Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC 1 B R COLONY BACHRA TANDWA DISTT CHATRA JHARKHAND 835321 | 835321 | ₹1.6 L | L1 | Accepted-AOC L1 bidder and the offer is acceptable as per terms and conditions of e-NIT |
| 2 | Rejected-Technical RAY RANCHI | RANCHI | JHARKHAND | 829205 | - | - | Rejected-Technical The Offer is not acceptable as per terms and conditions of e-NIT |
| Sl No | Description | Qty | Unit | M/S VINAY ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Skilled Welder- 01 No. X 1 Shift X 06 days | 6 | No. | 877.45 ₹5,264.70 |
| 2.00 | Highly Skilled Filtter- 01 No. X 1 Shift X 06 Days | 6 | No. | 1,022.42 ₹6,134.52 |
| 3.00 | Semi- Skilled Helper- 02 No. X 1 Shift X 06 Days | 12 | No. | 734.66 ₹8,815.92 |
| 4.00 | Supervisor- 01 No. X 1 Shift X 06 Days | 6 | No. | 734.66 ₹4,407.96 |
| 5.00 | Supply and fitting of CF Pump | 2 | No. | 29,321 ₹58,642 |
| 6.00 | Supply and Fitting of Delivery Valve | 4 | No. | 3,651.5 ₹14,606 |
| 7.00 | Supply and Fitting of Coupling | 2 | No. | 1,863.9 ₹3,727.80 |
| 8.00 | Suply and fitting of Gasket 3mm | 10 | Sq.ft | 299.75 ₹2,997.50 |
| 9.00 | Fabrication of spray Nozzle Fitting | 4 | No. | 899.25 ₹3,597 |
| 10.00 | DA Gas Cylinder | 2 | No. | 1,940.2 ₹3,880.40 |
Tender Value
₹1.8 L
EMD Value
₹2,200
Closing Date
24 Sept 2025, 5:00 pmClosed
S.O(X),A-C Area
Office of the General Manager, Amrapali- Chandragupta Area, Honhe, Tandwa, Chatra, Jharkhand, 825321
Cleaning and Repairing of Tank Body and water line of 02 Nos. water tanker (WT-6 and Wt-7) of Amrapali Project
2025_CCL_343596_1
GM(A-C)/SO(X)/e-NIT/25-26/03
Open Tender
Excavation Department Work
6 days
Amrapali OCP, Amrapali-Chandragupta Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,200
9 Jan 2026
9 Sept 2025
26 Sept 2025
10 Sept 2025
24 Sept 2025
10 Sept 2025
10 Sept 2025 - 17 Sept 2025
Amount
Skilled Welder- 01 No. X 1 Shift X 06 days
Highly Skilled Filtter- 01 No. X 1 Shift X 06 Days
Semi- Skilled Helper- 02 No. X 1 Shift X 06 Days
Supervisor- 01 No. X 1 Shift X 06 Days
Supply and fitting of CF Pump
Supply and Fitting of Delivery Valve
Supply and Fitting of Coupling
Suply and fitting of Gasket 3mm
Fabrication of spray Nozzle Fitting
DA Gas Cylinder
Oxygen Gas Cylinder
Low Hydrigen electrode 3.15/4mm
Grinding Disc 4"
Painting with primer per sqft
Welding M/c Hiring 6 days
Grinding M/c Hiring 6 Days
Contractor profit @ 10% on Sl No. 01 to 04
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid