| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAdmitted-Finance AT 246 NIRSA P O NIRSA DIST DHANBAD 828205 | DHANBAD | JHARKHAND | 828205 | L1 | Admitted-Finance | |
| 2 | L2₹11.0 L+₹96,639.56 (9.62%)Admitted-Finance WARD NO 09 KOTMA COLLIERY DISTT ANUPPUR MP 484336 | ANUPPUR | MADHYA PRADESH | 484336 | L2 | Admitted-Finance | |
| 3 | L3₹12.2 L+₹2.2 L (22.0%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹12.3 L+₹2.3 L (22.9%)Admitted-Finance CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | L4 | Admitted-Finance | |
| 5 | L5₹14.6 L+₹4.6 L (45.5%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MAHENDRA SINGH L5 | ANJANI KUMAR GAUTAM L2 | Ram Awadh Singh L4 | KUTBUDDIN ANSARI L3 | MANOJ KUMAR SINGH L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Excavation/cutting in floor /side/roof and dressing using pick axes by manual lobar | ||||||||
| 1.10 | Hard stone | 6.76 | CuM | 4,469 ₹30,210.44 | 3,437.74 ₹23,239.12 | 3,781 ₹25,559.56 | 3,678 ₹24,863.28 | 3,090 ₹20,888.4 Lowest |
| 1.20 | Coal/Shale | 7.36 | CuM | 1,370 ₹10,083.2 | 1,054.2 ₹7,758.91 | 1,159 ₹8,530.24 | 1,128 ₹8,302.08 | 947 ₹6,969.92 Lowest |
| 2.00 | Cleaning of malma,muck slurry in gallery | 32.03 | CuM | 361 ₹11,562.83 | 277.85 ₹8,899.54 | 305 ₹9,769.15 | 297 ₹9,512.91 | 249 ₹7,975.47 Lowest |
| 3.00 | RCC work in U/G incuding centring & shuttering etc reinforce cement for rcc work including cutting bending placing in position and binding etc,all complete(1:2:4) | 31.2 | CuM | 6,424 ₹2,00,428.8 | 4,400 ₹1,37,280 Lowest | 5,435 ₹1,69,572 | 5,341 ₹1,66,639.2 | 4,442 ₹1,38,590.4 |
| 4.00 | 12mm thick cement plaster(1:6), Both side | 256 | SQM | 302 ₹77,312 | 210 ₹53,760 | 241 ₹61,696 | 235 ₹60,160 | 197 ₹50,432 Lowest |
| 5.00Transportation of Material | ||||||||
| 5.10 | Loading of all kinds of building material in to mine tub at incline mouth | 92.17 | CuM | 211 ₹19,447.87 | 162.65 ₹14,991.45 | 178 ₹16,406.26 | 174 ₹16,037.58 | 146 ₹13,456.82 Lowest |
| 5.20 | Unloading of all kinds of building material at destination in UG. | 92.17 | CuM | 140.5 ₹12,949.89 | 108.46 ₹9,996.76 | 119 ₹10,968.23 | 116 ₹10,691.72 | 97 ₹8,940.49 Lowest |
| 5.30 | Tub pushing- Transportation of Material by manual for every 110ft. Or part thereof in Excess of the first 100ft. Total lead 400ft= 400/100 ft=3* 5,.99= 17.97 | 92.17 | CuM | 11.5 ₹1,059.95 | 8 ₹737.36 Lowest | 9.8 ₹903.27 | 9 ₹829.53 | 8 ₹737.36 Lowest |
Tender Value
₹26.5 L
EMD Value
₹33,200
Closing Date
26 Sept 2026, 5:45 pmClosed
General Manager(Oprn.), JK Area
Office of The General Manager(Oprn.), JK Area, P.O-Jamuna Colliery, Dist. Anuppur (MP), Pin-484444, SECL, Bilaspur BILASPUR
Construction of RCC isolation stoppings for sealing Incline Nos. 9/10 and Air Shaft, packing with RCC walls in Air Shaft Gallery, and dismantling/transportation of main mechanical ventilator with associated components at 9/10 UG Mine.
2026_SECL_365551_1
SECL/JK/GM(O)/26-27/eT/07 Dated 15.09.2026
Open Tender
Civil Works - Others
Item Rate
90 days
Jamuna 9/10 Mine, Bhadra Sub Area, JK Area
AS PER NIT
4 documents required · 4 mandatory
₹33,200
8 Oct 2026
15 Sept 2026
28 Sept 2026
15 Sept 2026
26 Sept 2026
16 Sept 2026
16 Sept 2026 - 19 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1Excavation/cutting in floor /side/roof and dressing using pick axes by manual lobar | ||||||
| 1.1 | Hard stone | 6.76 | CuM | 6,875.48 | ₹46,478.24 | 4171.25% |
| 1.2 | Coal/Shale | 7.36 | CuM | 2,108.48 | ₹15,518.41 | 4171.25% |
| 2 | Cleaning of malma,muck slurry in gallery | 32.03 | CuM | 555.78 | ₹17,801.63 | 4171.25% |
| 3 | RCC work in U/G incuding centring & shuttering etc reinforce cement for rcc work including cutting bending placing in position and binding etc,all complete(1:2:4) | 31.2 | CuM | 9,883.5 | ₹3,08,365.2 | 4171.25% |
| 4 | 12mm thick cement plaster(1:6), Both side | 256 | SQM | 439.27 | ₹1,12,453.12 | 4171.25% |
| 5Transportation of Material | ||||||
| 5.1 | Loading of all kinds of building material in to mine tub at incline mouth | 92.17 | CuM | 325.38 | ₹29,990.27 | 4171.25% |
| 5.2 | Unloading of all kinds of building material at destination in UG. | 92.17 | CuM | 216.92 | ₹19,993.52 | 4171.25% |
| 5.3 | Tub pushing- Transportation of Material by manual for every 110ft. Or part thereof in Excess of the first 100ft. Total lead 400ft= 400/100 ft=3* 5,.99= 17.97 | 92.17 | CuM | 17.97 | ₹1,656.29 | 4171.25% |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.16 MB
Tendernotice_3.pdf
PDF • 2.10 MB
Tendernotice_4.pdf
PDF • 1.31 MB
BOQ_378482.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .