| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-Finance | ₹8.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹8.4 L+₹9,135 (1.10%)Rejected-Finance | ₹8.4 L+₹9,135 (1.10%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Hayagreeva Earth Movers L2 | T Vaithy L1 |
|---|---|---|---|---|---|
| 1.00Construction of Storm Water Drain | |||||
| 1.10 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thi | 134 | m3 | 117 ₹15,678 | 115 ₹15,410 Lowest |
| 1.20 | Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per sta | 19 | m3 | 5,680 ₹1,07,920 | 5,619 ₹1,06,761 Lowest |
| 1.30Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over (silver oak joists) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification | |||||
| 1.40 | a). Drain Wall up to 90cm | 352 | m2 | 554 ₹1,95,008 | 548 ₹1,92,896 Lowest |
| 1.50 | b). Plain Surface | 17 | m2 | 1,144 ₹19,448 | 1,132 ₹19,244 Lowest |
| 1.60 | Plain cement concrete 1:2:4 mix (One cement two sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per stand | 51 | m3 | 7,083 ₹3,61,233 | 7,007 ₹3,57,357 Lowest |
| 1.70 | Plastering with cement mortar 1:3 mix, 20mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications | 79 | m2 | 630 ₹49,770 | 623 ₹49,217 Lowest |
| 1.80 | Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 81 | m3 | 69 ₹5,589 | 68 ₹5,508 Lowest |
| 1.90 | Providing and laying in position, standardized concrete mix M-20 Grade in accordance with IS 456-2000,using 20mm and downgraded hard broken granite stone jelly for all RCC items of works with minimum cement concrete of 325kg/M3 and maximum water cement ratio of 0.55, including admixture (plasticizer/super plasticizer) in recommended proportions as per IS :9103 to accelerate ,retard setting of concrete , improve workability without preparing strength and durability with about ( 5 cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.30cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79cu.m) 7670kg of sand, but excluding cost of reinforcement grill and fabricating charges , centering and shuttering and also including laying , vibrating with mechanical vibrators ,finishing curing etc., and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming etc., complete | 4.5 | m3 | 8,912 ₹40,104 | 8,816 ₹39,672 Lowest |
Tender Value
₹9.9 L
EMD Value
₹9,900
Closing Date
27 Feb 2026, 3:00 pmClosed
THE COMMISSIONER, SALEM CITY MUNICIPAL CORPORATION
Salem City Municipal Corporation, Fort Main Road, Salem
Construction of Drain and Culvert at Kuppaimedu road (East side) North Portion in Division No. 43 of Ammapet Ward Office
2026_MAWS_657680_1
E8-Est No-229-D-2025-2026
Open Tender
Civil Works
Lump-sum
60 days
Salem City Municipal Corporation
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹9,900
9 Jul 2026
14 Feb 2026
27 Feb 2026
14 Feb 2026
27 Feb 2026
14 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Storm Water Drain | |||||
| 1.1 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thi | 134 | m3 | - | - |
| 1.2 | Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per sta | 19 | m3 | - | - |
| 1.3 | Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over (silver oak joists) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification | - | - | - | - |
| 1.4 | a). Drain Wall up to 90cm | 352 | m2 | - | - |
| 1.5 | b). Plain Surface | 17 | m2 | - | - |
| 1.6 | Plain cement concrete 1:2:4 mix (One cement two sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per stand | 51 | m3 | - | - |
| 1.7 | Plastering with cement mortar 1:3 mix, 20mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications | 79 | m2 | - | - |
| 1.8 | Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 81 | m3 | - | - |
| 1.9 | Providing and laying in position, standardized concrete mix M-20 Grade in accordance with IS 456-2000,using 20mm and downgraded hard broken granite stone jelly for all RCC items of works with minimum cement concrete of 325kg/M3 and maximum water cement ratio of 0.55, including admixture (plasticizer/super plasticizer) in recommended proportions as per IS :9103 to accelerate ,retard setting of concrete , improve workability without preparing strength and durability with about ( 5 cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.30cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79cu.m) 7670kg of sand, but excluding cost of reinforcement grill and fabricating charges , centering and shuttering and also including laying , vibrating with mechanical vibrators ,finishing curing etc., and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming etc., complete | 4.5 | m3 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.84 MB
BOQ_788895.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .