Loading…
Loading…
Tender Value
₹42.3 L
EMD Value
₹42,400
Closing Date
13 Jul 2026, 5:00 pm5d left
Executive Officer
O/O Executive Officer, Angul Municipality
Construction of drain inside Kadam padia of Angul Municipality
2026_ORULB_133611_8
EO/AGLM-02/2026-27
Open Tender
Civil Works - Others
90 days
Angul
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹42,400
Yes
1 Jul 2026
1 Jul 2026
14 Jul 2026
1 Jul 2026
13 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in foundation in all kind of soil within 50m intial lead and 1.50m intial lift including rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and as per the direction of the EIC. | 1 | %cum | 25,542.78 | ₹25,517.24 |
| 2 | Filling in foundation and plinth with sand watered and rammed as per OPWD specification including all cost of materials, labour, conveyance, royality, cess, Tools and plants etc. all complete required for the work | - | cum | 1,015.25 | - |
| 3 | Cement concrete (1:4:8) with 40mm size crusher broken hard granite metal including all cost of materials, labour, conveyance,royality,cess, Tools and plants water for curing etc. all complete as per OPWD specification required for the work. | 1 | cum | 5,694.14 | ₹5,688.45 |
| 4 | Cement work M20 grade with 20mm and down grade crusher broken hard granite chips including hoisting and laying all cost of materials, labour, conveyance, royality,cess,Tools and plants water for curing etc. all complete as per OPWD specification. | 1 | cum | 6,098.9 | ₹6,092.8 |
| 5 | Requirement of HYSD/MS rod & labour for cutting,bending,binding, straghting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 guage etc. complete. | 1 | Qntl. | 8,530.46 | ₹8,521.93 |
| 6 | Rigid and smooth centring and shuttering for CC/RCC works in foundation, plinth band and footings bases of columns mass concrete pre-cast slabs etc including false work and dismentalling thenafter casting including cost of materials,cess complete in ground floor. | 1 | Sqm | 248.57 | ₹248.32 |
| 7 | 6mm thick cement plaster in cement mortar (1:4) including cement punning and all cost of materials, labour, conveyance, royality,cess, Tools and plants water for curing etc. all complete as per OPWD specification required for the work. | 1 | Sqm | 220.86 | ₹220.64 |
| 8 | Filling in foundation and plinth with excavated materials including watering and rammning as directed by EIC. | - | %cum | 17,028.52 | - |
| 9 | Cost of display board, paint & letter writing over display board (Paid as per actual observation) | - | LS | 10,000 | - |
| 10 | Add for contigency unforseen items | - | Ls | 41,906 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
DTCN1.pdf
Tender Documents • 0.69 MB
BOQ_598963.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid