Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹11.4 LAccepted-Finance | ₹11.4 L | l1 | Accepted-Finance l1 is approved |
| 2 | l2₹11.5 LRejected-Finance 2313 SF 262 7 PETROL BUNK BACKSIDE P N ROAD TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | ₹11.5 L | l2 | Rejected-Finance l1 is approved |
| Sl No | Description | Qty | Unit | SENTHILNATHAN S L1 | ARUMUGAM L2 |
|---|---|---|---|---|---|
| 1.00Name of Work : ESTIMATE FOR CONSTRUCTION OF WAITING SHED IN FRONT OF KANNANGUDI PHC BUILDING IN KANNANGUDI PANCHAYAT KANNANGUDI UNION | |||||
| 2.00 | Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as storing shuddering and balling out water in necessary etc., completed for foundation as SS 20B. | 3.79 | m3 | 263 ₹996.77 | 264 ₹1,000.56 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors bills as per special condition including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation. | 0.9 | M3 | 5,979 ₹5,381.10 | 5,980 ₹5,382 |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete | 0.65 | m3 | 7,271 ₹4,726.15 | 7,272 ₹4,726.80 |
| 5.00 | Brick Work in cement mortar 1:5 mix using country bricks of size (8 ¾ x 4 ¼ x 2 ¼) including cost & conveyance of all materials to site including cost of cement which will be supplied by departmental section store at Sivagnagai and the cost there of will be recovered from the contractors bill as per special conditions including labour charges incidental charges and curing etc., complete for super structure. | 3.63 | m3 | 6,250 ₹22,687.50 | 6,251 ₹22,691.13 |
| 6.00 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to work site and including all other incidental charges etc., completed but executing cost and conveyance of steel fabrication charges and centering complete for lintel, plinth beam, sunshade & Roof slab. | 0.89 | m3 | 9,703 ₹8,635.67 | 9,704 ₹8,636.56 |
| 7.00 | Supply and fabrication of steel as per IS432/1960 (Tested Quality) including fabrication charges for all RCC items schedule in the tender including cost of steel which will be supplied by the department section store and the cost will be recovered from the contractors bill at the rate of specified in the special conditions appended including handling charges etc., completed. | 105 | KG | 91 ₹9,554.64 | 92 ₹9,659.63 |
| 8.00 | Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. | 9.97 | M2 | 1,095 ₹10,917.15 | 1,095 ₹10,917.15 |
| 9.00 | Plastering with cement mortar 1:5 12mm thick including cost & conveyance of all materials to work site including cement which will be supplied by the department from the departmental section store and the cost for the same will be recovered from the contractors bill at the rated and conditions specified in the special conditions from cement appended and all other charges etc., completed. | 29.96 | M2 | 288 ₹8,628.48 | 289 ₹8,658.44 |
| 10.00 | Paving the floor with best approved quality fine polished Granite Stone Slabs of size 1200 x 600 of 18 / 20mm thick of Synthetic Grey, Paradise and similar varieties with machine cut edges laid over a cement mortar bed of 20mm thick using cement mortar 1:3 | 9.97 | m2 | 2,627 ₹26,191.19 | 2,628 ₹26,201.16 |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
15 May 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER(B.P)
BLOCK DEVELOPMENT OFFICER (B.p)
CONSTRUCTION OF PHC CENTRE SHED KANNANGUDI HOSTIPAL
2026_RDTN_674743_1
CONSTRUCTION OF PHC CENTRE KANANNGUDI HOSTIPAL
Open Tender
Civil Works
180 days
UNION OFFICES KANNANGUDI
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹12,000
18 May 2026
11 May 2026
15 May 2026
11 May 2026
15 May 2026
11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work : ESTIMATE FOR CONSTRUCTION OF WAITING SHED IN FRONT OF KANNANGUDI PHC BUILDING IN KANNANGUDI PANCHAYAT KANNANGUDI UNION | - | - | - | - |
| 2 | Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as storing shuddering and balling out water in necessary etc., completed for foundation as SS 20B. | 3.79 | m3 | - | - |
| 3 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors bills as per special condition including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation. | 0.9 | M3 | - | - |
| 4 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete | 0.65 | m3 | - | - |
| 5 | Brick Work in cement mortar 1:5 mix using country bricks of size (8 ¾ x 4 ¼ x 2 ¼) including cost & conveyance of all materials to site including cost of cement which will be supplied by departmental section store at Sivagnagai and the cost there of will be recovered from the contractors bill as per special conditions including labour charges incidental charges and curing etc., complete for super structure. | 3.63 | m3 | - | - |
| 6 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to work site and including all other incidental charges etc., completed but executing cost and conveyance of steel fabrication charges and centering complete for lintel, plinth beam, sunshade & Roof slab. | 0.89 | m3 | - | - |
| 7 | Supply and fabrication of steel as per IS432/1960 (Tested Quality) including fabrication charges for all RCC items schedule in the tender including cost of steel which will be supplied by the department section store and the cost will be recovered from the contractors bill at the rate of specified in the special conditions appended including handling charges etc., completed. | 105 | KG | - | - |
| 8 | Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. | 9.97 | M2 | - | - |
| 9 | Plastering with cement mortar 1:5 12mm thick including cost & conveyance of all materials to work site including cement which will be supplied by the department from the departmental section store and the cost for the same will be recovered from the contractors bill at the rated and conditions specified in the special conditions from cement appended and all other charges etc., completed. | 29.96 | M2 | - | - |
| 10 | Paving the floor with best approved quality fine polished Granite Stone Slabs of size 1200 x 600 of 18 / 20mm thick of Synthetic Grey, Paradise and similar varieties with machine cut edges laid over a cement mortar bed of 20mm thick using cement mortar 1:3 | 9.97 | m2 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
BOQ_810970.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid