Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.6 LAccepted-AOC | ₹63.6 L Quoted ₹75.0 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹76.5 L+₹1.5 L (1.98%)Rejected-AOC | ₹76.5 L+₹1.5 L (1.98%) | L2 | Rejected-AOC Being L2 |
| 3 | L3₹78.4 L+₹3.4 L (4.51%)Rejected-AOC | ₹78.4 L+₹3.4 L (4.51%) | L3 | Rejected-AOC Being L3 |
| 4 | L4₹80.7 L+₹5.7 L (7.65%)Rejected-AOC | ₹80.7 L+₹5.7 L (7.65%) | L4 | Rejected-AOC Being L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical As per SBD Clause Sl No 4.5 A.(C) |
| Sl No | Description | Qty | Unit | GANESH KALITA L4 | M/S STAR INDIA L1 | triranv associates L3 | Md. Faruk Hussain Talukdar L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 350.9 | Cum | 235.22 ₹82,537.99 | 180 ₹63,161.46 Lowest | 189.26 ₹66,410.77 | 193.58 ₹67,926.64 |
| 2.00 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(Zone III) : 4 graded stone aggregate 20mm nominal size). | 24.11 | Sqm | 208.24 ₹5,020.85 Lowest | 316.4 ₹7,628.69 | 298.39 ₹7,194.45 | 305.21 ₹7,358.89 |
| 3.00 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 20.79 | Cum | 5,603.39 ₹1,16,470.38 | 4,760 ₹98,939.93 | 4,508.68 ₹93,716.07 Lowest | 4,611.59 ₹95,855.13 |
| 4.00 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation leveling and dressing and finishing the top smooth. | 43.36 | Sqm | 517.63 ₹22,442.37 | 476.7 ₹20,667.81 | 449.75 ₹19,499.36 Lowest | 460.02 ₹19,944.63 |
| 5.00 | Chlorpyriphos/ Lindane emulsifiable concentrate of 20% Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti- termite treatment (excluding the cost of chemical emulsion) : Along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300 mm including excavation channel along the wall & rodding etc. complete: | 38 | Ltr. | 164.74 ₹6,260.12 | 140 ₹5,320 | 132.55 ₹5,036.9 Lowest | 135.58 ₹5,152.04 |
| 6.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 22.15 | Cum | 6,500.14 ₹1,43,978.1 Lowest | 7,129.5 ₹1,57,918.43 | 6,720.1 ₹1,48,850.22 | 6,873.48 ₹1,52,247.58 |
| 7.00 | Columns, Pillars, Piers, Abutments, Posts and Struts. | 293.39 | Sqm | 659.49 ₹1,93,487.77 | 560 ₹1,64,298.4 | 560 ₹1,64,298.4 | 542.76 ₹1,59,240.36 Lowest |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 72 | Sqm | 252.52 ₹18,181.44 | 210 ₹15,120 | 203.19 ₹14,629.68 Lowest | 207.82 ₹14,963.04 |
| 9.00 | Suspended floors, roofs, landings, balconies and access platform. | 482.05 | Sqm | 628.57 ₹3,03,002.17 | 532 ₹2,56,450.6 | 505.77 ₹2,43,806.43 Lowest | 517.31 ₹2,49,369.29 |
| 10.00 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 335.43 | Sqm | 498.85 ₹1,67,329.26 | 420 ₹1,40,880.6 | 401.39 ₹1,34,638.25 Lowest | 410.55 ₹1,37,710.79 |
Tender Value
₹93.9 L
EMD Value
₹1.9 L
Closing Date
3 Apr 2024, 2:00 pmClosed
The Director SIPRD Assam
O/o The Director, SIPRD Assam, Khanapara, Ghy-22
Construction of Hostel Building G Plus 1 for DPRC at Tamulpur
2024_PNRD_37380_1
SIPRD/TECH/19/2023/50
Open Tender
Civil Works - Building
Item Wise
540 days
Tamulpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,878
₹1.9 L
Yes
O/o The Director, SIPRD Assam, Khanapara, Ghy-22
3 Feb 2026
16 Mar 2024
3 Apr 2024
16 Mar 2024
3 Apr 2024
20 Mar 2024
20 Mar 2024
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .