| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 CrAccepted-AOC | ₹17.5 Cr | L1 | Accepted-AOC Financial bid is Accepted at the price of Rs. 174958735.79 by the Employer. |
| 2 | L2₹18.8 CrRejected-Finance AGRA ROAD ETA | ETA | ETA | UTTAR PRADESH | ₹18.8 Cr | L2 | Rejected-Finance Due to L2 Rate |
| 3 | L3₹19.4 CrRejected-Finance 46 NEELAM MARKET ETAH | ₹19.4 Cr | L3 | Rejected-Finance Due to L3 Rate |
| 4 | L4₹19.8 CrRejected-Finance 488 101 KATRA BAZAR INDRANAGAR SITAPUR BRANCH ROAD DALIGANJ LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹19.8 Cr | L4 | Rejected-Finance Due to L4 Rate |
| Sl No | Description | Qty | Unit | VIKAS TRADERS L4 | RAM SANEHI AND SONS L2 | Awadh Construction L1 | SHIV KANT INFRATECH PVT. LTD. L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 7,025 | Cum | 60 ₹4.2 L | 50 ₹3.5 L | 55.8 ₹3.9 L | 42 ₹3.0 L |
| 2.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 7,025 | Cum | 63 ₹4.4 L | 40 ₹2.8 L | 59.15 ₹4.2 L | 42 ₹3.0 L |
| 3.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 27,900 | Cum | 122 ₹34.0 L | 60 ₹16.7 L | 45 ₹12.6 L | 115 ₹32.1 L |
| 4.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 9,920 | Cum | 144 ₹14.3 L | 60 ₹6.0 L | 134.29 ₹13.3 L | 135 ₹13.4 L |
| 5.00 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 6,895 | Cum | 5,128 ₹3.5 Cr | 4,900 ₹3.4 Cr | 4,500 ₹3.1 Cr | 5,200 ₹3.6 Cr |
| 6.00 | Scraping of old painted surface including disposal of scraped material upto 30m. Distance as per SOR 772(a). | 11,400 | sqm | 6 ₹68,400 | 6 ₹68,400 | 5.58 ₹63,612 | 7 ₹79,800 |
| 7.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 10,045 | cum | 5,514 ₹5.5 Cr | 5,100 ₹5.1 Cr | 5,036 ₹5.1 Cr | 5,400 ₹5.4 Cr |
| 8.00 | Providing and applying primer coat with SS-II grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. | 50,990 | sqm | 39.55 ₹20.2 L | 40 ₹20.4 L | 25 ₹12.7 L | 38 ₹19.4 L |
| 9.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Grade-II) | 4,844 | cum | 11,444 ₹5.5 Cr | 11,300 ₹5.5 Cr | 10,080 ₹4.9 Cr | 11,100 ₹5.4 Cr |
| 10.00 | Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 51,440 | sqm | 11.57 ₹6.0 L | 13 ₹6.7 L | 10.76 ₹5.5 L | 12 ₹6.2 L |
Tender Value
Refer Docs
EMD Value
₹30 L
Closing Date
5 Feb 2026, 12:00 pmClosed
S.E.Sitapur/Kheri Circle PWD Sitapur
Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
Widening and Strengthening of Rasoolpur Gwari Rajapur Israuli Chakdaha Road (ODR) in Km 15.00 to 24(700) in District Sitapur
2026_CEUCZ_1110719_1
435/352C/E.TENDER/STP-LMP/25 Dt. 19.01.2026
Open Tender
Civil Works - Roads
365 days
sitapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹30 L
Yes
Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
5 Mar 2026
29 Jan 2026
5 Feb 2026
29 Jan 2026
5 Feb 2026
29 Jan 2026
2 Feb 2026
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Scraping of old painted surface including disposal of scraped material upto 30m. Distance as per SOR 772(a).
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and applying primer coat with SS-II grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Grade-II)
Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Grade-II
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
RCC Drain Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Furnishing and Placing Reinforced/ Prestressed cement concrete M-20 Grade in super-structure as per drawing and Technical Specification
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Culverts Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106. B 1000 mm dia (As per Estimator)
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4
Plaster with cement mortar (1:4) 12 mm thick on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.4 , 1204 and 1208.4
Bridge Dismantling Brickwork or stone work in lime and cement mortar and including stacking of material as directed by E/I with in a distance of 60 mtr (200feet) As per sor Item no 692&694 0f Chap-17
Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.as per technical specification clouse 408
Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations .
Furnishing and placing reinforced cement concrete in super structure as per drawing and Technical Specifications. (RCC Grade M 30).
Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses 1002, 1010 and 1202
Plane/Reinforced Cement concrete in open foundation complete as per drawing and Technical Specifications. (M-20)
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification.1300&2200 SN.13.2
100 mm dia PVC Pipe Including Supply and Fixing (Weep Holes).
Boring with 100 mm dia casing pipe for dewatering including cost of pipes , other materials, labour charges etc. complete.
Dewatering the ground water for trenches with hire, operational & fuel charges of pump with oprater complete.
Construction of subgrade and earthen shoulder with approved material obtained from borrow pits(carted earth) with all lift & lead , transporting to site, spreading,grading to required slope and compected to meet requirement of table 300-2.
Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling, concrete and masonary works in head walls
Routine maintenance charge @ 2.50% of total cost, up to 5 Years for any diffect / damaged found after construction of all works including restoration of paved surface , shoulders , culverts road furniture etc complete. As per direction of E/I.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
ADDENDUMS1.pdf
Tender Documents • 1.08 MB
NIT435.pdf
Tender Documents • 0.73 MB
SBD2.pdf
Tender Documents • 0.73 MB
BOQ_2051365.xls
BOQ • 0.24 MB
SC.pdf
Additional Documents • 0.33 MB
Download all tender documents and submit your bid