| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.0 LAccepted-Finance PATRA MARKET KRISHANAGAR NADIA | KRISHANAGAR | NADIA | ₹71.0 L | L1 | Accepted-Finance lowest rate |
| 2 | L2₹71.7 LRejected-Finance 7G CORNFIELD ROAD KOLKATA 700019 | PASCHIM BARDHAMAN | WEST BENGAL | 713305 | ₹71.7 L | L2 | Rejected-Finance THE BID IS NOT L1 |
| 3 | L3₹72.0 LRejected-Finance 76 CRIPER ROAD KONNAGAR HOOGHLY | KONNAGAR | HOOGHLY | WEST BENGAL | ₹72.0 L | L3 | Rejected-Finance THE BID IS NOT L1 |
| Sl No | Description | Qty | Unit | MAHADEV ENTERPRISE L3 | CONCORD ENGINEERING L2 | Tarun Kumar Bhattacharya L1 |
|---|---|---|---|---|---|---|
| 1.00 | Day to day Operation & guarding of installed horizontal split casing centrifugal pumping machinery, internal & external electrification arrangement including compound lighting, Gaseous chlorination system, Sludge pump etc. & 1250 KVA Sub-Stations equipments including of Battery Charger, Battery bank, HT VCB, HT Panel, ACBs, P.F. correction device, lighting transformer, Dewatering pump, back wash pump, Sludge pump, lighting equipment, LT MCC / panel, LT control / Distribution panel along with other equipments like Soft Starter, Electrical gadgets, valves, 63KVA DG set, compound lighting etc. Operation & guarding of the entire Gaseous chlorination Plant by skilled and un-skilled labours (charges for chlorine gas filling in the toner and charge for caustic will be borne by the Department) round the clock including up-keepment of entire installation and sweeping charges at WTP premises under Surface Water Based W/S Scheme, Northern Sector, Part-I (Kaliganj) as per direction of EIC for 365 days.
Major Electro Mechanical machineries at the installation:-
a) Centrifugal pumps - 3 nos. (260KW X 3), (2W + 1S)
b) Gaseous Chlorination System
c) Electrical Sub-Station (1250 KVA), (11KV/0.415KV)
d) 63 KVA DG set
e) HT VCB Panel (800A) with relays
f) Remote tap changer panel for transformer - 2nos.
g) 50 KVA TXR for lighting
h) LT PCC panel including all ACBs
i) Battery & Battery charger unit
j) Back wash - 2nos. (9.3KW X 2) & dewatering pump set etc.
k) Sludge pump - 2nos. (4HP X 2) (1W + 1S).
l) Internal & external lighting arrangement including compound lighting | 365 | Days | 16,320 ₹59,56,800 | 16,250 ₹59,31,250 | 16,100 ₹58,76,500 |
| 2.00 | Routine & Periodical inspection by Electrical Supervisor having valid Supervisor Certificate of competency from Directorate of Electricity (Licensing Board), Govt of West Bengal or under any other State, Govt of India along with Pump Technician / Supervisor. Each visit should be recorded in the Log Book ( with date & time) to be supplied by the Agency and kept in respective Station. The Supervisor required to have thorough / in depth inspection of all the Electrical appliances to ascertain the healthy / fault free operational condition of each equipments i.e. for Pumps, Motors, sub-station, Valves with Actuators, Flow Level / pressure instruments, Gauges, Lighting system, DG set, hoisting arrangements, Exhaust Fans, HT VCB Panel & L T Panel Boards, Cables, Capacitors, Transformers, Battery and Battery Chargers, Chlorination system including safety management system in compliance to the guide line as mentioned in the NIT. The periodic chart in tabular format as per direction of the EIC and in comply to the specification enclosed herewith for the check points scheduled should be furnished to the Department All other necessary requirement to be executed along with Log Book, Mobil, Cotton waste, Broom, Torch,. Detergents, Liquid soaps, Gloves, Apron, Tools, Tackles, Terminals, Sockets, Fuses, Indicating Lamps, Gland packing etc. to be supplied by the Agency as and when required through out the whole period 365 days. | 1 | item | 1,54,280 ₹1,54,280 | 1,53,500 ₹1,53,500 | 1,52,000 ₹1,52,000 |
| 3.00 | Cleaning of contacts once in a month by CRC 226 SPRAY in the LT Panel Board, HT Panel, Busbar, cleaning of all Terminal Sockets, Coils once in a month in presence of Electrical Supervisor / Electrician and to be recorded in the Log Book with date including supply of new gland packing, fuses, cotton waste, indicating lamps etc. for the 12 months. | 12 | month | 9,740 ₹1,16,880 | 9,690 ₹1,16,280 | 9,600 ₹1,15,200 |
| 4.00 | Servicing, testing and calibration complete with submission of report (specify of set point) in compliance with the guide line as per specification for the ACBS, VCB, Transformer oil level, replacement of silica gel etc. checking complete, wiring, testing CTs, PTs, Relay testing and calibration, insulation check once in half yearly. | 1 | item | 1,24,500 ₹1,24,500 | 1,24,200 ₹1,24,200 | 1,23,000 ₹1,23,000 |
| 5.00 | Consumption of diesel for 63KVA capacity DG set @ 11 ltr./hr. including all carriage & storage for 365 days X 2hr. run/day i.e. 730 hours
[Measurement must be as per actual running Hr/log book.] | 730 | hrs | 1,125 ₹8,21,250 | 1,120 ₹8,17,600 | 1,110 ₹8,10,300 |
| 6.00 | Consumption of Mobil oil including all carriage & storage for the 63KVA DG set for 365 days x 2hrs. run/day i.e. 730 Hrs.
[Measurement must be as per actual running Hr/log book.] | 730 | hrs | 34.5 ₹25,185 | 34.2 ₹24,966 | 34 ₹24,820 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
25 May 2026, 6:00 pmClosed
Executive Engineer Eastern Mechanical Division P.
Executive Engineer EMD, PHED, P-16, CIT ANNEX BLDG KOL 73
Round the Clock Operation and Guarding of Pumping Machinery, 2 x1250KVA Sub-Station (11KV/0.433KV), Sludge Pump, Gaseous Chlorination system, Internal External lighting arrangement etc. and other allied works at Water Treatment Plant (High Lift) u
2026_PHED_1023891_6
WBPHED/EE/EMD/NIET-01/2026-27
Open Tender
Miscellaneous Works
365 days
Executive Engineer EMD, PHED, P-16, CIT ANNEX BLDG
Please refer Tender documents.
8 documents required · 8 mandatory
₹1.5 L
29 May 2026
12 May 2026
28 May 2026
12 May 2026
25 May 2026
12 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Day to day Operation & guarding of installed horizontal split casing centrifugal pumping machinery, internal & external electrification arrangement including compound lighting, Gaseous chlorination system, Sludge pump etc. & 1250 KVA Sub-Stations equipments including of Battery Charger, Battery bank, HT VCB, HT Panel, ACBs, P.F. correction device, lighting transformer, Dewatering pump, back wash pump, Sludge pump, lighting equipment, LT MCC / panel, LT control / Distribution panel along with other equipments like Soft Starter, Electrical gadgets, valves, 63KVA DG set, compound lighting etc. Operation & guarding of the entire Gaseous chlorination Plant by skilled and un-skilled labours (charges for chlorine gas filling in the toner and charge for caustic will be borne by the Department) round the clock including up-keepment of entire installation and sweeping charges at WTP premises under Surface Water Based W/S Scheme, Northern Sector, Part-I (Kaliganj) as per direction of EIC for 365 days.
Major Electro Mechanical machineries at the installation:-
a) Centrifugal pumps - 3 nos. (260KW X 3), (2W + 1S)
b) Gaseous Chlorination System
c) Electrical Sub-Station (1250 KVA), (11KV/0.415KV)
d) 63 KVA DG set
e) HT VCB Panel (800A) with relays
f) Remote tap changer panel for transformer - 2nos.
g) 50 KVA TXR for lighting
h) LT PCC panel including all ACBs
i) Battery & Battery charger unit
j) Back wash - 2nos. (9.3KW X 2) & dewatering pump set etc.
k) Sludge pump - 2nos. (4HP X 2) (1W + 1S).
l) Internal & external lighting arrangement including compound lighting | 365 | Days | - | - |
| 2 | Routine & Periodical inspection by Electrical Supervisor having valid Supervisor Certificate of competency from Directorate of Electricity (Licensing Board), Govt of West Bengal or under any other State, Govt of India along with Pump Technician / Supervisor. Each visit should be recorded in the Log Book ( with date & time) to be supplied by the Agency and kept in respective Station. The Supervisor required to have thorough / in depth inspection of all the Electrical appliances to ascertain the healthy / fault free operational condition of each equipments i.e. for Pumps, Motors, sub-station, Valves with Actuators, Flow Level / pressure instruments, Gauges, Lighting system, DG set, hoisting arrangements, Exhaust Fans, HT VCB Panel & L T Panel Boards, Cables, Capacitors, Transformers, Battery and Battery Chargers, Chlorination system including safety management system in compliance to the guide line as mentioned in the NIT. The periodic chart in tabular format as per direction of the EIC and in comply to the specification enclosed herewith for the check points scheduled should be furnished to the Department All other necessary requirement to be executed along with Log Book, Mobil, Cotton waste, Broom, Torch,. Detergents, Liquid soaps, Gloves, Apron, Tools, Tackles, Terminals, Sockets, Fuses, Indicating Lamps, Gland packing etc. to be supplied by the Agency as and when required through out the whole period 365 days. | 1 | item | - | - |
| 3 | Cleaning of contacts once in a month by CRC 226 SPRAY in the LT Panel Board, HT Panel, Busbar, cleaning of all Terminal Sockets, Coils once in a month in presence of Electrical Supervisor / Electrician and to be recorded in the Log Book with date including supply of new gland packing, fuses, cotton waste, indicating lamps etc. for the 12 months. | 12 | month | - | - |
| 4 | Servicing, testing and calibration complete with submission of report (specify of set point) in compliance with the guide line as per specification for the ACBS, VCB, Transformer oil level, replacement of silica gel etc. checking complete, wiring, testing CTs, PTs, Relay testing and calibration, insulation check once in half yearly. | 1 | item | - | - |
| 5 | Consumption of diesel for 63KVA capacity DG set @ 11 ltr./hr. including all carriage & storage for 365 days X 2hr. run/day i.e. 730 hours
[Measurement must be as per actual running Hr/log book.] | 730 | hrs | - | - |
| 6 | Consumption of Mobil oil including all carriage & storage for the 63KVA DG set for 365 days x 2hrs. run/day i.e. 730 Hrs.
[Measurement must be as per actual running Hr/log book.] | 730 | hrs | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
Tendernotice_2.pdf
PDF • 0.57 MB
BOQ_2516442.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid