Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC RAMANATHAPURAM | RAMANATHAPURAM | RAMANATHAPURAM | TAMIL NADU | 623115 | L1 | Accepted-AOC Lowest Quoted | |
| 2 | L2₹3.0 Cr+₹14.2 L (5.02%)Rejected-Finance 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹3.0 Cr+₹19.9 L (7.02%)Rejected-Finance 28 7 CHITABARANATHAPURAM 1ST STREET DEVAKOTTAI SIVAGANGAI DISTT | DEVAKOTTAI | SIVAGANGAI | TAMIL NADU | L3 | Rejected-Finance Rejected |
Tender Value
₹2.8 Cr
EMD Value
₹1.6 L
Closing Date
14 Nov 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE H NRR TNV
Office of the SE H, NRR, AR line Road, Tirunelveli-2
Construction of High Level Bridge at Km 10/2 of Kanniseri to Mathiyasenai road in lieu of existing causeway
2023_HWAY_382377_1
TN No_15_3_2023_2024_Kanniseri
Open Tender
Civil Works - Bridges
Percentage
270 days
Virudhunagar
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.6 L
12 Dec 2023
27 Oct 2023
20 Nov 2023
27 Oct 2023
14 Nov 2023
27 Oct 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | Bridge work | - | - | - | - |
| 1.01 | Earthwork excavation in all classes of soil as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL. | 244.32 | Cubic Metre | 112.05 | ₹27,376.06 |
| 1.02 | Earthwork excavation in Soft disintegarated rock/ Kangar not requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS ,WINGS and piers | 882.24 | Cubic Metre | 491.8 | ₹4,33,885.63 |
| 1.03 | Cement Concrete M10 Nominal mix (1:3:6) using 40mm ISS HBG graded metal as the max. size of coarse aggreagates including cost & conveyance of all materials to site and cost of cement at site, but excluding cost & fabrication of steel, but including cost of form work, soft water, labour charges for mixing, transporting, laying, curing concrete working at depths, hire charges for T&P including all other incidental charges etc., complete as per relevant std specification for LEVELLING COURSE BELOW FOOTING OF PIERS,ABUTMENTS AND WING WALLS | 35.65 | Cubic Metre | 5,188.88 | ₹1,84,983.57 |
| 1.04 | Vibrated Cement Concrete of grade M20 Nominal Mix (1:1.5:3) using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOOTINGS OF ABUTMENT WINGS AND PIERS BELOW SILL LEVEL. | 454.21 | Cubic Metre | 7,045.16 | ₹31,99,982.12 |
| 1.05 | Vibrated Cement Concrete of grade M20 Nominal Mix (1:1.5:3) using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at heights , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, WINGS, AND PIERS ABOVE SILL LEVEL. | 152.34 | Cubic Metre | 8,698.93 | ₹13,25,195 |
| 1.06 | Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hire charges for tools and Plants, including all other incidental charges, etc., complete for BED BLOCK CUM DIRTWALL and Bed Block Over Piers as per Sections 1500, 1700 & 2200 of MoRT&(H) Specifications (Fifth Revision) | 14.46 | Cubic Metre | 12,050.17 | ₹1,74,245.46 |
| 1.07 | Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN THE ABUTMENTS AND WINGS, - | 60 | Running Metre | 177.5 | ₹10,650 |
| 1.08 | Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to work site, labour charges for fixing the same in the correct position and all other incidental charges et., complete. | 43.49 | Square Metre | 100 | ₹4,349 |
| 1.09 | Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hire charges for tools and plants, including all other incidental charges, etc., complete for DECK SLAB, KERBS & safety kerbs as per Sections 1500,1700 and 2300 of MoRT&(H) Specifications (Fifth Revision). | 334.46 | Cubic Metre | 12,113.05 | ₹40,51,330.7 |
stage.html
html • 0.04 MB
techsummary_455719.pdf
PDF • 0.28 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_455719.pdf
PDF • 0.21 MB
382377_HLB_Kanniseri_10_2_Road_AOC.pdf
PDF • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
Tender Document • 0.18 MB
PQ_kanniseri_Km_10_2.pdf
Tender Document • 0.61 MB
PB_kanniseri_Km_10_2.pdf
Tender Document • 0.54 MB
Datepostponed_Corri.pdf
Tender Document • 0.14 MB
Pertchart_Kanniseri.pdf
Tender Document • 0.13 MB
BOQ_455719.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .