Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹1.4 L+₹20,546.02 (17.5%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
15 Apr 2026, 6:00 pmClosed
Executive Enigneer
pwd division udhampur
Stage Contract for the day to day maintenance works of the buildings of Udhampur Sub- Division to be executed during the year 2026-27. Group B- i) SE PWD Qtrs, ii) XEN PWD Qtrs, iii) SSP Qtrs, iv) 4 Nos Qtrs behind ADDC Qtrs, v) ADC Qtrs,
2026_PWDJK_307470_2
ENIT 07 of 2026-27 dated 07-04-2026
Open Tender
Civil Works
Percentage
365 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD Division Udhampur
₹30,000
25 Apr 2026
7 Apr 2026
16 Apr 2026
8 Apr 2026
15 Apr 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | - | Cum | - | - |
| - | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge | - | Cum | - | - |
| - | Extra for cutting reinforcement bars manually/by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional areas of R.C.C. or R.B. work) as per direction of Engineer-in-charge | - | Sqm | - | - |
| - | Extra for scraping, cleaning and straightening reinforcement from R.C.C or R.B work. | - | Kg | - | - |
| - | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | - | Cum | - | - |
| - | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m. (stacks of cleaned bricks shall be measured) : From brick work in cement mortar | - | No. | - | - |
| - | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead | - | - | - | - |
| - | of area of 3 Sqm. and below | - | Each | - | - |
| - | of area beyond 3 Sqm. | - | Each | - | - |
| - | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 meters lead | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_997485.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .