Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | -37.09% | ₹1.3 L | L1 | Admitted-Finance |
| 2 | L2₹1.3 LAdmitted-Finance | -35.20% | ₹1.3 L | L2 | Admitted-Finance |
| 3 | L2₹1.3 LAdmitted-Finance | -35.20% | ₹1.3 L | L2 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-EDITED GST 3B IS UPLOADED BY THE BIDDER
FEE SLIP UPLOADED IS NOT BETWEEN START DATE AND BID SUBMISSION END DATE |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
2 Mar 2026, 6:00 pmClosed
Er. Fayaz Ahmed Sheikh
EXECUTIVE ENGINEER OFFICE REW RAMBAN
AS PER NIT
2026_RDPR_304362_1
NIT NO 98 OF REW RAMBAN 2025 26 UNDER HEAD CDF
Open Tender
Civil Works
30 days
Ramban
AS PER NIT
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹4,000
3 Mar 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
2 Mar 2026
24 Feb 2026
Earth work in bulk excavation by manual means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.in 90 % All kinds of soil & 10 % HArd rock
Providing and Laying dry stone Solling with crushed dust all complete
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including providing weep holes/expansion joint as directed/ required
Dumping of Stones
Centering and shuttering including strutting, propping etc. and removal of form work for: foundations
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Carriage of Cement
Carriage of Sand
Carriage of Aggregate
Carriage of Stones
CIB (citizen information Board) including plaster, paint, lettering and logos (on Granite Stone) as per instruction of Engineer-in-charge including carriage of material. (complete job)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.45 MB
BOQ_988696.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid