Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 CrAdmitted-Finance | -44.58% | ₹3.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.5 CrAdmitted-Finance | -42.78% | ₹3.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹3.6 CrAdmitted-Finance | -40.41% | ₹3.6 Cr | L3 | Admitted-Finance |
| 4 | L4₹4.2 CrAdmitted-Finance | -31.33% | ₹4.2 Cr | L4 | Admitted-Finance |
| 5 | L5₹4.4 CrAdmitted-Finance | -27.53% | ₹4.4 Cr | L5 | Admitted-Finance |
Tender Value
₹6.1 Cr
EMD Value
₹12.1 L
Closing Date
13 May 2026, 4:00 pmClosed
SE PWD R and B KATHUA SAMBA CIRCLE KATHUA
SE PWD R and B KATHUA SAMBA CIRCLE KATHUA
Please refers to BOQ
2026_PWDJK_308705_1
e-NIT No.PWD/SE/KS/05 of 2026-27 Dated 23-04-2026
Open Tender
Civil Works - Roads
730 days
KATHUA BILLAWAR
Please refers to NIT/SBD
5 documents required · 5 mandatory
₹6,000
SE PWD R and B KATHUA SAMBA CIRCLE KATHUA
₹12.1 L
SE PWD R and B KATHUA SAMBA CIRCLE KATHUA
29 May 2026
27 Apr 2026
14 May 2026
27 Apr 2026
13 May 2026
27 Apr 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | ||||||
| 1.01 | All kinds of soil = 80% | 7,233.6 | Cum | 187.3 | ₹13,54,853.28 | - |
| 1.02 | Ordinary Rock=20% | 1,808.4 | Cum | 392.8 | ₹7,10,339.52 | 12.26 |
| 2Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | ||||||
| 2.01 | All kinds of soil :80% | 3,915.43 | Cum | 256.85 | ₹10,05,678.2 | - |
| 2.02 | Ordinary Rock= 20% | 978.86 | Cum | 493.5 | ₹4,83,067.41 | 3.36 |
| 3Providing and laying in position cement concrete of specified grade excludingthe cost of centring and shuttering - All work upto plinth level | ||||||
| 3.01 | 1:5:10 (1 cement:5 fine sand : 10 graded nallah stone aggregate 40mm nominal size) | 261.8 | Cum | 4,826.5 | ₹12,63,577.7 | - |
| 3.02 | 1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size). | 1,751.53 | Cum | 5,733.6 | ₹1,00,42,572.41 | - |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness)including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses,string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills,fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.A)1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 678 | Cum | 7,564.8 | ₹51,28,934.4 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
BOQ_1000128.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid