| 1 | 1₹1.8 LAccepted-AOC WARD NO 03 JAMUNA COLLIERY DISTT ANUPPUR MP 484444 | ANUPPUR | MADHYA PRADESH | 484444 | 1 | Accepted-AOC Accepted as L1 bidder and awarded value is including GST. | |
| 2 | Rejected-Technical WARD NO 09 KOTMA COLLIERY DISTT ANUPPUR MP 484336 | ANUPPUR | MADHYA PRADESH | 484336 | - | Rejected-Technical REJECTED AS L3 BIDDER. | |
| 3 | Rejected-Technical CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | - | Rejected-Technical REJECTED AS L2 BIDDER. |
Tender Value
₹2.8 L
EMD Value
₹3,500
Closing Date
8 Mar 2024, 1:30 pmClosed
General Manager(Oprn.), JK Area
Office of The General Manager(Oprn.), JK Area, P.O-Jamuna Colliery, Dist. Anuppur (MP), Pin-484444, SECL, Bilaspur BILASPUR
Making of 02 Nos pumps foundation, laying of 6 inch pipe line and installation of 500/1000 GPM HT Pumps in -2D/69LW of LK II seam at Bartarai Colliery of Amadand UG Sub Area, Jamuna Kotma Area.
2024_SECL_302577_1
SECL/JK/GM(O)/23-24/eT/44 Dt.24.02.24
Open Tender
Civil Works - Others
Item Rate
60 days
Bartarai Colliery, Amadand UG Sub Area, JK Area
AS PER NIT
4 documents required · 4 mandatory
₹3,500
21 May 2024
24 Feb 2024
9 Mar 2024
24 Feb 2024
8 Mar 2024
26 Feb 2024
26 Feb 2024 - 1 Mar 2024
Amount
Groove cutting for stoppiong & Manhole by chisel/pickaxe and hammer in.
Hard stone
PCC work in UG including centering, shuttering for PCC work including, cutting binding in position etc. (1:2:4)
Brick work for foundation (height from floor to 1.50m height)
12mm thick cement plaster (Both side)
Loading of all kind material into tubs at inc. Mouth
Unloading of all kind material at distination point in UG
Pushing of tubs for every 110 ft. After free pushing of first 100ft (360-100=200/110=2pushing)5.99x1.15=5.21x2=Rs.10.42
Cleaning of muck, malma silt
Cost of materials
Cement
Metal (20 MM)
Brick (Flyash)
Transportation & instalation of 6" pipe line (180x2)=360m
Transportation & installation of HT (500/1000 GPM) pump 2km (2nos)2*2000=4000
Transportation of starter, switch,cable,section pipe etc. and installation for HT pump (2 nos)
Total impact of GST for the purpose of CTC
Ram Awadh Singh
ANJANI KUMAR GAUTAM
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .