| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAdmitted-Finance | ₹15.1 L | L1 | Admitted-Finance |
| 2 | L2₹15.1 LAdmitted-Finance GHAZIABAD 201206 U P INDIA MURADNAGAR GHAZIABAD UTTAR PRADESH 201206 UDYAM UP 29 0018296 09ATCPK8932G1ZH R M | GHAZIABAD | UTTAR PRADESH | 201206 | ₹15.1 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K.L Enterprises L1 | AGNI AUTOMATION AND SECURITY L2 |
|---|---|---|---|---|---|
| 1.01 | Work of Opening/Disconnection of the main incoming LT power supply from the LT panel , racking out the breaker to ensure the power is disconnected from all sources connected to FCMA Soft Starter Panels & arrangement of safety helmet etc to start the work in complete shut down condition. | 3 | Jobs | 28,380 ₹33,488.4 | 28,395 ₹33,506.1 |
| 1.02 | Rectification of wiring by replacement of faulty wires as per drawing of the panel & ensuring that the control circuit of the Starter Panel is working properly and Panel lights are giving signal as per drawing of the panel work includes tightness of all connections. | 3 | Jobs | 37,350 ₹44,073 | 37,395 ₹44,126.1 |
| 1.03 | Rectification of wiring of the Power circuit , connection of taps , incoming and outgoing of the Starter Panel & tightness of all connections by repir /replacement of faulty taps and wire. | 3 | Jobs | 1,45,350 ₹1,71,513 | 1,45,380 ₹1,71,548.4 |
| 1.04 | Supply and installation of main By Pass contactor of MNX 185 (250 Amp AC1) 240 V AC with 2 NO + 2 NC work includes the dismantling of old contactor along with opening of incoming & outgoing connection of cable/busbar and opening the connection of Aux Block and tripping etc. | 3 | Jobs | 1,15,440 ₹1,36,219.2 | 1,15,485 ₹1,36,272.3 |
| 1.05 | Supply of FCMA Module suitable for motor of 225 KW, 3 Phase , 415 Volt 50 Hz Make Innovative | 1 | Job | 4,95,000 ₹5,84,100 | 4,94,980 ₹5,84,076.4 |
| 1.06 | Work of fixing the Power contactor in the panel work includes dismantling of old contactor along with opening of incoming & outgoing connection of cable/busbar and opening the connection of Aux Block and tripping etc. Work of installation of main contactor in panel , work includes cleaning of the terminal and Lugs and incoming & outgoing connections fixed with high tensile nut and bolts along with the reinsualtion of bus bar and modification of the bus bar by bending/cutting the bus bar and associated wiring of the auxiliary contacts. | 3 | Jobs | 1,06,260 ₹1,25,386.8 | 1,06,350 ₹1,25,493 |
| 1.07 | Manual functional testing of the Panel along by directly giving command from the terminal blocks with all required tools, manpower etc. | 3 | Jobs | 44,700 ₹52,746 | 44,850 ₹52,923 |
| 1.08 | Work of checking the current at Starting time and adjustment as per site requirement & as required by FCMA starter along with all required tools. | 3 | Jobs | 28,380 ₹33,488.4 | 28,410 ₹33,523.8 |
| 1.09 | Work of replacement of all the timers and Aux contactors connected in the control circuit & ensuring the working of each and every components In the panel. | 3 | Jobs | 1,18,200 ₹1,39,476 | 1,18,350 ₹1,39,653 |
| 1.10 | Assembling the panel after completion of the work & closing and mounting of all components. Cleaning of the Panel with Vacuum cleaner/blower ensuring that no control and power wiring is disturbed during the work. | 3 | Jobs | 44,670 ₹52,710.6 | 44,700 ₹52,746 |
Tender Value
Refer Docs
EMD Value
₹30,300
Closing Date
2 Mar 2026, 11:00 amClosed
Office of the Ex. Eng. (E and M) M-2
Pocket-A, Dilshad Garden, Delhi-110095
Repairing / servicing of Innovative make Soft Starter at Usmanpur BPS.
2026_DJB_287606_2
NIT No. 29 (25-26)
Open Tender
Miscellaneous Works
60 days
Usmanpur BPS.
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Ac No. 50448339804
₹30,300
7 Mar 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
Work of Opening/Disconnection of the main incoming LT power supply from the LT panel , racking out the breaker to ensure the power is disconnected from all sources connected to FCMA Soft Starter Panels & arrangement of safety helmet etc to start the work in complete shut down condition.
Rectification of wiring by replacement of faulty wires as per drawing of the panel & ensuring that the control circuit of the Starter Panel is working properly and Panel lights are giving signal as per drawing of the panel work includes tightness of all connections.
Rectification of wiring of the Power circuit , connection of taps , incoming and outgoing of the Starter Panel & tightness of all connections by repir /replacement of faulty taps and wire.
Supply and installation of main By Pass contactor of MNX 185 (250 Amp AC1) 240 V AC with 2 NO + 2 NC work includes the dismantling of old contactor along with opening of incoming & outgoing connection of cable/busbar and opening the connection of Aux Block and tripping etc.
Supply of FCMA Module suitable for motor of 225 KW, 3 Phase , 415 Volt 50 Hz Make Innovative
Work of fixing the Power contactor in the panel work includes dismantling of old contactor along with opening of incoming & outgoing connection of cable/busbar and opening the connection of Aux Block and tripping etc. Work of installation of main contactor in panel , work includes cleaning of the terminal and Lugs and incoming & outgoing connections fixed with high tensile nut and bolts along with the reinsualtion of bus bar and modification of the bus bar by bending/cutting the bus bar and associated wiring of the auxiliary contacts.
Manual functional testing of the Panel along by directly giving command from the terminal blocks with all required tools, manpower etc.
Work of checking the current at Starting time and adjustment as per site requirement & as required by FCMA starter along with all required tools.
Work of replacement of all the timers and Aux contactors connected in the control circuit & ensuring the working of each and every components In the panel.
Assembling the panel after completion of the work & closing and mounting of all components. Cleaning of the Panel with Vacuum cleaner/blower ensuring that no control and power wiring is disturbed during the work.
Tunning of FCMA unit for its proper performance & functioning as per OEM guidelines and motor characteristics and full load current.
Complete testing of the panel after completion of the work
Old scrap rebate
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_381185.xls
BOQ • 0.25 MB
NIT.pdf
Tender Documents • 0.56 MB
Download all tender documents and submit your bid