Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.3 LAccepted-AOC | 1 | Accepted-AOC Accepted as L1 bidder and Awarded value is including GSt. | |
| 2 | Rejected-Technical | - | Rejected-Technical Rejected as L4 bidder. | |
| 3 | Rejected-Technical CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | - | Rejected-Technical Rejected as L3 bidder. | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected as L5 bidder. | |
| 5 | Rejected-Technical | - | Rejected-Technical Rejected as L2 bidder. |
Tender Value
₹5.2 L
EMD Value
₹6,500
Closing Date
31 Oct 2022, 5:30 pmClosed
General Manager (Operation)
Office of General Manager, JK Area, Kotma, Anuppur, 484444
Construction of 03 nos. of retaining wall for reorganization of pumping layout and 05 nos. of pump foundation at L.K.II Seam in Bhadra 7/8 mine, Bhadra Sub Area, JK Area.
2022_SECL_259428_1
SECL/JK/GM(O)/22-23/eT/25 Date 15.10.2022
Open Tender
Civil Works - Others
Item Rate
90 days
Bhadra 7/8 Mine, Bhadra SA, JK Area
AS PER NIT
3 documents required · 3 mandatory
₹6,500
27 Feb 2023
15 Oct 2022
1 Nov 2022
15 Oct 2022
31 Oct 2022
16 Oct 2022
15 Oct 2022 - 19 Oct 2022
Amount
Construction of 03 Nos. retaining wall for reorganization of pumping layout at L.K.II Seam
Cleaning of malma, muck & slurry in gallery.
Excavation/cutting in floor/side/roof and dressing using pick axes by manual labour.
Coal/shale
Hard stone
Cleaning of excavated material and disposal in 50 Mtr.
RCC work in U/G including centering & Shuttring etc reinforce cement for RCC work including cutting, bending, placing in position and binding etc all complete. (1:2:4)
12 MM thick cement plaster (1:6)
Transportation of material
Loading of all kinds of building material in to mine tub at incline mouth.
Unloading of all kinds of building material at destination in UG.
Transportation of material by manual labour with 61 Mtr- 75 Mtr leads (Surface & UG).
Pushing of tubs for every 30. 0 Mtr
Transportation of material with tramming & pushing,coupling & uncoupling with haulage for a distance every 500 Mtr or part there of and bringing the empty tubs to surface. (1000 Mtr/500)= 2, 2X197.71=395.42
Cost of material
Cement
Metal Chips
Steel Rod 10MM
Construction of 05 Nos.Pump foundation at L.K.II Seam
Cleaning of malma, muck & slurry in gallery.
Excavation/cutting in floor/side/roof and dressing using pick axes by manual labour.
Hrad Stone
Brick Masonary in under ground in cement/lime mortor ratio of 1:6 A) Height of 1.50 Mtr from floor
PCC work in U/G including centering & shuttering etc. (1:2:4)
12 MM thick cement plaster (1:6)
Transportation of material
Loading of all kinds of building material in to mine tub at incline mouth.
Unloading of all kinds of building material at destination in UG.
Transportation of material by manual labour with 61 Mtr- 75 Mtr leads (Surface & UG).
Pushing of tubs for every 30. 0 Mtr
Transportation of material with tramming & pushing,coupling & uncoupling with haulage for a distance every 500 Mtr or part there of and bringing the empty tubs to surface. (1000 Mtr/500)= 2, 2X197.73=395.42
Cost of material
Cement
Metal Chips
Bricks
Total impact of GST for the purpose of CTC
VIJAY BAHADUR SINGH
Ram Awadh Singh
KUTBUDDIN ANSARI
SHIV SHAKTI TRADERS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .