Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 CrAccepted-AOC | ₹7.7 Cr | L1 | Accepted-AOC AS UPLOADED |
| 2 | L2₹8.0 Cr+₹39.2 L (5.12%)Rejected-AOC | ₹8.0 Cr+₹39.2 L (5.12%) | L2 | Rejected-AOC AS UPLOADED |
| 3 | L3₹8.1 Cr+₹47.7 L (6.23%)Rejected-AOC AGRA ROAD ETA | ETA | ETA | UTTAR PRADESH | ₹8.1 Cr+₹47.7 L (6.23%) | L3 | Rejected-AOC AS UPLOADED |
| 4 | L4₹8.1 Cr+₹48.0 L (6.27%)Rejected-AOC 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹8.1 Cr+₹48.0 L (6.27%) | L4 | Rejected-AOC AS UPLOADED |
| 5 | L5₹8.2 Cr+₹50.5 L (6.59%)Rejected-AOC | ₹8.2 Cr+₹50.5 L (6.59%) | L5 | Rejected-AOC AS UPLOADED |
| Sl No | Description | Qty | Unit | M/S CHAUDHARY ENTERPRISES L4 | RAM SANEHI AND SONS L3 | RAM NARAYAN YADAV L2 | ASHUTOSH KUMAR VERMA L1 | M/S CHANDRA MAULI MISHRA CONTRECTOR L6 | VIRAT CONSTRUCTION L5 | MS YADAV AND SONS L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Earth work in excavation with rough dressing with intial lead of 30 m and lift upto 1.5 m for flood work for proper completion of work as per direction of Engineer in-Charge. | 28,160 | Cum | 75 ₹21,12,000 | 70 ₹19,71,200 | 70 ₹19,71,200 | 50 ₹14,08,000 Lowest | 75 ₹21,12,000 | 73 ₹20,55,680 | 71 ₹19,99,360 |
| 1.02 | Providing and Laying of Mzp stone boulder (25 to 40 kg. minimum dimension 200 mm) in mechanically woven double twisted hexagonal shaped BIS Standared class 2 as per IS code 16014: 2024 of required sizes 3.00x2.00x0.45 m (1 no. diaphragm size 3x0.45m along the gabion length and 2 no. diaphragms size (2x0.45) across the length of gabion) Mesh type 10.00x12.00 cm polymer (PVC/PA6) coated, Mesh wire dia 2.7/3.7 mm (ID/OD), edged/Selvedge dia 3.4/4.4 mm (ID/OD) with partitions at every 1m interval and shall have minimum 10 no. of opening per mtr. of mesh perpendicular twist typing with lacing wire of dia 2.2/3.2 mm (ID/OD) of construction of launching apron and gabion wall including all material, labour, T&P, carraige, loading, unloading, royality all taxes but excluding GST etc. and tying with lacing wire all complete as per direction of Engineer -in-charge. | 8,820 | Cum | 5,873 ₹5,17,99,860 | 5,850 ₹5,15,97,000 | 5,800 ₹5,11,56,000 | 5,600 ₹4,93,92,000 Lowest | 5,872 ₹5,17,91,040 | 5,870 ₹5,17,73,400 | 5,900 ₹5,20,38,000 |
| 1.03 | Providing and Laying of Mzp stone boulder (25 to 40 kg. minimum dimension 200 mm) in mechanically woven double twisted hexagonal shaped BIS Standared class 2 as per IS code 16014: 2024 of required sizes 3.00x1.00x0.45 m ( 2 no. diaphragms size (1x0.45) across the length of gabion) Mesh type 10.00x12.00 cm polymer (PVC/PA6) coated, Mesh wire dia 2.7/3.7 mm (ID/OD), edged/Selvedge dia 3.4/4.4 mm (ID/OD) with partitions at every 1m interval and shall have minimum 10 no. of opening per mtr. of mesh perpendicular twist typing with lacing wire of dia 2.2/3.2 mm (ID/OD) of construction of launching apron and gabion wall including all material, labour, T&P, carraige, loading, unloading, royality all taxes but excluding GST etc. and tying with lacing wire all complete as per direction of Engineer -in-charge. | 180 | Cum | 5,976 ₹10,75,680 | 5,900 ₹10,62,000 | 5,900 ₹10,62,000 | 5,700 ₹10,26,000 Lowest | 5,975 ₹10,75,500 | 5,973 ₹10,75,140 | 5,900 ₹10,62,000 |
| 1.04 | Preparation of sub grade including watering compaction for laying in slope in existing earth with excavater attached with roller for proper complection of work as per direction of Engineer in-Charge. | 6,250 | Sqm | 50 ₹3,12,500 | 50 ₹3,12,500 | 50 ₹3,12,500 | 50 ₹3,12,500 | 50 ₹3,12,500 | 49 ₹3,06,250 Lowest | 50 ₹3,12,500 |
| 1.05 | Providing and laying Geo Textile sheet made of 200 gsm woven with multifilament polypropylene yarn over prepared earthen surface for slope pitching i/c of all cost of materials, labour all taxes T&P etc as per direction of Engineer in-Charge. | 15,500 | Sqm | 115 ₹17,82,500 | 115 ₹17,82,500 | 110 ₹17,05,000 | 100 ₹15,50,000 Lowest | 114 ₹17,67,000 | 112.5 ₹17,43,750 | 115 ₹17,82,500 |
| 1.06 | Providing and Pitching of Mzp stone boulder (25 to 40 kg. minimum dimension 200 mm) in mechanically woven double twisted hexagonal shaped BIS Standared class 2 as per IS code 16014: 2024 of required sizes 3.00x2.00x0.45 m (1 no. diaphragm size 3x0.45m along the gabion length and 2 no. diaphragms size (2x0.45) across the length of gabion) Mesh type 10.00x12.00 cm polymer (PVC/PA6) coated, Mesh wire dia 2.7/3.7 mm (ID/OD), edged/Selvedge dia 3.4/4.4 mm (ID/OD) with partitions at every 1m interval and shall have minimum 10 no. of opening per mtr. of mesh perpendicular twist typing with lacing wire of dia 2.2/3.2 mm (ID/OD) of construction of pitching including all material, labour, T&P, carraige, loading, unloading, royality all taxes but excluding GST etc. and tying with lacing wire all complete as per direction of Engineer -in-charge. | 3,420 | Cum | 5,900 ₹2,01,78,000 | 5,950 ₹2,03,49,000 | 5,900 ₹2,01,78,000 | 5,600 ₹1,91,52,000 Lowest | 5,949 ₹2,03,45,580 | 5,945 ₹2,03,31,900 | 5,950 ₹2,03,49,000 |
| 1.07 | Providing and Pitching of Mzp stone boulder (25 to 40 kg. minimum dimension 200 mm) in mechanically woven double twisted hexagonal shaped BIS Standared class 2 as per IS code 16014: 2024 of required sizes 3.00x1.00x0.45 m (2 no. diaphragms size (1x0.45) across the length of gabion) Mesh type 10.00x12.00 cm polymer (PVC/PA6) coated, Mesh wire dia 2.7/3.7 mm (ID/OD), edged/Selvedge dia 3.4/4.4 mm (ID/OD) with partitions at every 1m interval and shall have minimum 10 no. of opening per mtr. of mesh perpendicular twist typing with lacing wire of dia 2.2/3.2 mm (ID/OD) of construction of pitching including all material, labour, T&P, carraige, loading, unloading, royality all taxes but excluding GST etc. and tying with lacing wire all complete as per direction of Engineer -in-charge. | 180 | Cum | 6,053 ₹10,89,540 | 6,050 ₹10,89,000 | 6,000 ₹10,80,000 | 5,600 ₹10,08,000 Lowest | 6,052 ₹10,89,360 | 6,050 ₹10,89,000 | 6,050 ₹10,89,000 |
| 1.08 | Providing and laying R.C.C. (1:1.5:3) Porcupines (3.0X3.0X3.0)m size with R.C.C. member of (by 3.0X0.10X0.10)m size, as per drawing, filled with jhakhar including cost of all materials, carriage, labour T&P etc with all porcupine tagged to each other by 8 SWG G.I. wire complete as per direction of Engineer in-Charge. | 301 | Set | 10,000 ₹30,10,000 | 10,500 ₹31,60,500 | 10,000 ₹30,10,000 | 9,000 ₹27,09,000 Lowest | 10,730 ₹32,29,730 | 10,725 ₹32,28,225 | 10,500 ₹31,60,500 |
Tender Value
Refer Docs
EMD Value
₹16.4 L
Closing Date
13 Mar 2026, 2:00 pmClosed
SUPERINTENDING ENGINEER
GANDAK IRRIGATION WORKS CIRCLE-2, GORAKHPUR(U.P)
Construction Of Revetment Between Km. 3.500 To 4.000 And Laying 3 Row R.C.C. Porcupine Of Ahiraulidan-Pipraghat Bund Situated On Right Bank Of River Great Gandak In District-Kushinagar.
2026_UPIDC_1122376_19
05/SE/2025-26
Open Tender
Civil Works
Item Rate
90 days
KUSHINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,354
₹16.4 L
GORAKHPUR
9 Apr 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
7 Mar 2026
Earth work in excavation with rough dressing with intial lead of 30 m and lift upto 1.5 m for flood work for proper completion of work as per direction of Engineer in-Charge.
Providing and Laying of Mzp stone boulder (25 to 40 kg. minimum dimension 200 mm) in mechanically woven double twisted hexagonal shaped BIS Standared class 2 as per IS code 16014: 2024 of required sizes 3.00x2.00x0.45 m (1 no. diaphragm size 3x0.45m along the gabion length and 2 no. diaphragms size (2x0.45) across the length of gabion) Mesh type 10.00x12.00 cm polymer (PVC/PA6) coated, Mesh wire dia 2.7/3.7 mm (ID/OD), edged/Selvedge dia 3.4/4.4 mm (ID/OD) with partitions at every 1m interval and shall have minimum 10 no. of opening per mtr. of mesh perpendicular twist typing with lacing wire of dia 2.2/3.2 mm (ID/OD) of construction of launching apron and gabion wall including all material, labour, T&P, carraige, loading, unloading, royality all taxes but excluding GST etc. and tying with lacing wire all complete as per direction of Engineer -in-charge.
Providing and Laying of Mzp stone boulder (25 to 40 kg. minimum dimension 200 mm) in mechanically woven double twisted hexagonal shaped BIS Standared class 2 as per IS code 16014: 2024 of required sizes 3.00x1.00x0.45 m ( 2 no. diaphragms size (1x0.45) across the length of gabion) Mesh type 10.00x12.00 cm polymer (PVC/PA6) coated, Mesh wire dia 2.7/3.7 mm (ID/OD), edged/Selvedge dia 3.4/4.4 mm (ID/OD) with partitions at every 1m interval and shall have minimum 10 no. of opening per mtr. of mesh perpendicular twist typing with lacing wire of dia 2.2/3.2 mm (ID/OD) of construction of launching apron and gabion wall including all material, labour, T&P, carraige, loading, unloading, royality all taxes but excluding GST etc. and tying with lacing wire all complete as per direction of Engineer -in-charge.
Preparation of sub grade including watering compaction for laying in slope in existing earth with excavater attached with roller for proper complection of work as per direction of Engineer in-Charge.
Providing and laying Geo Textile sheet made of 200 gsm woven with multifilament polypropylene yarn over prepared earthen surface for slope pitching i/c of all cost of materials, labour all taxes T&P etc as per direction of Engineer in-Charge.
Providing and Pitching of Mzp stone boulder (25 to 40 kg. minimum dimension 200 mm) in mechanically woven double twisted hexagonal shaped BIS Standared class 2 as per IS code 16014: 2024 of required sizes 3.00x2.00x0.45 m (1 no. diaphragm size 3x0.45m along the gabion length and 2 no. diaphragms size (2x0.45) across the length of gabion) Mesh type 10.00x12.00 cm polymer (PVC/PA6) coated, Mesh wire dia 2.7/3.7 mm (ID/OD), edged/Selvedge dia 3.4/4.4 mm (ID/OD) with partitions at every 1m interval and shall have minimum 10 no. of opening per mtr. of mesh perpendicular twist typing with lacing wire of dia 2.2/3.2 mm (ID/OD) of construction of pitching including all material, labour, T&P, carraige, loading, unloading, royality all taxes but excluding GST etc. and tying with lacing wire all complete as per direction of Engineer -in-charge.
Providing and Pitching of Mzp stone boulder (25 to 40 kg. minimum dimension 200 mm) in mechanically woven double twisted hexagonal shaped BIS Standared class 2 as per IS code 16014: 2024 of required sizes 3.00x1.00x0.45 m (2 no. diaphragms size (1x0.45) across the length of gabion) Mesh type 10.00x12.00 cm polymer (PVC/PA6) coated, Mesh wire dia 2.7/3.7 mm (ID/OD), edged/Selvedge dia 3.4/4.4 mm (ID/OD) with partitions at every 1m interval and shall have minimum 10 no. of opening per mtr. of mesh perpendicular twist typing with lacing wire of dia 2.2/3.2 mm (ID/OD) of construction of pitching including all material, labour, T&P, carraige, loading, unloading, royality all taxes but excluding GST etc. and tying with lacing wire all complete as per direction of Engineer -in-charge.
Providing and laying R.C.C. (1:1.5:3) Porcupines (3.0X3.0X3.0)m size with R.C.C. member of (by 3.0X0.10X0.10)m size, as per drawing, filled with jhakhar including cost of all materials, carriage, labour T&P etc with all porcupine tagged to each other by 8 SWG G.I. wire complete as per direction of Engineer in-Charge.
stage.html
html • 0.06 MB
techsummary_2089956.pdf
BOQ Comparative Chart
xlsx
finsummary_2089956.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
19.pdf
Tender Documents • 1.88 MB
BOQ_2089956.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .