Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹4.7 L
EMD Value
₹9,360
Closing Date
13 Jan 2023, 4:30 pmClosed
Unit Head RIICO Aburoad
RIICO Office Ambaji Industrial Area Aburoad 307026
Operation and Maintenance of Water Supply Scheme at IndustrialArea sarneshwar, sheoganj and sheoganj ext, dist. sirohi.
2022_RIICO_312539_1
2022/Abu Road/27
Open Tender
Civil Works
Item Rate
365 days
Sirohi Sheoganj
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
RIICO LTD aburoad
₹9,360
Yes
20 Jan 2023
4 Jan 2023
18 Jan 2023
4 Jan 2023
13 Jan 2023
4 Jan 2023
Amount
Operation and Maintenance of Water Supply Scheme at Industrial Area sheoganj and sheoganj ext
Operation and maintenance of tube well/open well Regular operation of tube wells installed with pumping machineries with round the clock monitoring, including complete repair and maintenance of pump set with cost of material and labour required for repairing/rewinding, lowering and un-lowering etc. The scope of work also includes repair and maintenance of panel board, main switches, kit-Kates, Electric connections, service cable and submersible cables inclusive of cost of material and labour required for uninterrupted functioning of tube wells.It is also inclusive of complete repair and maintenance of pipes connected with pump and motor, its replacement, if required, regular upkeeping of log book etc. and other works as mentioned in tender document / scope of work complete in all respect and as directed by engineer in-charge. Industrial area sheoganj and sheoganj ext. open well [Month=12] x 1x1 = 12 Per tubewell per month
Operation and maintenance of pump house Regular operation and maintenance of pump houses located at WSS Complex/Complexes. The work includes operation of distribution line main valves for daily supply of water of the Industrial Areaat supply times specified by corporation. Regular Operation of pump house installed with existing centrifugal / Monoblock pump / motors, with round the clock monitoring, including complete repair and maintenance of pump sets, connecting suction/delivery pipes jointing material, panel, main switches, kit-Kates, Electric connections, service cable including cost of material and labour required for repairing / rewinding, removal and replacement etc. for uninterrupted functioning of Electric Panels and Pumpsets with regular up-keepment of log books, repair of leakages in pump glans and MS/CI/AC Pipeline system inside of WSS Campus complete, Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus complete in all respect as directed by Engineer in-charge. Industrial area sheoganj and sheoganj ext. [Month=12] x 1x1 = 12 Per pump house per month
maintenance of existing distribution / rising main pipe line system consisting of AC Pressure Pipeline / PVC/uPVC/HDPE/CI/ DI Lines for maintaining smooth water supply in area covered under the scope of work. The scope of work includes timely repairing of leakage in all existing distribution / rising main pipeline of all sizes by digging out suitable size of pit in soft & loose soil / hard soil including cutting of Bituminous / Cement Concrete / WBM / WMM surface at any site of work at no extra cost. It is also inclusive of cutting of pipe ends, fixing of pipe pieces with jointing material to make repair leak proof and refilling the pit / trench by excavated soil by ramming it at all sides of pipes & upto ground level. Contractor will do dewatering at his own level by making necessary arrangements, if required. Contractor will use their own T&P, however the pipe line and jointing materials, sluice valves, etc. shall be provided by the Corporation but the contractor shall have to deposit the damaged material in RIICO store. But no additional payment shall be made on account of transportation. Sheoganj and sheoganj ext [Month=12] x 1x1 = 12 Complete Job per month
Description of Work / Item(s)
Amount
Operation and Maintenance of Water Supply Scheme at Industrial Area sarneshwar
Operation and maintenance of tube well/open well Regular operation of tube wells installed with pumping machineries with round the clock monitoring, including complete repair and maintenance of pump set with cost of material and labour required for repairing/rewinding, lowering and un-lowering etc. The scope of work also includes repair and maintenance of panel board, main switches, kit-Kates, Electric connections, service cable and submersible cables inclusive of cost of material and labour required for uninterrupted functioning of tube wells.It is also inclusive of complete repair and maintenance of pipes connected with pump and motor, its replacement, if required, regular upkeeping of log book etc. and other works as mentioned in tender document / scope of work complete in all respect and as directed by engineer in-charge. Industrial Area Sarneshwar [Month=12] x 1x1 = 12 Per tubewell per month
Operation and maintenance of pump house Regular operation and maintenance of pump houses located at WSS Complex/Complexes. The work includes operation of distribution line main valves for daily supply of water of the Industrial Areaat supply times specified by corporation. Regular Operation of pump house installed with existing centrifugal / Monoblock pump / motors, with round the clock monitoring, including complete repair and maintenance of pump sets, connecting suction/delivery pipes jointing material, panel, main switches, kit-Kates, Electric connections, service cable including cost of material and labour required for repairing / rewinding, removal and replacement etc. for uninterrupted functioning of Electric Panels and Pumpsets with regular up-keepment of log books, repair of leakages in pump glans and MS/CI/AC Pipeline system inside of WSS Campus complete, Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus complete in all respect as directed by Engineer in-charge. Industrial area sarneshwar [Month=12] x 1x1 = 12 Per pump house per month
maintenance of existing distribution / rising main pipe line system consisting of AC Pressure Pipeline / PVC/uPVC/HDPE/CI/ DI Lines for maintaining smooth water supply in area covered under the scope of work. The scope of work includes timely repairing of leakage in all existing distribution / rising main pipeline of all sizes by digging out suitable size of pit in soft & loose soil / hard soil including cutting of Bituminous / Cement Concrete / WBM / WMM surface at any site of work at no extra cost. It is also inclusive of cutting of pipe ends, fixing of pipe pieces with jointing material to make repair leak proof and refilling the pit / trench by excavated soil by ramming it at all sides of pipes & upto ground level. Contractor will do dewatering at his own level by making necessary arrangements, if required. Contractor will use their own T&P, however the pipe line and jointing materials, sluice valves, etc. shall be provided by the Corporation but the contractor shall have to deposit the damaged material in RIICO store. But no additional payment shall be made on account of transportation. Industrial Area Sarneshwar [Month=12] x 1x1 = 12 Complete Job per month
UNIVERSAL ELECTRICALS
M/s Rathore Construction, Sirohi
MAAJI SA CONSTRUCTION
M/s Rathore Construction, Sirohi
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .