Loading
Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹72.4 L | ₹72.4 L |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
20 May 2026, 2:30 pmClosed
TROUGH FLOOR ASSEMBLY COMPLETE FOR 3 PHASE MEMU/DMC COACH
05261103
05261103
Open - Indigenous
Darbhanga, Bihar
₹0
₹2.5 L
8 Jul 2026
20 Apr 2026
Description :TROUGH FLOOR ASSEMBLY COMPLETE FOR 3 PHASE MEMU/DMC COACH [ Warranty Pe riod: 30 Months after the date of delivery ] ] Consignee SHELL DEPOT, RCF Punjab 44.00 Numbers Inspection Stage Inspection Not Required Details
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid