| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 3₹22.1 L+₹1.2 L (5.57%)Accepted-AOC | 3 | Accepted-AOC 1st lowest bidder as per norms | |
| 2 | 1₹20.9 LRejected-Finance | 1 | Rejected-Finance AS PER LIMIT OF ACCEPTANCE OF QUOTED BIDS ISSUED BY THE CHIEF CONSERVATOR OF FORESTS AND CHIEF EXECUTIVE OFFICER STATE CAMPA ASSAM | |
| 3 | 2₹20.9 L+₹216.75 (0.01%)Rejected-Finance | 2 | Rejected-Finance AS PER LIMIT OF ACCEPTANCE OF QUOTED BIDS ISSUED BY THE CHIEF CONSERVATOR OF FORESTS AND CHIEF EXECUTIVE OFFICER STATE CAMPA ASSAM | |
| 4 | Rejected-Technical | - | Rejected-Technical IT RETURNS NOT SUBMITTED, FSC/SOLVENCY NOT SUBMITTED |
Tender Value
₹23.3 L
EMD Value
₹46,541
Closing Date
14 Dec 2020, 3:00 pmClosed
DFO, Assam State Zoo
OFFICE OF THE DIVISIONAL FOREST OFFICER, ASSAM STATE ZOO-CUM-BOTANICAL GARDEN, GUWAHATI-781005
CONSTRUCTION OF 4 NOS. OF CHECK DAMS AT ASSAM STATE ZOO, GUWAHATI (ANY OTHER QUERIES, REFER TENDER DOCUMENT)
2020_PCCF_19260_1
Z/CAMPA/A.S.ZOO/2873
Open Tender
Construction Works
Item Rate
180 days
ASSAM STATE ZOO, GUWAHATI
Please refer Tender documents.
2 documents required · 2 mandatory
₹465
₹46,541
Yes
Assam State Zoo, Guwahati
19 Feb 2021
12 Nov 2020
15 Dec 2020
12 Nov 2020
14 Dec 2020
12 Nov 2020
27 Nov 2020
Amount
Earth Work in Foundation: Earth work in excavation of foundation of structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom, backfilling the excavated earth to be extent required. (I) Ordinary Soil
Plain Cement Concrete : Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nomanal size mechanically mixed, placed in foundation & compacted by vibration including curing for 14 days
R.C.C. Works: RCC Works in sub strcture complete as per drawing & technical specification. (B) PCC Grade M20
Cost of Reinforcement: Supplying, fitting & placing TMT CRS (Fe-500) bar reinforcement in sub structure as per drawing & technical specification.
Plastering of Walls: Plastering with cement mortar (1: 3 ) on R.C.C. works as per technical specification.
Boulder Apron: Providing & laying pitching on slopes laid over prepared surface including boulder apron laid down in front of of toe of embankment complete as per drawing & technical specifications.
Camp Hut: Cost of Temporary camp hut to preovide accomudation to the staffs masons, semi skilled labours & chowkiders as well as for storage of the materials.
Earth work in filling in the guide bund by head load upto lead 60 m as specified and directed.
Providing filter behind head wall with granular material as directed.
Daily labour engage for jungle clearence including uprooting of vegitation, grass, brush-wood, sapling and trees not exceeding 300 mm girth and disposal of the same outside the periphery and lift upto 1500 mm.
Earth work in excavation of foundation of structures as per drawing.
Providing & laying pitching on foundation laid over prepared surface including boulder apron laid down as specified.
Providing & laying pitching on foundation laid over prepared surface including boulder apron laid down as specified.
Carriage of materials to the hill areas by head load from point of unloading to the point of preparation complete as directed.
Suranjan Deka
Nipaka Barman
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .