Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1B₹3.1 LAccepted-AOC | 1B | Accepted-AOC 1st lowest | |
| 2 | 1B₹3.3 LRejected-AOC 00 BALAJI ENTERPRISES NEW ROAD NEW ROAD RATLAM MADHYA PRADESH 457001 | RATLAM | MADHYA PRADESH | 457001 | 1B | Rejected-AOC 2nd lowest | |
| 3 | Rejected-Technical | - | Rejected-Technical Income tax return certificate not submitted. |
Tender Value
₹3.1 L
EMD Value
₹6,300
Closing Date
24 Feb 2025, 3:00 pmClosed
EXECUTIVE ENGINEER
office of the E.E D.W and S Mech. Division, Jamshedpur.
Annual RM of MGM Collage Government Building Water Supply Scheme at MGM Girls Hostel Pumping plant under D.W and S Mech. Division, Jamshedpur
2025_DWSD_98639_1
DWSMD/JAMSHEDPUR/15(24-25) GROUP-B
Open Tender
Repair and Maintenance Works
Item Wise
20 days
Jamshedpur
please refer tender document
3 documents required · 3 mandatory
₹750
₹6,300
Yes
30 May 2025
19 Feb 2025
25 Feb 2025
19 Feb 2025
24 Feb 2025
19 Feb 2025
Amount
Cost towards lifting of the 5 H.P Sub. P/set from high yielding T/W with 2" dia column pipe total depth of 140' - 160' with all tools and tackles including labour charges all complete.
Cost towards rewinding of 5 H.P Sub. motor by supplying PVC insulated water proof copper wire as per size required changing and fitting thrust plate - 1 No. G.M bearing bushed for top and bottom and fitting rotor into stator after completion of rewinding work testing the motor on load at side all complete
Cost of repairing of 5 H.P Sub. Pump by changing and fitting new S.S pump shaft as per sample changing its 3 Nos. G.M impeller changing 5 Nos. G.M bush locking key and reassembly its pump all complete.
Supplying and fitting 4 mm² PVC insulated & sheathed Sub cable of reputed make
Cost towards S/F 2" dia column pipe make TATA Or JINDAL Or Reputed Make
Supplying & fitting 2" dia Sluice valve ISI Mark
Supplying & fitting 2" dia N.R valve ISI Mark
Chemical earthing 3 meters and 80 mm hole size with electrode and chemical compound etc. with watering pipe and locking arrangement including soldering, riveting, jointing G.I flat 50 mm x 6 mm to all equipments.
Supplying and fixing 100 Amp. 415± 15% voltage change over switch, Havell's / L & T make
Dismantling Old plaster pointing in cement or lime and ranking out joints to 15 mm, depth watering and disposal of unserviceable materials with all leads all complete as per direction of E/I (38.97 x 20.40) x 2 = 118.74 m2 (11.22 x 10.72) x 2 = 43.88 m2 (17.77 x 17.77) x 2 = 71.08 m2 Ceiling 45.48 m2 Total 279.18 m2 Deduction - (2.13 x 1.22 ) x 2 x 3 = 15.59 m2 (1.22 x 1.06 x 2 x 6 = 15.51 m2 Total 31.10 m2 (279.18 m2 - 31.10 m2 ) = Net 248.08 m2
Cost towards lifting of the 5 H.P Sub. P/set from high yielding T/W with 2" dia column pipe total depth of 140' - 160' with all tools and tackles including labour charges all complete.
Cost towards rewinding of 5 H.P Sub. motor by supplying PVC insulated water proof copper wire as per size required changing and fitting thrust plate - 1 No. G.M bearing bushed for top and bottom and fitting rotor into stator after completion of rewinding work testing the motor on load at side all complete
Cost of repairing of 5 H.P Sub. Pump by changing and fitting new S.S pump shaft as per sample changing its 3 Nos. G.M impeller changing 5 Nos. G.M bush locking key and reassembly its pump all complete.
Dismantling patent stone floor including stacking serviceable materials in countable stacks within 15 m. lead and disposal of unserviceable materials with all leads all compete as per direction of E/I (6.40 x 3.35 ) = 21.44 m2 (3.35 x 3.20 ) = 10.72 m2 (3.65 x 3.65) = 13.32 m2 Total 45.48 m2
Providing 12 mm. Thick cement plaster (1; 6)with clean coarse send of F.M 1.5, including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I (38.97 x 20.40) x 2 = 118.74 m2 (11.22 x 10.72) x 2 = 43.88 m2 (17.77 x 17.77) x 2 = 71.08 m2 Ceiling 45.48 m2 Total 279.18 m2 Deduction - (2.13 x 1.22 ) x 2 x 3 = 15.59 m2 (1.22 x 1.06 x 2 x 6 = 15.51 m2 Total 31.10 m2 (279.18 m2 - 31.10 m2 ) = Net 248.08 m2
Balaji Enterprises (BID ID -647971)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .