| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.8 LAdmitted-Finance | -19.90% | ₹11.8 L | L1 | Admitted-Finance |
| 2 | L2₹12.5 L+₹69,143.96 (5.88%)Admitted-Finance | -15.19% | ₹12.5 L+₹69,143.96 (5.88%) | L2 | Admitted-Finance |
| 3 | L3₹12.9 L+₹1.1 L (9.60%)Admitted-Finance | -12.21% | ₹12.9 L+₹1.1 L (9.60%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹14.7 L
EMD Value
₹29,360
Closing Date
10 Aug 2026, 6:00 pmClosed
Executive officer municipal board siwana
Executive officer municipal board siwana
civil work
2026_DLB_583850_1
668/09
Open Tender
Civil Works
Percentage
365 days
siwana
civil work
3 documents required · 3 mandatory
₹500
Executive officer municipal board siwana
₹29,360
Yes
16 Aug 2026
8 Aug 2026
11 Aug 2026
8 Aug 2026
10 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.
4.2.1 In all type of soil | 27 | Cum | 235.5 | ₹6,358.5 |
| 1.02 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 24.3 | Cum | 161.51 | ₹3,924.69 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 33.73 | Cum | 4,575 | ₹1,54,314.75 |
| 1.04 | Random rubble masonry with hard stone in foundation and plinth : 25.1.2 Cement mortar 1:4 (1 cement : 4 coarse sand) | 40.8 | sqm | 426 | ₹17,380.8 |
| 1.05 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 15 mm cement plaster on the rough side of single or half brick wall of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:6 (1 cement : 6 fine/ coarse sand) | 19.82 | Cum | 5,910 | ₹1,17,136.2 |
| 1.06 | Stone slab roofing on ground floor with fine grained stone slab 90mm average thickness from approved quarry including filling of joints slab in cement sand mortar 1:4 with ceiling pointing in cement sand mortar 1 : 3 complete as per specification for span: 31.61.4
Above 3.00 metre and up to 3.30 metre | 1,867 | kg | 83.3 | ₹1,55,521.1 |
| 1.07 | Structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 73.44 | Cum | 4,860 | ₹3,56,918.4 |
| 1.08 | Half brick masonry with FPS bricks of class designation 75 in superstructure above plinth level upto two stories. 24.12.1
Cement mortar 1:3 (1 cement :3 coarse sand) | 73.44 | Cum | 4,860 | ₹3,56,918.4 |
| 1.09 | 52 mm thick cement concrete flooring with concrete hardener topping under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume .hardening compound is mixed @ 2 litre per 50 kg of cement or as per manufacturers specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar | 2,000 | kg | 114.5 | ₹2,29,000 |
| 1.1 | 52 mm thick cement concrete flooring with concrete hardener topping under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume .hardening compound is mixed @ 2 litre per 50 kg of cement or as per manufacturers specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar | 77.19 | sqm | 914 | ₹70,551.66 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
td.pdf
Tender Documents • 2.36 MB
BOQ_1037077.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .