Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.0 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹25.7 L+₹1.6 L (6.73%)Rejected-AOC | L2 | Rejected-AOC Accepted | |
| 3 | L3₹25.9 L+₹1.8 L (7.52%)Rejected-AOC | L3 | Rejected-AOC Accepted | |
| 4 | L4₹26.2 L+₹2.1 L (8.83%)Rejected-AOC | L4 | Rejected-AOC Accepted | |
| 5 | L5₹28.6 L+₹4.5 L (18.8%)Rejected-AOC | L5 | Rejected-AOC Accepted |
| Sl No | Description | Qty | Unit | SELVAKUMAR L6 | L.Arivazhagan L1 | Karthikeyan Construction L3 | Sri Kaliyamman Constructions L4 | S DHANANJEYAN CONTRACTOR L2 | Mayilsamy Jadayan contractor L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of 60000 Lit OHT tank (12m Stage) at Erupalli AD Colony H/O Konangihalli | |||||||||
| 2.00 | Earth work excavation below G.L. and depositing on bank within an initial lead of 10.00 m and an initial lift of 2.00 for the following classification of soil
First depth of 0 to 2 m
In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S.20B , For Column Footing, For G.L Brace | 72.36 | m3 | 246.52 ₹17,837.2 | 201.4 ₹14,572.5 | 215.66 ₹15,604.29 | 204 ₹14,760.62 | 200 ₹14,471.2 Lowest | 224.1 ₹16,214.98 |
| 3.00 | Second depth of 2.0m to 3.0 m | 11.77 | m3 | 246.52 ₹2,902.53 | 201.4 ₹2,371.28 Lowest | 215.66 ₹2,539.18 | 204 ₹2,401.9 | 225 ₹2,649.15 | 224.1 ₹2,638.55 |
| 4.00 | Sand filling for foundation with clear river sand including cost of sand,watering,ramming and consolidation etc complete as directed by TWAD Board officers For Column Footing | 3.36 | m3 | 1,987.23 ₹6,685.04 | 1,522.27 ₹5,120.92 | 1,631.8 ₹5,489.38 | 1,260 ₹4,238.64 | 1,200 ₹4,036.8 Lowest | 1,665.43 ₹5,602.51 |
| 5.00 | PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m from GL. For footing | 5.05 | m3 | 1,987.23 ₹10,027.56 Lowest | 4,310.41 ₹21,750.33 | 4,628.9 ₹23,357.43 | 4,322 ₹21,808.81 | 5,000 ₹25,230 | 4,928.03 ₹24,866.84 |
| 6.00 | RCC in M 30 mix using10mm& 20mm size HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, curing, finishing etc.complete Below 1.5m from GL Column footing | 12.23 | m3 | 5,543.52 ₹67,802.79 Lowest | 7,187.75 ₹87,913.37 | 7,719.48 ₹94,416.96 | 7,462 ₹91,267.72 | 6,500 ₹79,501.5 | 8,574.4 ₹1,04,873.49 |
| 7.00 | 0m to 1.50m below GL | 2.52 | m3 | 9,210.34 ₹23,228.48 | 7,081.8 ₹17,860.3 | 7,605.5 ₹19,181.07 | 7,355 ₹18,549.31 | 6,600 ₹16,645.2 Lowest | 8,456.5 ₹21,327.29 |
| 8.00 | 0m to 1.00m above GL | 0.49 | m3 | 9,342.18 ₹4,577.67 | 7,189.51 ₹3,522.86 | 7,721.12 ₹3,783.35 | 7,464 ₹3,657.36 | 6,700 ₹3,283 Lowest | 8,576.35 ₹4,202.41 |
| 9.00 | 1.00m to 4.50m above GL | 3.5 | m3 | 9,601.89 ₹33,625.82 | 7,189.51 ₹25,177.66 | 7,721.12 ₹27,039.36 | 7,464 ₹26,138.93 | 6,800 ₹23,813.6 Lowest | 8,576.35 ₹30,034.38 |
| 10.00 | 4.50 m to 7.32 m above GL | 3.17 | m3 | 9,861.6 ₹31,251.41 | 7,401.67 ₹23,455.89 | 7,945.8 ₹25,180.24 | 7,679 ₹24,334.75 | 6,800 ₹21,549.2 Lowest | 8,812.45 ₹27,926.65 |
Tender Value
₹32.1 L
EMD Value
₹32,700
Closing Date
5 Feb 2026, 3:00 pmClosed
Block Development Officer (BP), Nallampalli
Block Development Officer (BP), Nallampalli
Nallampalli Block - Construction of 60000 Litre OHT Tank (12 M Height) at Erupalli AD Colony H/o. Konangihalli - Package No.TN04-P01- General Fund (Block Panchayat) 2025-26 - Nallampalli Block - P01
2026_RDTN_649021_1
Roc.No. 247/2025/A2 Dt. 23.01.2026 P01
Open Tender
Civil Works
Item Rate
Block Development Office, Nallampalli
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹32,700
23 Mar 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of 60000 Lit OHT tank (12m Stage) at Erupalli AD Colony H/O Konangihalli | - | - | - | - |
| 2 | Earth work excavation below G.L. and depositing on bank within an initial lead of 10.00 m and an initial lift of 2.00 for the following classification of soil
First depth of 0 to 2 m
In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S.20B , For Column Footing, For G.L Brace | 72.36 | m3 | - | - |
| 3 | Second depth of 2.0m to 3.0 m | 11.77 | m3 | - | - |
| 4 | Sand filling for foundation with clear river sand including cost of sand,watering,ramming and consolidation etc complete as directed by TWAD Board officers For Column Footing | 3.36 | m3 | - | - |
| 5 | PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m from GL. For footing | 5.05 | m3 | - | - |
| 6 | RCC in M 30 mix using10mm& 20mm size HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, curing, finishing etc.complete Below 1.5m from GL Column footing | 12.23 | m3 | - | - |
| 7 | 0m to 1.50m below GL | 2.52 | m3 | - | - |
| 8 | 0m to 1.00m above GL | 0.49 | m3 | - | - |
| 9 | 1.00m to 4.50m above GL | 3.5 | m3 | - | - |
| 10 | 4.50 m to 7.32 m above GL | 3.17 | m3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.72 MB
TenderdocumentP01.pdf
Tender Documents • 0.44 MB
BOQ_778080.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .