Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.3 L+₹46,845.93 (16.6%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.7 L+₹91,376.28 (32.3%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹4.3 L+₹1.5 L (52.0%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.4 L+₹1.5 L (54.4%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.5 L
EMD Value
₹13,350
Closing Date
25 Sept 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Const of Flood Channel NLO NazirahmdGanie , Gh Hassan Wani And others phase 1
2026_RDPR_325135_31
NIT NO 121 OF 2026-27 ADF GENERAL
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹13,350
2 Oct 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
18 Sept 2026 - 18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, ( not exceeding 1.5m in width) | 50.8 | Cum | 479.3 | ₹24,348.44 |
| 2 | P/L of stone soling incl all carriages | 22.9 | Cum | 1,000 | ₹22,900 |
| 3 | P/L in position of cement concrete of specified grade1:4:8 excluding the cost of centring and shuttering by using 40mm nominal size agg | 7.6 | Cum | 5,202.9 | ₹39,542.04 |
| 4 | P/L in position of cement concrete of specified grade1:3:6 excluding the cost of centring and shuttering by using 20mm nominal size agg | 40.7 | Cum | 5,733.6 | ₹2,33,357.52 |
| 5 | P/L in position of shuttering/centring including propping strutting etc. and removal of formwork | 166.8 | Sm | 286.35 | ₹47,763.18 |
| 6 | 12mm thick plaster in cement mortar 1:6 mix over rough concrete surface | 133.5 | Sm | 266.2 | ₹35,537.7 |
| 7 | carriage of sand/bajri with average lead of 25km and H/L 100m | 40.7 | Cum | 1,003.8 | ₹40,854.66 |
| 8 | Add Provision for CIB<Photographs | 1 | No. | 1,000 | ₹1,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_1098056.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .