Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.5 LAccepted-AOC | 1 | Accepted-AOC Accept | |
| 2 | 2₹10.6 L+₹7,815 (0.74%)Rejected-AOC | 2 | Rejected-AOC . |
Tender Value
Refer Docs
EMD Value
₹11,700
Closing Date
2 Dec 2019, 3:00 pmClosed
Project Director
DRDA, 3rd floor, Collectorate, Theni
1) Providing BT road from main road to Vaigai river in Gandamanur Panchayat.0/0-450-R184 2. 2) Providing BT road from Gandamanur Main Road to Govt Hr.Sec School Road in Gandamanur Panchayat.0/0-0/125-R186
2019_RDTN_148749_1
2990/2019/D5 Dated 21-11-2019
Open Tender
Civil Works - Roads
Item Rate
180 days
Theni
As per tender document
3 documents required · 3 mandatory
₹0
₹11,700
16 Jun 2020
23 Nov 2019
2 Dec 2019
23 Nov 2019
2 Dec 2019
23 Nov 2019
Amount
Providing BT road from Mainroad to Vaigai river in Gandamanur Panchayat.0/0 to 0/450.
Clearing scrub jungle by uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidental charges etc. complete.Sl.No. 17(3)
Earth work excavating and depositing on bank with an initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250mm loose thick each, sectioning, watering and compacting etc.., complete as per MORT & H 301-305
Providing 75mm consolidated thickness WBM for Top LAYER using 1 cum of Grade III metal of size 63 -11.2MM IRCsize HBG metal (1M3 Grade III HBG = 0.025Cum of 63mm + 0.20Cum of 53mm + 0.725Cum of 45mm + 0.025Cum of 22.4mm + 0.025Cum of 11.2mm) with 0.24 cum of gravel for 10sqm including cost and conveyance of all materials from approved quarries to roadside and stacking of materials to departmental gauge for premeasurements including labour for laying, spreading new metal, hand packing to camber, watering with all leads for good water even if the season is worst drought condition forming edge bunds and consolidation by 8 to 10 tonne power roller and finishing to the total thickness with lines grades and cross sections as specified in the departmental specifications including hire charges for all T&P fuel cost and other running charges for power roller and other tools and plants employed and all other incidental charges etc., complete.
Applying tack coat using 4.00kgs of 10sqm over the WBM surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST.
Providing and laying premix carpet with seal coat type A, 20mmconsolidated thickness using IRC size machine broken HBG metal 0.18cum of 13.2mm and 0.09cum of machine crushed broken HBG metal of 11.20mm with 14.60kg of bitumen for premixing for 10sqm of premix carpet and 0.09cum 0.09cum of 6.70mm IRC size machine broken HBG metal with 9.80kgs of bitumen for sealcoat including cost and conveyance of all materials from approved quarry including the cost of bitumen which will be supplied departmentally and cost will be recovered at the rates specified in the special condition appended herewith and including conveyance bitumen to workspot handling charges for the same at both ends including labour charges for heating the bitumen to required temperature and mixing the required quantity of metal and bitumen using mini hot mix plant conveying the mix by wheel borrow including labour charges for spreading the mix to grades,lines and profile and consolidation with power roller rolling etc.,including hire,fuelcharges and running charges for mini hot mix plant,power roller and all other tools and plants employed &all incidental charges such as barricading, providing danger lights etc.,complete complying with standard specification(Payment shall be made for the finished item of work after compaction)No.509&513 of MOST.
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Provision for Name Board
Providing BT Road from Gandamanur mainroad to Govt Hr.Sec School in Gandamanur Panchayat.0/0-0/125
Clearing scrub jungle by uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidental charges etc. complete.Sl.No. 17(3)
Earth work excavating and depositing on bank with an initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250mm loose thick each, sectioning, watering and compacting etc.., complete as per MORT & H 301-305
Providing 75mm consolidated thickness WBM for Bottom LAYER using 1 cum of Grade II metal of size 75 -11.2MM IRCsize HBG metal (1M3 Grade III HBG = 0.025Cum of 63mm + 0.20Cum of 53mm + 0.725Cum of 45mm + 0.025Cum of 22.4mm + 0.025Cum of 11.2mm) with 0.24 cum of gravel for 10sqm including cost and conveyance of all materials from approved quarries to roadside and stacking of materials to departmental gauge for premeasurements including labour for laying, spreading new metal, hand packing to camber, watering with all leads for good water even if the season is worst drought condition forming edge bunds and consolidation by 8 to 10 tonne power roller and finishing to the total thickness with lines grades and cross sections as specified in the departmental specifications including hire charges for all T&P fuel cost and other running charges for power roller and other tools and plants employed and all other incidental charges etc., complete.
Providing 75mm consolidated thickness WBM for Top LAYER using 1 cum of Grade III metal of size 63 -11.2MM IRCsize HBG metal (1M3 Grade III HBG = 0.025Cum of 63mm + 0.20Cum of 53mm + 0.725Cum of 45mm + 0.025Cum of 22.4mm + 0.025Cum of 11.2mm) with 0.24 cum of gravel for 10sqm including cost and conveyance of all materials from approved quarries to roadside and stacking of materials to departmental gauge for premeasurements including labour for laying, spreading new metal, hand packing to camber, watering with all leads for good water even if the season is worst drought condition forming edge bunds and consolidation by 8 to 10 tonne power roller and finishing to the total thickness with lines grades and cross sections as specified in the departmental specifications including hire charges for all T&P fuel cost and other running charges for power roller and other tools and plants employed and all other incidental charges etc., complete.
Applying tack coat using 4.00kgs of 10sqm over the WBM surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST.
Providing and laying premix carpet with seal coat type A, 20mmconsolidated thickness using IRC size machine broken HBG metal 0.18cum of 13.2mm and 0.09cum of machine crushed broken HBG metal of 11.20mm with 14.60kg of bitumen for premixing for 10sqm of premix carpet and 0.09cum 0.09cum of 6.70mm IRC size machine broken HBG metal with 9.80kgs of bitumen for sealcoat including cost and conveyance of all materials from approved quarry including the cost of bitumen which will be supplied departmentally and cost will be recovered at the rates specified in the special condition appended herewith and including conveyance bitumen to workspot handling charges for the same at both ends including labour charges for heating the bitumen to required temperature and mixing the required quantity of metal and bitumen using mini hot mix plant conveying the mix by wheel borrow including labour charges for spreading the mix to grades,lines and profile and consolidation with power roller rolling etc.,including hire,fuelcharges and running charges for mini hot mix plant,power roller and all other tools and plants employed &all incidental charges such as barricading, providing danger lights etc.,complete complying with standard specification(Payment shall be made for the finished item of work after compaction)No.509&513 of MOST.
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Provision for name board
Provision for Sign board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M.K.Murugan
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .