| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-AOC A 52 CHANAKYA PLACE NEW DELHI BRANCH OFFICE B 175 NANDGRAM GHAZIABAD PIN CODE 110045 | NEW DELHI | NEW DELHI | DELHI | 110045 | ₹3.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 CrRejected-Finance GIJROLI DY LIKELY RELATED TO THE WORK LOCATION MENTIONED SPECIFIC ADDRESS NOT PROVIDED FOR THE CONTRACTOR | DAMAN | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396210 | ₹3.3 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹3.5 CrRejected-Finance CHANDAULI | UTTAR PRADESH | 221009 | ₹3.5 Cr | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | MEGHENDRA PAL SINGH CONTRECTOR L2 | gopi constech pvt. ltd. L1 | ARVIND KUMAR SINGH L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of private land and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 1.00 km. lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance as directed by Engineer in charge & also including all cost of borrwed earth from pvt. land, material, labour & T&P etc. complete. | 10,312 | M3 | 100 ₹10.3 L | 180 ₹18.6 L | 88 ₹9.1 L |
| 2.00 | Supplying and Filling new empty cement bags with transported earth/RBM/silt upto a lead of 1.0 Km., hand sewing with suja & sutli and placing in position as directed by Engineer in charge & also including all cost material, labour & T&P etc. complete. | 37,800 | Nos | 5 ₹1.9 L | 21 ₹7.9 L | 15 ₹5.7 L |
| 3.00 | Dismantling of old damaged Red sand stone including cost of all material, labour and T&P etc. complete. | 13,150 | M2 | 20 ₹2.6 L | 21 ₹2.8 L | 28 ₹3.7 L |
| 4.00 | Centering and shuttering (steel shuttering) for C.C. work including cost of all labour, material and T&P etc. Complete. | 200 | M2 | 450 ₹90,000 | 500 ₹1 L | 500 ₹1 L |
| 5.00 | Laying C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 40 | M3 | 2,800 ₹1.1 L | 6,244.5 ₹2.5 L | 6,000 ₹2.4 L |
| 6.00 | Supply and Laying 60 mm thick Red sand stone with 1:3 CM including cost of all material, labour and T&P etc. complete. | 11,225 | M2 | 2,400 ₹2.7 Cr | 2,150 ₹2.4 Cr | 2,600 ₹2.9 Cr |
| 7.00 | Laying old Red sand stone with a grout of average 20 mm thick cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade . incliding cost of all materials, labour and T&P etc. required for proper completion of work including cost of all material, labour and T&P etc. complete. | 2,806 | M2 | 600 ₹16.8 L | 775.1 ₹21.7 L | 410 ₹11.5 L |
| 8.00 | Surface dewatering of foundation and launching apron i/c of all arrangement in KWH by diesel pump sets. including all cost material, labour & T&P etc. complete. | 42,969 | KWH | 27 ₹11.6 L | 11.9 ₹5.1 L | 25 ₹10.7 L |
| 9.00 | Earth work in removal of coffer dam & cross bar including all lead & lift with its proper disposal as per direction of Engineer-in-charge including cost of all material, labour and T&P etc. complete. | 4,125 | M3 | 40 ₹1.6 L | 72 ₹3.0 L | 70 ₹2.9 L |
| 10.00 | Stone work ashlar sunk or moulded or sunk and moulded upto floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) including pointing with white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : Red sand stone | 16 | M3 | 60,000 ₹9.6 L | 68,781 ₹11.0 L | 65,000 ₹10.4 L |
Tender Value
₹4.4 Cr
EMD Value
₹8.7 L
Closing Date
17 Nov 2025, 1:00 pmClosed
Superintending Engineer
3rd Circle Irrigation Works 139 Mall Road, Pratappura Agra
Repair and restoration work of old ghats constructed from Bengali Ghat to Rani Ghat situated on the right bank of River Yamuna in Distt. Mathura.
2025_UPIDC_1088602_1
08/SE/2025-26
Open Tender
Civil Works
180 days
Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹8.7 L
Office of The SE 3rd Circle Irrigation Works, Agra
30 Dec 2025
7 Nov 2025
17 Nov 2025
7 Nov 2025
17 Nov 2025
7 Nov 2025
12 Nov 2025
Amount
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of private land and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 1.00 km. lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance as directed by Engineer in charge & also including all cost of borrwed earth from pvt. land, material, labour & T&P etc. complete.
Supplying and Filling new empty cement bags with transported earth/RBM/silt upto a lead of 1.0 Km., hand sewing with suja & sutli and placing in position as directed by Engineer in charge & also including all cost material, labour & T&P etc. complete.
Dismantling of old damaged Red sand stone including cost of all material, labour and T&P etc. complete.
Centering and shuttering (steel shuttering) for C.C. work including cost of all labour, material and T&P etc. Complete.
Laying C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering.
Supply and Laying 60 mm thick Red sand stone with 1:3 CM including cost of all material, labour and T&P etc. complete.
Laying old Red sand stone with a grout of average 20 mm thick cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade . incliding cost of all materials, labour and T&P etc. required for proper completion of work including cost of all material, labour and T&P etc. complete.
Surface dewatering of foundation and launching apron i/c of all arrangement in KWH by diesel pump sets. including all cost material, labour & T&P etc. complete.
Earth work in removal of coffer dam & cross bar including all lead & lift with its proper disposal as per direction of Engineer-in-charge including cost of all material, labour and T&P etc. complete.
Stone work ashlar sunk or moulded or sunk and moulded upto floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) including pointing with white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : Red sand stone
stone work ashlar sunk or moulded in cornices.
stone work ashlar sunk or moulded or sunk and moulded or carved in : Circular or polygonal pillars
MEGHENDRA PAL SINGH CONTRECTOR (BID ID -5682638)
ARVIND KUMAR SINGH (BID ID -5682530)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1997585.xls
BOQ • 0.33 MB
TenderDocumentGhat.pdf
Tender Documents • 2.26 MB
Download all tender documents and submit your bid