with inlet flange. Charges including consumables and T&Ps. | 2 | nos. | 6,500 ₹13,000 | 5,586 ₹11,172 Lowest |
| 6.00 | Placing the Boiler Fill pump on bed & alignment.This work involves placing the pump on bed, alignment with the pump and coupling the motor & pump flanges with bolts. Charges including consumables and T&Ps. | 2 | nos. | 11,500 ₹23,000 | 9,691 ₹19,382 Lowest |
| 7.00 | Decoupling the Condensate Transfer Pump & motor.This work involves removing coupling guard and all the bolts and freeing the flanges from rubber bushes so that the pump and motor can be rotated separately. Charges including consumables and T&Ps. | 4 | nos. | 3,000 ₹12,000 | 2,238 ₹8,952 Lowest |
| 8.00 | Removing & connecting the Condensate Transfer Pump inlet & out let flanges. This work involves removing all the bolts and freeing the inlet & out let flanges so that the pump can be moved from the bed. Coupling the Pump inlet & out let flanges after completion of the work by providing gasket between the flanges. Charges including T&p's and consumables. | 4 | nos. | 11,500 ₹46,000 | 9,186 ₹36,744 Lowest |
| 9.00 | Dismantling and Assembling the Condensate Transfer Pump.This work involves removing the body bolts and removing bearing of both ends and dismantling of Horizontal split case pump, inspection, cleaning of casing & impeller etc., rectifying minor defects and assembling the pump and bearing & seals. Charges including consumables and T&Ps. | 4 | nos. | 15,000 ₹60,000 | 11,953 ₹47,812 Lowest |
| 10.00 | Placing the Condensate Transfer Pump on bed & alignment.This work involves placing the pump on bed , alignment with the pump and coupling the motor & pump flanges with bolts. Charges including T&p's and consumables. | 4 | nos. | 12,000 ₹48,000 | 9,691 ₹38,764 Lowest |
Tender Value
Refer Docs
EMD Value
₹5,600
Closing Date
22 Sept 2026, 2:00 pmClosed
SE M1
NCTPS II
NCTPS II - M-I Circle Boiler maintenance Division - Unit I II - Overhauling of Boiler fill pumps Horizontal multi stage pumpand Condensate transfer Pumps Horizontal single stage split casing pump and ECW single stage pumps and theirs valves in
2026_EB_702361_1
NCTPS_II_UII_Spec_30_26_27
Open Tender
Maintenance Works
Works
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,600
Yes
28 Sept 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Decoupling the Boiler Fill pump & motor.This work involves removing coupling guard and all the bolts and freeing the flanges from rubber bushes so that the pump and motor can be rotated separately. Charges including consumables and T&Ps. | 2 | nos. | - | - |
| 2 | Removing & connecting the Boiler Fill pump inlet & out let flanges.This work involves removing all the bolts and freeing the inlet & out let flanges so that the pump can be moved from the bed. Coupling the Pump inlet & out let flanges after completion of the work by providing gasket between the flanges. Charges including consumables and T&Ps. | 2 | nos. | - | - |
| 3 | Dismantling and Assembling the Boiler Fill pump.This work involves removing the body bolts and removing bearing of both ends and dismantling all the five stages of the pump, inspection, cleaning of casing & impeller etc., rectifying minor defects and assembling the all the stages of the pump and bearing & seals. Including cost of consumables, T&Ps, bearings. | 2 | nos. | - | - |
| 4 | Rectification of Mechanical seal:This work involves removal of damaged carbon material from mechanical seal and made new casting in mechanical seal and machining the seal. Including consumables, T&Ps and casing material. | 4 | nos. | - | - |
| 5 | Rectification of Boiler Fill pump inlet flanges :This work involves cutting the inlet pipe from inlet flange, matching pump flange & providing spool piece and finally welding the inlet pipe with inlet flange. Charges including consumables and T&Ps. | 2 | nos. | - | - |
| 6 | Placing the Boiler Fill pump on bed & alignment.This work involves placing the pump on bed, alignment with the pump and coupling the motor & pump flanges with bolts. Charges including consumables and T&Ps. | 2 | nos. | - | - |
| 7 | Decoupling the Condensate Transfer Pump & motor.This work involves removing coupling guard and all the bolts and freeing the flanges from rubber bushes so that the pump and motor can be rotated separately. Charges including consumables and T&Ps. | 4 | nos. | - | - |
| 8 | Removing & connecting the Condensate Transfer Pump inlet & out let flanges. This work involves removing all the bolts and freeing the inlet & out let flanges so that the pump can be moved from the bed. Coupling the Pump inlet & out let flanges after completion of the work by providing gasket between the flanges. Charges including T&p's and consumables. | 4 | nos. | - | - |
| 9 | Dismantling and Assembling the Condensate Transfer Pump.This work involves removing the body bolts and removing bearing of both ends and dismantling of Horizontal split case pump, inspection, cleaning of casing & impeller etc., rectifying minor defects and assembling the pump and bearing & seals. Charges including consumables and T&Ps. | 4 | nos. | - | - |
| 10 | Placing the Condensate Transfer Pump on bed & alignment.This work involves placing the pump on bed , alignment with the pump and coupling the motor & pump flanges with bolts. Charges including T&p's and consumables. | 4 | nos. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_844329.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .