Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | -32.99% | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.1 L+₹9,847.50 (1.97%)Admitted-Finance | -31.67% | ₹5.1 L+₹9,847.50 (1.97%) | L2 | Admitted-Finance |
| 3 | L3₹5.2 L+₹20,217.22 (4.04%)Admitted-Finance | -30.28% | ₹5.2 L+₹20,217.22 (4.04%) | L3 | Admitted-Finance |
| 4 | L4₹5.6 L+₹56,921.55 (11.4%)Admitted-Finance | -25.36% | ₹5.6 L+₹56,921.55 (11.4%) | L4 | Admitted-Finance |
| 5 | L5₹5.6 L+₹58,338.99 (11.7%)Admitted-Finance | -25.17% | ₹5.6 L+₹58,338.99 (11.7%) | L5 | Admitted-Finance |
Tender Value
₹7.5 L
EMD Value
₹14,920
Closing Date
29 Jul 2026, 4:00 pmClosed
Executive Engineer PWD R and B division Kathua
Executive Engineer PWD R and B division Kathua
Refer to BOQ
2026_PWDJK_316373_1
E-NIT No 56/2026-27/4061-65/G Dated 16.07.2026
Open Tender
Civil Works
Percentage
30 days
Kathua
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer PWD R and B division Kathua
₹14,920
Executive Engineer PWD R and B division Kathua
8 Aug 2026
17 Jul 2026
30 Jul 2026
17 Jul 2026
29 Jul 2026
17 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Structural steel work in built up sections, trusses and framed work,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded | 412 | Kg | 138.2 | ₹56,938.4 |
| 2 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire | 9,513 | metre | 19.85 | ₹1,88,833.05 |
| 3 | Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 meter openable length ( total length 90m), having 50 nos rounds per 6 meter length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape (R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ meter (cost of M.S. angle, C.C. blocks shall be paid separately) | 1,585 | metre | 305.9 | ₹4,84,851.5 |
| 4 | Engaging welder for equivalent skilled type | 20 | No. | 770 | ₹15,400 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
BOQ_1031222.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .