Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.7 LAccepted-AOC NH 148 B NEAR BABA GHISARAM FILLING STATION VILLAGE PALI MAHENDERGARH 123029 | MAHENDERGARH | MAHENDERGARH | HARYANA | 123029 | ₹25.7 L | L1 | Accepted-AOC accepted |
| 2 | L2₹26.3 LRejected-AOC | ₹26.3 L | L2 | Rejected-AOC rejected |
| 3 | L3₹27.2 LRejected-AOC 705 SECTOR 23 127021 | BHIWANI | HARYANA | 127021 | ₹27.2 L | L3 | Rejected-AOC rejected |
| 4 | L4₹31.1 LRejected-AOC | ₹31.1 L | L4 | Rejected-AOC rejected |
| 5 | L5₹31.6 LRejected-AOC | ₹31.6 L | L5 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | vats solar private limited L3 | SUNGLOW ELECTRIC POWER PVT. LTD. L1 | ARYA ELECTRIC COMPANY L2 | OM SOLAR SOLUTIONS L4 | DEV POWER SYSTEMS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00HSR Items | ||||||||
| 1.01 | [32.70.2]Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:-
(a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years.
(b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz plus /- 2.5 Hz, output voltage suitable to generate AC
(c) Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degrees C. The PCU shall adjust the voltage and frequency level to suit grid frequency
(d) Data Monitoring System complete with accessories.
(e) Fixing of Array junction box and Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required.
(f) Lightning and surge voltage protection.
(g) Connections and Interconnections by supplying and fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc. as required. 2. Above 10 kWp and up to 100 Kwp [Through Rate] | 80 | KWp | 33,999 ₹27.2 L | 32,172.2 ₹25.7 L | 32,900 ₹26.3 L | 38,900 ₹31.1 L | 39,460 ₹31.6 L |
Tender Value
₹34.3 L
EMD Value
₹68,640
Closing Date
26 Dec 2025, 5:00 pmClosed
AMIT GOYAL
ED - Rohtak
Providing solar power plant only
2025_HRY_491565_1
202583CE6F57 9AD3 4813 9706 4432591F2627667BAR
Open Tender
Electrical Works
90 days
Kalanaur
Technical documents as per approved DNIT conditions.
3 documents required · 3 mandatory
₹5,000
₹68,640
Yes
27 Mar 2026
18 Dec 2025
29 Dec 2025
18 Dec 2025
26 Dec 2025
18 Dec 2025
[32.70.2]Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- (a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz plus /- 2.5 Hz, output voltage suitable to generate AC (c) Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degrees C. The PCU shall adjust the voltage and frequency level to suit grid frequency (d) Data Monitoring System complete with accessories. (e) Fixing of Array junction box and Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. (f) Lightning and surge voltage protection. (g) Connections and Interconnections by supplying and fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc. as required. 2. Above 10 kWp and up to 100 Kwp [Through Rate]
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_569888.xls
BOQ • 0.28 MB
AD0143750.pdf
Additional Documents • 2.72 MB
OT0143750.pdf
Other Document • 0.79 MB
Download all tender documents and submit your bid