Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC 303 B DIAMOND HARBOUR ROAD BEHALA KOLKATA 700034 | KOLKATA | WEST BENGAL | 700034 | ₹9.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.3 L+₹33,190.20 (3.69%)Rejected-Finance | ₹9.3 L+₹33,190.20 (3.69%) | L2 | Rejected-Finance L2 |
| 3 | L3₹9.8 L+₹77,353.86 (8.60%)Rejected-Finance | ₹9.8 L+₹77,353.86 (8.60%) | L3 | Rejected-Finance L3 |
Tender Value
₹9.0 L
EMD Value
₹18,000
Closing Date
16 Feb 2026, 12:00 pmClosed
DG(CIVIL)
5, S.N. BANERJEE ROAD
CONSTRUCTION OF VERTICAL ENCLOSER (PART-II) AROUND THE EXISTING BOOSTER PUMPING STATION AT DESHAPRIYO PARK IN WARD NO 85, BR-VIII.
2026_KMC_1000312_1
KMC/DGC/VIII/85/62/25-26/R
Open Tender
CIVIL WORKS
Percentage
25 days
W-85
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹18,000
24 Sept 2026
6 Feb 2026
18 Feb 2026
6 Feb 2026
16 Feb 2026
6 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m (3rd Corrigenda & addenda dated 04.06.2018) | 0.74 | MT | 72,603 | ₹53,653.62 |
| 2 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.) | 26 | SQM | 38 | ₹987.96 |
| 3 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white) | 24.9 | SQM | 81 | ₹2,016.9 |
| 4 | BUILDING WORKS(R) ALUMINIUM WORKS??(17)Supplying, fitting & fixing of Aluminium fixed partion wall of all aluminium sections viz top, bottom and side member, intermediate member, glazing clip made of Aluminium Alloy Extrusions conforming to IS: 733-1983 and IS: 1285-1975, annodized conforming to IS:1868- 1983, fitted with all other accessories viz. EPDM gusket,cleat, angle screws etc. including labour charges for fitting and fixing of aluminium fixed partition wall with glass / panel board all complete as per architectural drawings and direction of Engineer-in-charge. (Excluding cost of glass/ panel board, 10-12 Micron thickness Annodizing film. Natural white.. a) for unsupported length of vertical member upto 1.50m. height of both ends of vertical member restrained but panel with in 0.90 sqm. (unit wt of Top, bottom & side member @1.366 kg/m ; intermediate member @ 1.443 kg/m; glazing clip: 0.167 kg/m respectively) [Note : for estimate purpose construction wing may consider weight of Al-Sections for Partition wall @ 5.7 Kg per Sq.M] | 552.8 | KG | 391 | ₹2,16,144.41 |
| 5 | BUILDING WORKS(R) ALUMINIUM WORKS??(15)Supplying,fitting & fixing of 2-Track / 3-Track Aluminium sliding Window of all Aluminium sections viz. window frame (top,bottom & side frame), shutter (top, bottom, side & interlock member) made of aluminium alloy extrusions conforming to IS 733-1983 & IS 1285-1975, annodised conforming to IS 1868-1983, fitted with all other accessories viz. PVC roller, EPDM gasket, maruti lock, screws etc. including labour charges for fitting & fixing of aluminium 2-track/3-track sliding window with fixing of glass (excluding cost of glass) all complete as per architectural drawings and direction of Engineer-in-charge. 10-12 Micron thickness Annodizing film Natural white. For 2-Track window : Members for Bottom frame @ 0.875 Kg per Mtr. and for Top and Side frame @ 0.778 Kg per Mtr. and for shutter Bottom and Top member @ 0.472 Kg per Mtr., Style side member @ 0.493 Kg per Mtr. and Interlock member @ 0.612 Kg per Mtr. For 3-Track window : Members for Bottom frame @ 1.233 Kg per Mtr.and for Top and Side frame @ 1.067 Kg per Mtr. and for shutter Bottom and Top member @ 0.472 Kg per Mtr., Style side member @ 0.493 Kg per Mtr. and Interlock member @ 0.612 Kg per Mtr. [Note : for estimate purpose construction wing may consider weight of 2-track Aluminium window @ 5.5 Kg per Sq.M.and 3-track Aluminium window @ 6.5 Kg per Sq.M] | 410.4 | KG | 448 | ₹1,83,860.1 |
| 6 | BUILDING WORKS(R) ALUMINIUM WORKS??(9)Supplying bubble free float glass of approved make and brand conforming to IS: 2835-1987. vi) 6mm thick coloured / tinted / smoke glass. | 187.66 | SQM | 661 | ₹1,24,043.26 |
| 7 | BUILDING WORKS(R) ALUMINIUM WORKS??(27)Providing and fixing exterior quality Aluminium Composite Panel (ACP) wall cladding on existing Al. /MS frame work with GI brackets, ACP fixed on the existing frame work by folding the edges of ACP panel (Engraving the rear surface of ACP sheet) with CP angles, cleats and strainless Steel screws forming groves at the periphery of ACP panel. Such grooves filled with foam and silicon sealant etc. complete with all materials (but including the cost of silicon sealant), labour, scaffolding and all other incidental charges complete in all respect as per specification and direction of Engineer-in-charge. (Mode of payment is on finished surface area of ACP) (b) 4mm thick (0.50mm Al.+3.0mm LDPE +0.50mm Al. PVDF coating) | 60.46 | SQM | 2,878 | ₹1,74,003.88 |
| 219 | Sub Total | - | - | - | - |
| 220 | GST 18% | 1 | Nos | - | - |
| 221 | CESS 1% | 1 | Nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
civil_oid_compressed.pdf
Additional Documents • 1.12 MB
TF.pdf
Tender Documents • 1.07 MB
BOQ_2450772.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .